    Soil Nailing Guide Specification - Title ? Table Of Contents - Model Specification - 1. General - 1.1 Purpose Of Specification

    This specification, along with the drawings, encompasses all designs, materials, products, accessories, tools, equipment, services, transportation, labor and supervision, installation techniques, and

    Jan 1, 2010

  • DFI
    Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging Project

    By José Carlos do Amaral, Marcelo Groszownik, Jorge Beim

    "Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the

    Jan 1, 2015

  • DFI
    Pile Test Results - 1-15 Corridor Reconstruction Project, Salt Lake City, Utah (Abstract Only) - DFI Member Conference - Seattle, 1998

    By D. M. Holloway

    As a part of the 1-15 Reconstruction Project, static and dynamic (high-strain) testing methods formed the basis to estimate long-term axial capacities, and to assess the magnitudes of bearing capacity

    Jan 1, 1998

  • DFI
    Bi-directional Load Testing Using Donut Super Cells For Hangzhou West Railway Station

    By Antonio Marinucci, Robin Mao

    The new Hangzhou West Railway Station, which is currently in the early stages of construction, will be located in the city of Hangzhou, China. To accomplish the ambitious goals of the project, the con

  • DFI
    Foundation Reuse And Strengthening Works At 65 And 67-69 Whitfield Street, London

    By Shields H. Arup

    The paper describes the innovative foundation reuse and strengthening works for two buildings in Central London. A 1950s building on piled foundations (65 Whitfield St) and a 1930s building (67-69 Whi

    May 1, 2022

  • DFI
    Augered Cast-In-Place Piles - Friday, May 5, 2006 - Title ? Table Of Contents - A Historical Perspective On Current Cast-In-Place Piling Practice

    By Willie M. NeSmith

    Cast-in-place piling are a staple of the deep foundation industry, and are used (in various forms) worldwide. In assessing the application of cast-in-place piles, it is of value to reflect on the dev

    Jan 1, 2006

  • DFI
    Probabilistic Subsurface Characterization for Transmission Line Foundation Design

    By Neil T. Russo, Peter M. Kandaris, Jogi S. Gadok

    "Assessment of subsurface data for foundation design in support of long high voltage electric transmission lines is best accomplished using a probabilistic strategy since only a small portion of struc

    Jan 1, 2017

  • DFI
    Inspector?s Guide to Augered Cast-in-Place Piles

    By Matthew E. Meyer

    The intent of this manual is to provide guidelines for observing and documenting the installation of ACIP piles. The manual may also serve as a guide for the training of inspection personnel. It is ex

    Jan 1, 2010

  • DFI
    Inspector?s Guide To Augered Cast-In-Place Piles - Second Edition - Title ? Table Of Contents - 1.0 General

    This manual is limited to Augered Cast-in-Place (ACIP) piles constructed using a hollow stem continuous flight auger. 1.1SCOPE AND LIMITATIONS The intent of this manual is to provide guidelines

    Jan 1, 2010

  • DFI
    Estimation Of Modular Ratio And Modulus Of Deformation Of Granular Piles From In-Situ Compression Tests

    By Padmavathi V, M. Najamuddin, M. R. Madhav

    Granular piles are one of the leading ground improvement techniques, adopted for the betterment of bearing capacity and reduction in settlements of the foundations and also to accelerate consolidation

    Sep 1, 2022

  • DFI
    Design and Construction of Driven H-Piles for Landslide Stabilization in Marlboro Clay

    By Charbel Khoury, Kwabena Ofori-Awuah, Kofi B. Acheampong

    "Following heavy rains in spring of 2014, Prince George’s County officials issued a mandatory evacuation for homes in the Piscataway Hills subdivision of Fort Washington, Maryland where a landslide al

    Jan 1, 2017

  • DFI
    Ethical and Risk Aspects of Deep Foundation Subcontracts

    By Alexander Filotti, Richard Kalson

    "In the last decade, the construction industry has witnessed significant changes in the project delivery systems and contractual relationships between the general contractors (GC) and Deep Foundation

    Jan 1, 2016

  • DFI
    Systematic Evaluation of Driving Criteria and Performance of Tapered Piles in Glacial Sand

    By Terrence M. Carroll, Chu E. Ho, Dimitrios Niarchos

    "Construction of the new extension to Terminal 4 at John F Kennedy International Airport in Queens, New York involved the application of tapered piles for foundation support. Initial design based on p

    Jan 1, 2017

  • DFI
  • DFI
    Anchored Hollow Bar Tangent Pile System For Underpinning

    By Marco D. Boscardin, Benjamin H. MacKinney, Kenneth R. Allard, Kenneth A. Pidgeon, Adriane G. Boscardin

    This paper presents a case history for a unique application of a system of vertical micropiles with horizontal soil nail bracing and shotcrete facing for underpinning. The system was used to support a

    Oct 1, 2022

  • DFI
    A Discussion Of Inconsistencies Between Lrfd And Asd Methods For Geostructural Design Applications Of The Aashto Bridge Design Specifications

    By Dimitrios Polantzas P. E., Collin E. Sweeney E. I. T., Franklin M. Grynkiewicz P. E., Leili Javidanian P. E.

    In the latest AASHTO design specifications, the Load and Resistance Factor Design (LRFD) method is prescribed for the design of retaining walls. However, inconsistencies arise when LRFD is used for re

    Oct 1, 2022

  • DFI
    Design Considerations For Laterally Loaded Free-Head Rigid Piles In Engineering Practice

    By O. Craciun, C. A. Bridges, M. Cai, J. Sugawara

    There are a number of methods that can be adopted for predicting the ultimate lateral resistance of a free-head rigid pile, from the conventional Brinch Hansen and Broms solutions to three-dimensional

    Nov 1, 2022

  • DFI
    Cooling Water Intake Shafts for the Oak Creek Expansion

    By Edward Jacobsen, Patrick J. Lydon

    "The ongoing expansion of the Oak Creek Power Plant in Oak Creek, Wisc., includes a tunnel bored in rock that connects to four vertical intake shafts approximately 1.5 miles (2.4 km) offshore in Lake

    Jan 1, 2008

  • DFI
    How Choice Of Foundation Can Alter The Fate Of A Bridge Project – 3 Case Studies

    By Alok Bhowmick

    The most uncertain and challenging part of a bridge design and construction is the ‘Choice of foundation’. During the planning and conceptual design stage, it is extremely important to choose the righ

    Nov 1, 2022

  • DFI
    Piled Foundations for the New Wembley Stadium, London

    By Anthony L. Reynolds, Clifford J. Wren

    "The adoption of a significant pile testing regime, the use of Eurocode 7 as the design standard, the development of lean construction techniques, and lateral thinking in overcoming some considerable

    Jan 1, 2005