Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Cut and Cover Tunnelling on the Melbourne Underground Rail Loop Project

    By Johns A. L

    The concept of the Melbourne Underground Rail Loop and the organ- isation to achieve its construction are covered in the companion papers (Reference 1, 2) and will not be repeated here. The Victor

    Jan 1, 1981

  • AUSIMM
    Sand Mining Restoration on the Swan Coastal Plain using Topsoil – Learning from Monitoring of Previous Rehabilitation Attempts

    By E J. B van Etten

    This paper reports on the results of several years of monitoring rehabilitation at a silica sand mine on the Swan Coastal Plain, south of Perth. Mining here occurs below the regional watertable and le

    Oct 5, 2011

  • AUSIMM
    Grinding Circuit Control and Product Size Inference using the In-Circuit Cyclone

    The control objectives and constraints for grinding circuits are ana- lysed, taking a single-stage ballmill-cyclone circuit as an example. The design of a hierarchical modular control system is descr

    Jan 1, 1988

  • AUSIMM
    A Study into Bonding within Reduced Titanomagnetite-Coal Compacts

    By R J. Longbottom

    In this study the bonding within reduced titanomagnetite-coal compacts was investigated. The aim of the study was to better understand the binding mechanisms in the reduced compacts and, based on this

    Jul 11, 2011

  • AUSIMM
    Now, this is the Time for Mining Companies to Choose - Real Option Valuation or Discount Cash Flow

    By S Shafiee, N Abbate

    The evaluation of mining projects requires a methodology that will give flexibility and manage the existing uncertainty within the projects. The discount cash flow (DCF) and other traditional evaluati

    May 24, 2012

  • AUSIMM
    Generating Synthetic Data for Simulation Modelling in Iron Ore

    By J E. Everett, K Jupp, T J. Howard

    Simulation modelling is a practice commonly used in the mining industry to evaluate alternative process designs. Such modelling is typically undertaken as an optimisation study to increase the efficie

    Sep 29, 2013

  • AUSIMM
    Northparkes Mines’ Current Air Blast Risk Assessment Practices for Block Caving Operations

    By C Vejrazka

    Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant that produces hig

    May 9, 2016

  • AUSIMM
    Embracing Modern Ecological Methods - Monitoring and Modelling for Mine Closure, not Compliance

    By A M. Lechner, S Arnold, M J. Gillespie, P D. Erskine, D R. Mulligan, A T. Fletcher, A Gordon

    Mine ecological monitoring schemes are often conducted only to address compliance and in some cases do not have the sufficient statistical power or understanding of ecological systems to assess, quant

    Jul 10, 2012

  • AUSIMM
    Cable Tunnel Ventilation

    By P Ridley

    EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil

    Mar 8, 2011

  • AUSIMM
    The Physical Chemistry of Carbothermic Reduction of Sulphide Minerals: 'A Novel Metal Production Route'

    By Grieveson P, Terry B. S

    Carbothermic reduction of sulphide minerals for achieving a selective separation of metallic species from complex minerals has been discussed by considering the prevailing oxygen potential during th

    Jan 1, 1992

  • AUSIMM
    Cyclic and Post-cyclic Behaviour of Four Australian Tailings

    By R Fanni, D Reid, M Kulessa

    Recent updates to Australian industry guidelines emphasise the importance of the assessment of liquefaction potential of tailings. This includes assessment of the cyclic liquefaction potential, and th

    Jul 27, 2015

  • AUSIMM
    Admixture use in cemented rock fill

    By B Roache, J O’Brien, M Gray

    Admixture use in cement products is commonplace in the construction and mining industries. Many Australian mines have an operational concrete batch plant and stock hydration control and water reducing

    Nov 29, 2022

  • AUSIMM
    Impact of Blast Fragmentation on Hydraulic Excavator Dig Time

    By D Thornton, R Hodson, D Sprott

    Blast fragmentation size distribution and thus blast design have been found to have a direct impact on the load and haul cycle through excavator dig time and bucket payload. Previous studies have demo

    Jan 1, 2003

  • AUSIMM
    Rapid Three-Dimensional Modelling of Mine Geology - Structural Applications to the Globe-Progress Mine, West Coast, New Zealand

    By C McIntosh, M van Dam, N Whetter, R Lane, M McCulloch

    Mine geology is understood through synthesising large amounts of structural, lithological, geochemical and geophysical data derived from the original topographic surface, drilling and surfaces exposed

    Jan 1, 2009

  • AUSIMM
    The Development of a Fan Range to Meet Increasingly Demanding Safety Criteria Inside Tunnels

    By A G. Sheard

    Fire safety requirements inside tunnels have become more demanding as tunnel designers consider the impact of potentially larger fires. Tunnel ventilation equipment is required to clear hot gases in t

    Mar 8, 2011

  • AUSIMM
    Building a Geometallurgical Model for Early-Stage Project Development – A Case Study from the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru

    By R Baumgartner

    The Canahuire deposit is a recently discovered Au-Cu-Ag epithermal deposit in Southern Peru. A geometallurgy program is a key study element of the project Feasibility study. Metallurgical, mineralogic

    Sep 5, 2011

  • AUSIMM
    High-Density Sludge Process for Treating Metal Bearing Acid and Metalliferous Drainage Wastewaters

    By A Dal-Corobbo

    Traditional acid and metalliferous drainage (AMD) wastewater treatment focuses on the iron co-precipitation/adsorption process as this is a very effective method of reducing heavy metals, including co

    Nov 26, 2013

  • AUSIMM
    Strategies for Mine Planning and Design

    By S Coward, C Xu, P A. Dowd

    "This paper provides an assessment of the current challenges in strategic mine planning and design and suggested approaches for addressing them. The specific challenges covered are: realistic quantif

    Nov 24, 2014

  • AUSIMM
    Mitigation of Post-blast Fume in Soft Ground and Wet Conditions

    By S S. Kanchibotla, E J. Sellers, L Julian, A Musunuri

    Fume events in coalmines are typically associated with wet conditions, soft ground and deep holes. An ACARP research project used laboratory and field testing combined with literature reviews, numeric

    Aug 24, 2015

  • AUSIMM
    A Historical Perspective of the Application and Success of Geometallurgical Methodologies

    By S R. Williams

    There is a sense of geometallurgy being new; a new methodology for mining project development and improved operational strategy. One of the main challenges that any ænewÆ technology faces is a validat

    Sep 29, 2013