Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of Vertical Centrifugal Screen (V3 Separator) in Two-stage, Closed-Circuit Crushing System (CPC Process)

    In sizing of wet coal by the horizontal vibrating screen, screen openings to be used is much restricted, because coal is sticky and its bulk density is little. The electrically heated screen and o

    Jan 1, 1984

  • AUSIMM
    Effects Of Induration Conditions On The Structures And Properties OF iron-Ore Pellets

    By Bowling K. McG, Hamilton J. D G

    The influence of three important para- meters which affect the induration of iron-ore pellets, viz temperature, time, and lime content, have been assessed in terms of internal pellet structure and

    Jan 1, 1974

  • AUSIMM
    Suspension Roasting of Pyrite and Copper Concentrate

    By Soma T

    Pyrite and Cu-concentrate were roasted in vertically suspended state in an externally heated tube. Tubes of three different lengths of reaction zone were used for three different reaction times. R

    Jan 1, 1980

  • AUSIMM
    Relationship of Joint Orientation with Hole Spacing Parameter in Multihole Blasting

    By Badal R

    Rock Discontinuities ("joints") affect blasting results. An investigation was carried out to understand if blast parameter such as spacing needs to be altered with the change in joint direction. Sma

    Jan 1, 1990

  • AUSIMM
    The Effect of Concentrate Composition on the Smelting and Refining of Nickel

    The basic flowsheet for the Kalgoorlie Nickel Smelter and Kwinana Nickel Refinery are discussed in relation to the mineral components of Kambalda produced nickel concentrates. Both processes handl

    Jan 1, 1973

  • AUSIMM
    Inverstigations of Material Distribution and Permeability-Improvement of the Permeability of No. 7 Blast Furnace

    By Flierman GA, Van Toor CH

    Investigations were carried out of burden distribution using a full scale model of the furnace top. Various charging sequences were used and large differences were found between ore charged as sinter

    Jan 1, 1975

  • AUSIMM
    Stable Isotopes and the Environment

    Whereas traditionally, stable isotope research has been directed towards resource exploration and development, it is finding more frequentapplications in helping to assess the impacts of resource util

    Jan 1, 1990

  • AUSIMM
    OMEN - An Approach to the Optimisation of Methane Drainage Systems

    By Schofield D, Denby B, Stout F, Moli A

    This paper documents the development of a user-friendly computational program, which has been constructed to assist the mine ventilation engineer in the optimal design and operation of methane drain

    Jan 1, 1995

  • AUSIMM
    Reopening the Golden Mile

    By Cleghorn JH

    Underground mining operations on Kalgoorlie's Golden Mile were suspended in 1976, suffering the combined effects of low gold prices and grades. A subsequent substantial increase in the gold price

    Jan 1, 1984

  • AUSIMM
    Morwell Open Cut: Mine Scheduling

    By Brimblecombe P

    Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations repres

    Jan 1, 1989

  • AUSIMM
    The Effect of Manganese Dioxide and Sodium Sulphite on Thiourea Leaching of a Gold Ore

    By Woodcock J. T, Millett R. N

    It was shown that manganese dioxide could be used as an oxidant in acid thiourea leaching of a gold ore. Manganese dioxide could generate high redox potentials and was as effective as hydrogen per

    Jan 1, 1987

  • AUSIMM
    Roof Falls in Australian Longwalls

    By Savidis GM

    This report outlines the experience of Australian mining operators in dealing with large falls of roof in advance of longwall supports. Previous and present techniques used for face stabilisation

    Jan 1, 1986

  • AUSIMM
    Conveyor Idler Performance and Tapered Roller Bearings

    This paper discusses the use of tapered roller bearings in conveyor idlers. It shows that in medium and high capacity systems, tapered roller bearings can offer significant cost and performance ad

    Jan 1, 1978

  • AUSIMM
    Vacuum Lift Systems for the Transport of Broken Rock in Shafts

    By Jones IO

    Although small units have been in use formany years, particularly in opal mining at shallow depths, there has been little effort in the past to explore the potential of the vacuum lift system in other

    Jan 1, 1984

  • AUSIMM
    Lead-zinc-silver Ore Concentration Practice at the Lead/Zinc Concentrator, Mount Isa Mines Limited, Mount Isa, Queensland

    The LeadtZinc Concentrator at Mount lsa treats all the lead-zinc-silver ore from the Mount Isa Mine and some of the ore from the Hilton Mine. This concentrator was commissioned in June 1966 and total

    Jan 1, 1993

  • AUSIMM
    Childe Harold: A Case Study in the Use of Multiple Bench Grade Control Techniques

    By Stuart M. S, Allen P. B

    The Childe Harold deposit was mined by the Granny Smith Joint Venture (GSJV) from late-March through to early-December 1993. This was a fast-tracked mining project whose history began with an offer

    Jan 1, 1994

  • AUSIMM
    Coal - Paper No. 9 Electrode Carbon From Victorian Brown Coal

    By Hermann J. A

    Over the last few years enormous dapooits of high-grade bauxite have been discovered in Australia, ;_ d an alum .nium smelting industry based on them is rapidly being developed,, This industry requ

    Jan 1, 1969

  • AUSIMM
    Geological Mapping of Alteration in Outcrop at Mt. Leyshon, N.E. Queensland, Using X-Ray Diffractometry

    Answers to the questions "which rocks contain diamonds?" and "which indicator minerals should diamond explorers look for?" are no longer so easily obtained, now that diamonds are known to occur in

    Jan 1, 1989

  • AUSIMM
    Filling Operations at Mount Isa

    By Hunter GW

    This paper gives an account of the filling system at Mount Isa from surface fill production to stope discharge underground. A brief explanation of the surface facility and reticulation is given pr

    Jan 1, 1982

  • AUSIMM
    Experience With Production in a Gassy Environment, Oaky North Mine

    Problems associated with gas management become more significant as exploitation of coal reserves in the Bowen Basin in Australia becomes deeper. At Oaky North mine, relocation of production from one a

    Jan 1, 2005