Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Project Evaluation-a key step to implementation

    By D. M. Slavich

    "In today's operating and investment climate, project evaluation is both more important and more difficult. It is more important because economic and financial analyses of a proposed project prov

    Jan 1, 1982

  • CIM
    866 - Problems of Large Relief or Weathered Shear Joints in Granites and Basalts in Brazilian Dam Foundations

    By G. R. Sadowski

    "Large subhorizontal joints have been found in the foundation excavations in basalt and granite of Brazilian Dams. Some spread for hundreds of square meters showed slickensides—polished surfaces plus

    Jan 1, 2015

  • CIM
    An analytical approach to the design of coal pillars

    By K. Barron

    "A computer program is described which will analyze the stability of coal pillars. The extent of the peripheral failed zone and the central elastic core of the pillar, the stress distribution across t

    Jan 1, 1984

  • CIM
    Combined PID and Predictive Control of Sag Mill Feed Size Distribution

    By Claude Bazin, François Robichaud

    The control of the operation of a semi autogenous grinding mill is mainly based on power and bearing pressure measurements. Image based sensors can provide on-line measurements of the size distributio

    Jan 1, 2014

  • CIM
    Evaluation of Fibre Optic Temperature Sensor Data for the Prediction of Tapblock Condition

    By T. Gerritsen, R. MacRosty, R. Pula

    For several years Hatch has been installing fibre optic temperature sensors on the copper cooling elements of smelting furnaces to improve monitoring capabilities in critical locations. The metal/matt

    Jan 1, 2014

  • CIM
    Throwing the Switch - The Planning, Process and Challenges of a Ventilation System Changeover

    By Arsalan Talebzadeh

    Construction -Surface ?First two intake fans constructed in 2007; third fan added in 2008 to reduce resistance in the system. 450 HP fans. ?Excavation for exhaust fans started in 2008. ?In parallel

    Oct 1, 2010

  • CIM
    Assessment of slope deformation and deep seated instability in the Cassiar open pit

    By Eugene F. Mehr, Dennis C. Martin

    "Development of the final slope for the 340 m (1200 ft) high hanging wall at Cassiar Mine precipitated an area of deep seated instability involving an estimated 17.6 million tonnes. The deformation me

    Jan 1, 1993

  • CIM
    Availability of Bank Debt Financing to the Mining Sector

    ?Bank Lending to the Mining Sector affected by 2 broad factors since Mid 2008: 1. Economic Downturn (?the Real Economy?) for mining companies directly reflected in lower metal prices (current and for

    May 1, 2009

  • CIM
    Radiation in uranium mines (8162e9af-c0cf-4d69-a23c-fd1c5d78fc0e)

    By R. W. Thompkins

    "PREFACEPart 1 of this paper, published in the September issue, covered the occurrence of uranium, radiation from uranium ores, the uranium series, radioactive theory, radioactive equilibrium and appl

    Jan 1, 1982

  • CIM
    Retrofit to Agrium’s Special Standard Surge Bin Improves Reliability, Safety, & Life Cycle Cost

    By T. Holmes, S. Davison

    "The Special Standard Surge bin at Agrium’s Vanscoy Potash Operations (VPO) has been plagued with flow problems and wear, and corrosion issues for it’s entire working life. Investigation showed that t

    Jan 1, 2016

  • CIM
    Estimation and Reporting of Mineral Resources for Coarse Gold-bearing Veins

    By Simon C. Dominy, Ian M. Platten, Garry F. Johansen, Alwyn E. Annels, Brian W. Cuffley

    Abstract - Coarse gold-bearing veins are characterized by high grades that are localized and erratic. Effective sampling of coarse gold-bearing veins is difficult because of the low concentration and

    Jan 1, 2000

  • CIM
    Time domain spectral IP results from three gold deposits in northern Saskatchewan

    By Steve McMullan, Blaine Webster, Ian Johnson, Ron Matthews

    "Time domain spectral Induced Polarization (IP) data from the Tower, Jojay and Laurel Lake gold deposits in northern Saskatchewan are presented. The resistivity data shows both resistivity lows (due t

    Jan 1, 1989

  • CIM
    Extraction of radium from uranium tailings

    By Desmond M. Levins, Reginald K. Ryan

    "Removal of radium from uranium tailings would substantially lessen their environmental impact because it would eliminate, or greatly reduce, the hazards arising from radon emanation, leaching of radi

    Jan 1, 1980

  • CIM
    Thunder Bay Terminals Ltd. - Terminal Plant Design

    By J. Carr

    This paper discusses: (1) the need for Western Canadian coal in eastern Ontario Hydro plants; (2) design parameters-unit trains, year- 'round receiving from trains, and shipping (Great Lakes seas

    Jan 1, 1979

  • CIM
    110 Portrait de l?industrie du fer au Québec

    By Denis Blackburn

    La Direction générale du développement de l?Industrie minérale (DGDIM) du ministère des Ressources naturelles et de la Faune (MRNF) du Québec tient un inventaire de toute l?activité minière sur le ter

    May 1, 2011

  • CIM
    CSR: Evolution To Survive In A Developing World

    By Mark B. Thorpe

    Golden Star Resources started gold mining operations in Africa in 1999 after 15 years of exploration in South America. At the time, the approach to local assistance was through "alternative livelihood

    May 1, 2011

  • CIM
    Estimating Rock Mass Properties and Seismic Response Using Higher Order, Discontinuous, Finite Element Models

    By D. A. Beck

    The load-deformation response of discontinuous rock under static and dynamic loading conditions has been simulated using Explicit Finite Element models. The intent of the analysis was to investigate t

    May 1, 2009

  • CIM
    The Kitsault Project

    By C. A. Born

    This paper describes the rejuvenation of a molybdenum mine mill complex at the head of Alice Arm, 500 miles north of Vancouver and 85 miles north of Prince Rupert, British Columbia. It includes a desc

    Jan 1, 1979

  • CIM
    Fraser Mine Material Handling System

    Weekly Capacity ? Current Schedule Rate (198.5 tonnes / hour) X Skip Time (112.7 hours) X Effectiveness (85%) = Weekly Capacity (19,015 tonnes) Capacity Conclusions - Existing hoists optimized are

    Feb 1, 2008

  • CIM
    Western Canadian marine placer potential

    By J. Vaughn Barrie

    Placer mineral deposits may exist in the nearshore and shelf regions off western Canada. These deposits could contain gold, ilmenite or zircon as well as sand and gravel aggregate. Two deposit types t

    Jan 1, 1994