Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Load Tests on Large Diameter Bored Piles in Cemented Sands (e34a0a63-0fa5-40f6-8850-5a2442305f1f)By Nabil F. Ismael
"Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait. T
Jan 1, 2017
-
Integrity Evaluation Of Driven Concrete Piles Utilizing Embedded Data CollectorsBy Donald T. Robertson
This paper presents case histories of driven concrete pile damage detected with dynamic testing methods utilizing strain gages and accelerometers embedded in the pile at the prestressing yard during p
-
Integrity Evaluation of Driven Concrete Piles Utilizing Embedded Data Collectors (ac1e1b32-2f59-488d-aca4-5ee1b43eb226)By Donald T. Robertson, Kurt Hecht, Michael K. Muchard
"This paper presents case histories of driven concrete pile damage detected with dynamic testing methods utilizing strain gages and accelerometers embedded in the pile at the prestressing yard during
Jan 1, 2017
-
Design Of Drilled Shaft Supported Mat Moscow TowersBy Issa S. Oweis
Two Towers are currently under construction in Central Moscow in the Russian Federation. Building A is a 96 story tower and Building B is a 65 story tower. The columns in both structures bear on a t
Jan 1, 2007
-
A Comparative Study on Behavior of Bucket Pile in Sand According to Installation MethodsBy Jinung Do, Sung-Ryul Kim, Juhyung Lee
"Model tests have been performed to investigate the vertical, horizontal and cone tip resistances of bucket pile embedded in sand by different installation methods; suction force by pump and jacking f
Jan 1, 2016
-
Comparison Between Statnamic And Static Load Testing Of Drilled Shafts In Varved ClayBy Carl Ealy
Static and STATNAMIC (STN) rapid load test (RLT) was performed on 3-drilled shafts. The purpose of the RLT part of the study was to obtain data in support of FHWA research on innovative load testing m
Jan 1, 2002
-
Settlement Control Of A Road Embankment Using Vertical DrainsBy Wei Tu
A grade separation was required to allow uninterrupted traffic crossing for a busy rail spur and a county road. The grade separation was achieved by creating a 30-foot (9-meter) high embankment that
Jan 1, 2009
-
Behaviour Of Laterally-Loaded Piles Centrifugal And Numerical Modelling ? SynopsisBy W. H. Craig
Techniques have been developed for installing model piles into beds of soil under high sustained acceleration levels aboard a centrifuge. These piles have been subjected to static and/or cyclic latera
Jan 1, 2010
-
Lessons Learned From Mitigating Early Project Delays To Deep Foundation WorkBy Jeffery L. Ottesen
Early construction delays can jeopardize timely completion of subsequent work. As an early construction activity, and due to many unforeseen issues, deep foundation work inherently bears great potenti
Jan 1, 2002
-
Suwanee American Cement Plant, Branford, Florida: A Case Study Of Large Diameter Continuous Flight Auger Design Build FoundationsBy Gordon King
This paper presents a case study of large diameter continuous flight auger (CFA) piles and drilled shafts utilized for foundation support of a series of heavily loaded cement plant structures at the S
Jan 1, 2003
-
Load Tests On Large Diameter Bored Piles In Cemented SandsBy Nabil F. Ismael
Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait.
-
Risks Associated With Finite Element Modelling Of Cut And Cover StructuresBy Tony Suckling
The commercially available finite element program Plaxis has a key benefit over other finite element analysis programs in that it has a relatively simple user interface to input and output data. This
Jan 1, 2010
-
Soil Improvement in Marina Coastal Expressway Project (C485) with Cement Deep Mixing (CDM) MethodBy Yoshinori Kurumada, Tatsuo Nagatsu, Keiji Uchida
"Cement deep mixing method has been utilized in the process of construction of an underwater tunnel in Singapore. The soil was improved by this method to prevent undesirable heaving of the soil below
Jan 1, 2015
-
2100 L Street Underpinning & Support Of ExcavationBy Charles R. Conlon, Matthew J. Niermann
This paper presents the underpinning and excavation support systems used for construction at 2100 L Street in Washington, DC. The excavation for the proposed building extended below bedrock, which pre
-
Session 15 "Jet Grouting IV"By Mitsuhiro Shibazki
I can't answer that question but I am looking at Andy, my co-author, and he says we didn't measure it. No movement. If I understand it correctly, how do we handle lateral forces in shear? T
Feb 10, 2003
-
Reliability Analysis of a Drilled Shaft Stabilized Slope System (e386e5ff-5c43-4c35-910f-4eb413f46379)By Lin Li
A reliability based analysis method for a drilled shaft stabilized slope system is presented in this paper. In the past effort, a deterministic method using the limiting equilibrium method of slices f
Jan 1, 2017
-
Reliability Analysis Of A Drilled Shaft Stabilized Slope SystemBy Lin Li
A reliability based analysis method for a drilled shaft stabilized slope system is presented in this paper. In the past effort, a deterministic method using the limiting equilibrium method of slices f
-
Dynamic Characterization Of Drilled Shafts On Doremus Avenue BridgeBy Martina Balic
Dynamic properties of the drilled shaft foundations supporting Doremus Avenue Bridge were determined by forced vibration testing. The main objectives of the substructure testing at Doremus Avenue Brid
Jan 1, 2004
-
High Strain Testing Of Large Diameter, High Capacity Unlined Bored Piles ? IntroductionBy Dhanvin B. Mehta
Pile testing is generally understood as static load test. It is our common experience that for high capacity, large diameter bored piles, static testing is expensive and time consuming. It is practica
Jan 1, 1996
-
Design Of Well Cap, Pier And Well Steiming At The Junction Using Strut-And-Tie Model - SynopsisPier, well cap and steining junction is a complicated 3-d re-ion. The prevalent design procedure for the pier, well cap and steining in isolated manner is not rational. In absence of an integrated app
Jan 1, 1996