Analysis of Panel and Pile Verticality and Overlap in a Project Information Management SystemBy Jamey Rosen, Georgette Hlepas
Verticality data collected from panel and pile elements of seepage barrier walls describe the shape and position of those elements in three dimensions. These data are used to determine if a barrier wa
Sep 8, 2021
-
Geospatial Project Information Management System At Herbert Hoover DikeBy Jamey Rosen
A Project Information Management System (PIMS) was developed to manage and analyze QC data at the Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall (owned by the Jacksonville District of
-
Development of Environmental Double Pile (EDP) for Improvement of Contaminated Soft GroundBy Hyunsuk Yoon, Kiho Lee, Juhyng Lee, Younghoon Jung, Junboum Park
"The environmental double pile method is presented as a device to improve the engineering properties and to clean up contamination of low-permeability soil. This method is one of the novel technologie
Jan 1, 2005
-
2017 OPA WINNER - Tri-Pod Suction Buckets for Offshore Wind Turbine FoundationBy Tae Hwan Lee, Jun-Shin Lee, Daejin Kwag, Sangchul Bang, Gerard T. Houlahan, Moo Sung Ryu
"Geotechnical engineers have been installing innovative, permanent underwater foundation systems utilizing suction buckets for the offshore industry since the early 1980s (Senpere and Auvergne, 1982).
Jan 1, 2017
-
LRFD For Deep Foundations: Replacing The Traditional Factor Of Safety In DesignBy Lance A. Roberts
The Federal Highway Administration (FHWA) has mandated the use of the AASHTO Load and Resistance Factor Design (LRFD) specifications for all new federally-funded transportation infrastructure projects
Jan 1, 2008
-
Effect of Axial Compression on Lateral Pile Response: Laterally Loaded Test Pile ComparisonBy David S. Graham, Joseph D. Bailey, Paul J. Axtell, Michael K. Muchard
"Two instrumented test piles were simultaneously subjected to a static lateral load test by jacking the piles apart. One of the piles was loaded in axial compression via kentledge during the lateral l
Jan 1, 2017
-
An Investigation Of Pile Foundations Installed During The Late 19th And Early 20th Century For Re-Use In Building SupportBy Scott M. Doehla
A proposed rehabilitation of a 200,000 sf, 75-foot high steel-frame building at the former U.S. Navy Yard in Brooklyn, New York required the review of existing foundation data and an investigation of
Jan 1, 2008
-
Analysis and Behavior of Double Sheet Pile CofferdamBy Kamil Nuzha, Jianchao Li, Bashar S. Qubain
"The Philadelphia Water Department is rehabilitating Belmont Raw Water Basin. As part of this work, a 500-ft long, temporary cofferdam was designed to retain 35 ft of combined water and soil at the we
Jan 1, 2016
-
A New Low-Cost Bi-Directional Load Test Technique for Drilled ShaftsBy Sherif Elfass, Gary Norris
Bi-directional load testing of drilled shafts has been widely adopted as a means to evaluate their load carrying capacity. However, in order to reach failure, most of these tests are carried out on s
Sep 8, 2021
-
Vertical Load Test on a Drilled Shaft Installed in Glacially Derived SedimentsBy Robert C. Simpson, Ghada S. Ellithy
"There are several methods for estimating the axial capacity of drilled shafts installed in coarse-grained soils. Most methods estimate the ultimate capacity for side friction and tip resistance. Desi
Jan 1, 2015
-
Session 7: Grouting Compaction Grouting For Sinkhole Repair at WAC Bennett DamBy James Warner
Investigations of the sinkhole indicated that the loose, disturbed ground was completely encircled by dense competent core. This confinement substantially increased the effectiveness of the compaction
Feb 10, 2003
-
Using Large Pile Driving Hammers For The Foundation Of Bridges And WindparksBy Bernhard Bruggaier
Outside the oil and gas industry there is an increasing demand to install big piles for the foundation of ports, bridges, and wind-energy plants. This article introduces the design and techniques in u
Jan 1, 2002
-
Unconventional Solutions For Construction Of A Hybrid Cut-Off Wall At The Dead SeaBy Karsten Beekhaus, Sander W. Odijk, Rabea Bahlum, Mazin Adnan, Ayman Abdelh Al Nuaimat, Hassan Farhat
The Arab Potash Company, APC, is one of the 10 largest potash producers of the world. The solar ponds at the Dead Sea, used for the enrichment of the salt content in the brine, are of crucial importan
May 1, 2022
-
The Choice between HSDT and RLT: Selection Criteria for Concrete Pile TestingBy P. Middendorp, Gerald E. H. Verbeek
"INTRODUCTIONStatic Load Testing (SLT) is generally considered the pile testing method that provides the de-facto answers regarding pile capacity and load-deflection behavior. However, as this testing
Jan 1, 2006
-
Analysis And Design Of A Piled Foundation For A Tall Tower ? SynopsisBy I. K. Ozaydin
Analysis of piles groups loaded with large bending moments and both vertical and batter piles can be best performed by matrix analysis. In this paper, a case history about a tall marine control tower
Jan 1, 2010
-
Design And Construction Of The Deepest Cfa Pile In AustraliaBy W. L. Chong
For a project located in Docklands Victoria, a high-rise development was proposed where the geology comprised soils of various compositions and consistencies to approximately 50m deep before being und
Nov 1, 2022
-
Performance-Based Reliability Design For Deep Foundations Using Monte Carlo Statistical MethodsBy Haijian Fan
Currently, deep foundation designs for the service limit state are deterministic in nature. The settlements and lateral deflections of deep foundations are calculated by means of numerical techniques
-
Owing to an Increasing Demand to Manage Risk and Maximize Cost-Effectiveness, Preference for Reliability-Based Design (RBD) Over Traditional Deterministic Design Procedures has increased for Deep Foundation ElementsBy Armin W. Stuedlein, Seth C. Reddy
In this study, factors affecting the reliability of augered cast-in-place (ACIP) piles under axial compression at the serviceability limit state are addressed using a simple probabilistic hyperbolic m
Jan 1, 2013
-
2023 OPA Winner: Climate Pledge ArenaBy Meeok Kim, Thornton Tomasetti, Seth Knihtila, Michael Oakland, Shawn Leary
The transformation of Seattle's historic KeyArena into the state-of-the-art Climate Pledge Arena, home to the NHL's Seattle Kraken, was no small feat. The $930-million renovation and expansion require
Sep 1, 2023
-
Double Rotary Head Piling Systems (Cased CFA)By Franz-Werner Gerressen
In the changing construction environment clients are searching for new technology to complete their projects in shorter times. Manufacturers are therefore developing solutions to speed up established
Jan 1, 2009