Cased CFA Pile – An Alternative Piling Method – A Chance for Technical and Economical SolutionsBy John R. Grillo, Gordian Ulrich, Franz-Werner Gerressen
Most geotechnical construction professionals are aware of piling using hydraulic drill rigs and the so-called Kelly drill mode. Kelly drilling has many advantages as it can work with a wide range of t
Jan 1, 2019
-
A Proposed Model For Soil/Auger Interaction During Installation Of Screw Piling Augers - SynopsisBy J. W. Slatter
Cast in situ screw piling techniques (both displacement and non displacement) have seen considerable growth in recent years due to competitive production rates, low noise and vibration free installati
Jan 1, 2000
-
Augered Cast-In-Place Pile Installation, Grand Forks, North DakotaBy Kyle A. Kershaw
The City of Grand Forks, North Dakota obtains drinking water from both the Red River and Red Lake River through a system of raw water intakes, shallow pipelines, and pump stations. However, during flo
Jan 1, 2003
-
Adapting Multiple Ground Improvement Techniques for Uniform Performance over Heterogeneous Natural and Modified OverburdenBy Michael J. Marasa
"Geotechnical engineering and construction primarily relies on the subsurface characteristics of the particular site; however, obtaining both accurate and precise information on those features is chal
Jan 1, 2017
-
Sustainability and Consideration of the Re-Use of Foundations for the Hurricane Deck BridgeBy Timothy C. Siegel, Paul J. Axtell
The Missouri Department of Transportation (MoDOT) recently replaced the Hurricane Deck Bridge that carries Highway 5 traffic across the Osage Arm of the Lake of the Ozarks in Camden County, Missouri.
Jan 1, 2017
-
A Numerical Model For Load Transfer And Settlement Of Bored Cast In-Situ PilesBy Joshua R. Omer
A numerical model is developed for predicting the load transfer and settlement behaviour of vertically loaded, bored cast in-situ piles. Based on analysis of full-scale pile tests, closed-form equatio
Jan 1, 2010
-
Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric ProjectBy James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford
"Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock
Jan 1, 2017
-
DEEP FOUNDATIONS INSTITUTE 45th ANNUAL CONFERENCE ON DEEP FOUNDATIONSBy Sebastian Lobo-Guerrero
Welcome to DFI45! our first on-line annual meeting. We cannot deny the severe impacts that the COVID19 pandemic is having in our industry and our lives. We extend our support to all of our members tha
Oct 27, 2020
-
Design and Quality Control of Soil Mix Walls for Earth and Water Retaining StructuresBy Nicolas Denies, Jeroen de Leeuw, Bart Lameire, Jan Maertens, André Vervoort, Flip Hoefsloot, Noël Huybrechts, Flor De Cock
"In recent years, the Deep Mixing Method has increasingly been applied for the construction of earth and water retaining structures. From practice, it has been experienced that there is a real need to
Jan 1, 2015
-
Is Excess Pore Water Pressure Build Up An Engineering Demand Parameter For Excavation Analyses?By A. Felipe Uribe-Henao, Camilo Ballesteros, Luis G. Arboleda-Monsalve, David G. Zapata-Medina
Conventional excavation analysis based on total or effective stress methods can result in inaccurate estimation of ground movements when impervious soil conditions or rapid excavation sequences are no
-
2D And 3D Ansys Modeling For Deep Excavation And Evaluation Of Soil-Structure InteractionBy Yahia M. Al-Smadi
Effect of lateral loading against existing sheet pile wall and distribution of gravity loading due to various number of construction loading scenarios were studied. The objective of this effort was t
Jan 1, 2010
-
Real-Time Monitoring During Shaft Contruction For The Sound Transit Ulink I-5 UndercrossingBy Pierre Gouvin
This paper describes the design, installation and monitoring of a state of the art real time geotechnical/structural instrumentation monitoring system to facilitate tunnel construction under Interstat
Jan 1, 2010
-
D-Wall Extreme – Contrast Between Going Deep And Getting SmallBy Alexander Blatt, Franz-Werner Gerressen
Diaphragm wall technique is usually used to construct structural elements in the ground, commonly used for retention systems, permanent foundation elements or deep groundwater barriers, named Cut-Off-
May 1, 2022
-
Vacuum Wellpoints For Slope Stabilization In The Foundation Pit During A Dry Dock ConstructionBy Mai Yuanjian
The stabilization effect in large excavation slope with vacuum wellpoints system during construction of a dry dock located in Guangzhou is introduced in this paper. In-situ observations indicate that
Jan 1, 1991
-
Cape Wind Offshore Wind Farm – Electrical Service Platform – Substructure Jacket DesignBy S. Chilka, I. Maloney, J. Brady
"The purpose of this project was to design the Electrical Service Platform (ESP) for the Cape Wind Offshore Wind Farm. The ESP structure comprises two primary parts: the topside platform housing the e
Jan 1, 2017
-
A Full-Scale Test by Low-Improvement-Rate Soil in Combination with Crushed-Stone Mat on Peaty GroundBy H. Hayashi, M. Yamaki, H. Hashimoto, T. Yamanashi
"In an experiment on a trial embankment, the deformation mode of the improved ground at the toe of the embankment was compared with the deformation mode of the unimproved ground. This comparison showe
Jan 1, 2015
-
Dynamic Centrifuge Model Tests on Pile-Type Deep Mixing Method Reducing Lateral Flow of Liquefied GroundBy Tsuda Wakaki, Naoki Takahashi, Natsuki Okuno, Hidenori Takahashi, Ikuo Towhata, Yoshiyuki Morikawa
"Deep mixing (DM) method has been increasingly employed as a countermeasure against subsoil liquefaction in recent years. Pile-type DM, however, is considered to have little effect as a liquefaction c
Jan 1, 2015
-
Non-Destructive Testing Methods for Drilled Shaft and ACIP Piles (34748882-cb96-4081-9967-58c48901bc15)By George Piscsalko
"Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,
Jan 1, 2017
-
Secant Pile Top-Down Construction for a Drainage Channel in Puerto Rico: An OPA FinalistBy Bill Shea, Gordon King
"For a drainage channel built in San Juan, Puerto Rico, a value engineering (VE) proposal incorporating a secant pile top-down approach saved time and facilitated construction work on the larger flood
Jan 1, 2012
-
Deep Mixing Field Trials for Land Remediation: Some 3-Year Results from the SMiRT ProjectBy Ziyad Abunada, David O’Connor, Fei Jin, Abir Al-Tabbaa
"In-situ remediation of contaminated land with deep mixing can enable a multi-technique remedial strategy on the same site combining low permeability barriers, permeable reactive barriers, stabilisati
Jan 1, 2015