Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Surface Water Supply in the Western Australian Goldfields ù Fact or Fiction?

    By T Hodgkin

    The WA Goldfields is a highly productive gold and nickel mining area, but is arid with highly saline groundwater. Groundwater is widely used to supply process water to mines in the region but high gro

    Jan 1, 2003

  • AUSIMM
    Development of Drilling and Blasting Practices at The Vickery Coal Mine

    By Conley R, Payne I

    The Vickery Coal Mine commenced open cut mining operations in May 1991. All overburden and interburden is drilled and blasted for excavation by dragline or hydraulic excavator. The mode of operation a

    Jan 1, 1992

  • AUSIMM
    The Channel Tunnel England to France: A Progress Report

    After a very brief historical survey and overall assessment of traffic requirements, the invitation by the British and French Governments for private groups to make proposals for a "fixed link" is

    Jan 1, 1987

  • AUSIMM
    Development of Innovative Goaf Inertisation Practices to Improve Coal Mine Safety

    By R Balusu, P Humphries

    In combination with detailed field studies and goaf gas characterisation, computational fluid dynamics (CFD) models have been used to develop optimum and effective strategies for inertisation during l

    Jan 1, 2005

  • AUSIMM
    Continuous Assaying in a Copper/Lead/Zinc Mineral Flotation Pilot Plant Using In-Stream Analysis Instrumentation

    By Lovett EP, Johnson CR, Dunlop GA

    Seven streams of a low tonnage pilot plant operation on Cu/Pb/Zn ore from the Golden Grove Project were continuously assayed using an AMDEL In-Stream Analysis (ISA) system. The ISA instrumentation

    Jan 1, 1986

  • AUSIMM
    Iron Ore Sintering Research at Different Scales

    By J Khosa, J Manuel

    Iron ore sintering is very complex with many interdependent variables. For the same ores, the sinter quality and sintering performance may vary significantly with the scale at which the sintering test

    Jan 1, 2007

  • AUSIMM
    Investigation of Gas-Dynamics of the Blast Furnace Process

    Results are presented of the investigation of gas dynamics of the blast furnace process obtained on laboratory models and operating furnaces. Gas residence times were measured using a helium tracer t

    Jan 1, 1975

  • AUSIMM
    The Epithermal Au and Porphyry Cu (Au) Relationship in the Western Pacific and Central Europe (bacb76a9-dfc4-4704-8efd-2cd91a14adbe)

    By Carlie JC

    Many low sulphidation epizonal gold and zinc-lead vein deposits within magmatic arcs are situated on basement highs, and post-date both the main volcanic episode and porphyry copper (gold) mineraliza

    Jan 1, 1995

  • AUSIMM
    The Use of Electronic Firing Techniques at Olympic Dam Operations

    By M Roper, M Lovitt

    WMC Resources Olympic Dam Operation located in South Australia, is a poly metallic underground sublevel open stoping (SLOS) mining operation with a current annual production rate in excess of 9.0 Mt.

    Jan 1, 2004

  • AUSIMM
    Twin Stacked Tunnels - KDB200, Kowloon Southern Link, Hong Kong

    By I P. W Chau

    Construction of twin stacked railway tunnels through mixed ground conditions in the heavily populated urban environment of Hong Kong, including tunnelling in poor ground conditions, with low cover and

    Jan 1, 2008

  • AUSIMM
    Plastics and Metals: Partners in Industry

    Naturally occurring organic plastics have been in use for over 2,000 years. Plastics based on chemically modified organic polymers date back only about 100 years, and those based on synthetic polymers

    Jan 1, 1962

  • AUSIMM
    Application of Synthetic Rainfall Data to Long-term Modelling of a Rehabilitated Landform

    By G R. Hancock, D Verdon-Kidd, M J. Saynor, J B. C Lowry, T J. Coulthard

    The ability to simulate the stability of post-mining landscapes over time scales ranging from decades to millennia is a critical element in the assessment of closure designs for uranium mines. Landsca

    Jun 28, 2016

  • AUSIMM
    Comparative Cost of Rock Drilling Underground

    DURING a period extending over about the last two and a half years, the performances of various types of rock drills in use at the mining department of the Zinc Corporation have been recorded as close

    Jan 1, 1923

  • AUSIMM
    Small Particle Eddy Current Separation

    During conventional eddy current separation, a repulsive force is applied to metallic particles by placing them in a rapidly changing magnetic field generated by a spinning magnetic rotor carrying an

    Jan 1, 2000

  • AUSIMM
    The Reduction of PbO-Silicate Melts Using CO

    By Hayes P. C

    The kinetics of reduction of PbO-silicate melts in CO-N gas mixtures at 900¦C have been studied. Rea~tion rates were measured by moni- toring the CO2 content of the product gas. A wide range of gas

    Jan 1, 1987

  • AUSIMM
    Design and Commissioning of the Sepon Copper Pressure Oxidation Circuit

    By A G. Pavlides, B L. Weekes

    The Sepon Copper Project is located in the Savannakhet Province of Laos PDR and is operated by Lane Xang Minerals Ltd (LXML). An Ausenco - Bateman Engineering joint venture, the Khanong Development Gr

    Jan 1, 2005

  • AUSIMM
    Study of Wave Formation in a High Strength Bottom Injected Metallurgical Vessel

    By R H. Eric

    Surface wave formation induced by a high-strength submerged jet in a bottom blown metallurgical vessels has been studied experimentally by using one-seventh water model of CLU (Creusot-Loire Uddeholm)

    Jan 1, 2000

  • AUSIMM
    Use of Carbon-in-Pulp Process in Russia

    By Rashchenko AF, Voiloshnikov GI, Elshin VV, Khomutov VV

    The sorption method for the precious metals recovery fromsolutions and pulps are a perspective trend of modernhydrometallurgy. Russian gold mining industry uses thesemethods, anion-exchange resins bei

    Jan 1, 1993

  • AUSIMM
    Environmental Performance of Oxidative Pre-treatments in the Extraction of Gold

    By F A. Roddick, C Swaminathan

    As remaining gold deposits tend to become more refractory, some form of oxidative pre-treatment involving hydro or pyrometallurgy is necessary to maintain high metal recoveries. These pre-treatments i

    Jan 1, 2000

  • AUSIMM
    Production Scheduling Optimisation in a Nickel Laterite Deposit:MIP and LP Applications and Infeasibility in the Presence of Orebody Variability

    By R Dimitrakopoulos

    Optimisation and mathematical formulations for open pit design and long-term production scheduling have been available since the 1960s. There are two main concerns in the application of existing mixed

    Jan 1, 2003