Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Eglinton Crosstown - Over and Under the Existing Subway

    By Shawna Munn, Sarah Speir

    Cedarvale Station is one of 25 new Eglinton Crosstown light rail transit (ECLRT) stations along Eglinton Avenue in Toronto. It is an interchange station with the existing Toronto Transit Com- mission

    Jan 1, 2023

  • DFI
    Levee Repair and Upgrade by Dual Sheet Pile Walls and Accordion Sheet Pile Wall

    By Takefumi Takuma, Ali Fayad, Shigeru Kambe

    "This paper discusses the unique design and construction circumstances of the cantilevered dual sheet pile walls and the Accordion Sheet Pile Wall for the repair and upgrade of the East Garden Grove-W

    Jan 1, 2017

  • DFI
    Data Management Guide Specification

    By Laurel E. Blackman

    The DFI Project Information Management Systems (PIMS) Committee cooperated with the US Army Corps of Engineers (USACE) to develop a specification for PIMS used on USACE projects. Once completed the Co

    Jan 1, 2021

  • DFI
    Dewatering Tests for Underground Stations in Rome

    By Antonio Zechini, Giuseppe Iorio, Massimo Grisolia

    "The new C Line of the Rome Metro runs northwest to southeast across the city center, with 30 new stations and a total length of more than 15.5 mi (25 km). Due to the presence of a dense urban environ

    Jan 1, 2017

  • DFI
    Drawdown of Ground Water Control System in Deep Excavation Surrounded by Cutoff Walls: Numerical Investigation

    By Dalia. R. Mohamed, Hisham H. Hafez, Marawan M. Shahien

    "Construction activities in major projects that involve deep excavations necessitate the use of vertical walls surrounding the construction site to play an important role as earth retention system. Th

    Jan 1, 2016

  • DFI
    Session I - How Geology Has Driven Foundation Practice Worldwide - Design And Construction Constraints Imposed By Unique Geologic Conditions In New York City ? Synopsis

    By George J. Tamaro

    The design and construction of foundations in the New York City area are usually dictated by the widely varying geologic conditions encountered in the five boroughs, particularly along the spine of Ma

    Jan 1, 2000

  • DFI
    Caisson Foundations For Mississippi River Bridges In The New Orleans Area (2e66a216-6dc8-4479-804e-25f5836f407e)

    By William B. Conway

    This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du

    May 11, 2007

  • DFI
    Design and Construction of Mixed Ground Working Platform for a CCR Surface Impoundment

    By Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste

    An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D

    Jan 1, 2019

  • DFI
    Quality Control of Pile Installation Using Digital Pile Penetration and Rebound Monitoring System

    By Hee-suk Yun, Dae-jin Hwang, Jeong-woo Seok, Myoung-mo Kim

    "In this paper, the accuracy of the data measured by a newly developed displacement measuring system, DPRMs (Digital Pile Penetration and Rebound Monitoring system) and its applicability as a quality

    Jan 1, 2005

  • DFI
    Full-Scale O-Cell Load Test for a Rotator Drilled Rock Socket at the Main Span of the New Benicia-Martinez Bridge

    By Ronnie X. Gu, Xing Zheng, Gem-Yeu Ma

    Due to implementation of the rotator construction method from which a smooth shaft was anticipated, a full-scale pile load test (Osterberg Method) was performed at Pier 14 Pile 9 of the main span of t

    Jan 1, 2005

  • DFI
    St. Louis Service Base Floating Wharf Mooring System Replacement

    By A. Bozorgzadeh, B. M. Jensen, B. N. Koelling, B. R. Murtaugh

    "The Service Base mooring system originally consisted of two general types of structures, 19 timber piles cabled together and steel three-legged pipe piles. The St. Louis District fleet moored to the

    Jan 1, 2017

  • DFI
    Overview of Construction and Design of Auger Cast-in-Place and Drilled Displacement Piles

    By Monica Prezzi

    "Auger cast-in-place (ACIP} piles and drilled displacement piles are being increasingly used as foundation elements for structures, particularly in projects requiring accelerated construction or invol

    Jan 1, 2005

  • DFI
    Extra Deep Cut-Off at 250 m Depth - A Case Study

    By Federico Pagliacci

    "Many existing dams are subject to underwater seepage due to subsoil conditions, like deep alluvial deposits or pervious rocks or karst. Remedial works are necessary in order to install new cut-off wa

    Jan 1, 2017

  • DFI
    Very Deep Foundations in Rock: The New Challenge in the Foundation Industry.

    By Paolo Cavalcoli, Federico Pagliacci

    "As opposed to the static functional recovery of existing structures, the construction of infrastructures in an urban environment, when combined with complex geological situations, often involves buil

    Jan 1, 2015

  • DFI
    Analysis and Case Study for Minimizing Differential Settlements in Piled Raft Foundations

    By Yu Chuang, Zai Jinmin, Liu Songyu

    "The piled raft foundation is a geotechnical composite construction method, consisting of three elements, piles, raft and soils, which is applied for the foundation in an increasing number. Differenti

    Jan 1, 2005

  • DFI
    Lateral Capacity of Drilled Shafts Considering Push-Pull Resistance

    By Ke Yang

    "Drilled shafts are typically used to support structures subjected to large moments at the shaft head. The large moment can produce push and pull forces on the two sides of a drilled shaft. Consequent

    Jan 1, 2005

  • DFI
    Switching From Monetary Process Management To Critical Success Factors Using An Appropriate Process Information System

    By Jochen Maurer, Dr. Christian Hoyme, Dr. Hans Regler

    Currently, it is very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. As a rule, companies depend on reports from on-site e

  • DFI
    Rapid Load Testing In Germany

    By Marcel Bielefeld, Joost Bakker, Rob van Dorp

    Pile load testing can be performed by a static, rapid or high strain dynamic (generally designated as dynamic) testing method. The static load test is often considered the “gold standard” of testing w

    May 1, 2022

  • DFI
    Optimized Neural Network Model For The Prediction Of Driven Pile's Resistance

    By Hyun. I. Park

    Although numerous investigations have been performed over the years to predict the behavior and bearing capacity of piles, the mechanisms of these behavior and bearing capacity of piles have yet to be

    Jan 1, 2006

  • DFI
    A Case Study, Design Change from Spread Footing to Drilled Shafts

    By Drew M. Kurtz, Jeff L. Rai, Sara F. Frailey, Mohammad Ayub Iqbal

    "This paper presents the foundation changes made for a five-span bridge over the Lehigh River constructed as a design-build project. During excavation within the cofferdam at Pier 2 for the constructi

    Jan 1, 2016