Threading Piles Past Underground Assets In Central LondonBy Alexander Nikolic
The paper presents the foundation design and construction of a landmark urban redevelopment scheme in central London, UK. The scheme comprises the new Tottenham Court Road Underground station, Crossra
Jan 1, 2011
-
In Situ Soil Mixing Concepts Explained; Myths Dispelled - What Is Soil Mixing?By Richard W. Hanford
The geotechnical construction industry generally considers soil mixing to be defined as an in situ ground improvement or treatment method by which a dry or wet reagent is introduced into the ground an
Jan 1, 2001
-
Crane Boom Loadings From Pile DrivingBy Alan G. MacKinnon
Loads and stresses from pile driving are increasing from heavier piles and more powerful hammers. Stresses can be dangerous to equipment stability. Equipment developer MacKinnon tells how to compute s
Jan 1, 1986
-
Case Histories, Part 2 - Etudes De Cas, Partie 2 - Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract ManagementBy Mario Aiezza
This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto
Jan 1, 2002
-
Pile Top Hydraulic Hammer Drive Down The Hole Chiselling Round Steel Piling System - SummaryBy J. Nakayama
For installation of round steel piles or cast-in-place pile construction through boulder contained ground or rocky formation, usual system does not function properly or impossible to work. This paper
Jan 1, 1999
-
Nature And Functions Of A Geotechnical Consulting Firm ? SynopsisBy D. V. Roberts
Approximately 800 private consulting engineering firms in America specialize in geotechnical engineering. The gross income from these firms totals about $500 to $600 million per year. Sixty-five to se
Jan 1, 2010
-
Excavation Support At Historic Buildings In An Urban Environment - A Case StudyBy Tony Mazzo
It has often been said by consulting engineers that foundation contractors are in the business of taking risks. One would agree that the mere fact a foundation project can be budgeted, planned, engine
Jan 1, 2003
-
The Equilibrium Point Method Of Analysis For The Statnamic Loading Test With Supporting Case HistoriesBy R. G. Horvath
The Statnamic loading test is a new and innovative method for testing deep foundations. The test is relatively inexpensive, quick, easily mobilized, provides for direct measurement of applied load and
Jan 1, 1993
-
Data Normalization and User Interface Design for the Nevada Department of Transportation Deep Foundation Load Test DatabaseBy Austin Metz, Kevin Stanton, Ramin Motamed
"A recent study calibrated Load and Resistance Factor Design (LRFD) resistance factors for local soil conditions in the Las Vegas Valley. As a part of this calibration, an extensive database of drille
Jan 1, 2017
-
Deep Foundation Shoring in South FloridaBy Douglas C. Brunot
Mabey Inc. is providing for the shoring design for the Naples bay Center project, located in Naples, FL. The excavation is approximately 374' long by 164' wide and is 27'-8" deep at the shoring line w
Jan 1, 2018
-
Pin Piles For Seismic Rehabilitation Of BridgesSince the 1989 Loma Prieta Earthquake in the San Francisco Bay Area, the California Department of Transportation (CALTRANS) has accelerated seismic upgrading of their bridges. Many structures can be i
Jan 1, 1993
-
Thornton Road, Listerhills, BradfordBy B. C. Slocombe
A large derelict inner city site was regenerated for use as a distribution warehouse. Difficult topography and soils conditions required the adoption of a combination of specialist geotechnical proces
Jan 1, 1989
-
A Case History of Intrinsic Remediation of Reactive Tailings Seepage for Questa Mine, New MexicoBy SungJe Chi
Intrinsic remediation is the effect of natural attenuation mechanisms - dilution, dispersion, sorption/precipitation and biodegradation - reducing contaminant concentrations in ground water to specifi
Jan 1, 2017
-
Diaphragm Wall Construction In Hong KongBy Arturo Ressi di Cervia
The utilization of diaphragm wall construction in Hong Kong began in 1974 with the construction of the New World Center, the first diaphragm wall job built in the British Colony. That landmark job
Jan 1, 1993
-
Seal Slab / Steel Pile Interface Bond From Full-Scale TestingBy Gray Mullins
This paper presents results from model and full-scale tests to assess the interface bond between a cast-in-place concrete seal slab and steel H-piles in cofferdams. Three different seal slab placemen
Jan 1, 2013
-
Sand Compaction Piles ? SynopsisBy A. Holeyman
The displacement compaction piles described in the paper are installed using a heavy casing or tube and an internal drop hammer. The casing which initially is closed at the bottom by a sand plug displ
Jan 1, 2010
-
Seismic Considerations for Bridge FoundationsBy Lok M. Sharma
"Construction of a new bridge in a seismically sensitive area requires careful assessment of earthquake impact on the serviceability of the facility. Not only is the superstructure vulnerable, the fou
Jan 1, 2017
-
Underpinning Support Pipeline Compressor Station Founded On Timber Piles Potter, Ontario - DFI Conference, Toronto, Oct 1997 - Underpinning Support - Pipeline Compressor Station - BackgroundBy Brian Isherwood
TransCanada Pipelines, Calgary (TCPL) is one of North America's leading transporters of natural gas through its energy transmission business. TransCanada also operates significant complementary b
Jan 1, 1997
-
Optimal Subsurface Investigation Approach for Overhead Transmission StructuresBy Haijian Shi, Drew Pizzo
This article focuses on the appropriate application of subsurface investigation methods for transmission structures, which are typically designed to resist lateral rather than vertical loads. Currentl
Jan 1, 2018
-
Case Studies In Mission Bay, San Francisco: Deep Foundations In Challenging Soil ConditionsBy Lori A. Simpson
Mission Bay is a 300-acre reclaimed site in San Francisco, California, that is currently being redeveloped. Plans include new neighborhoods, parks, a new University of California, San Francisco, rese
Jan 1, 2006