Search Documents

  • SME
    SME Leadership Forum Addresses Shortage of Mining Professionals

    By Steve Kral

    In 2002, many in the mining industry — companies, academia and government — realized that the industry would soon be facing a serious shortfall in salaried and hourly employees. Depending on whose nu

    Jan 1, 2006

  • SAIMM
    First Cycle Experience Of A Business Process Re-Engineering Programme At Shabanie Mine

    By C. Musingwini

    In the past ten to fifteen years, many organizations have applied business process re-engineering (BPR) to significantly improve their business competitiveness or stave off closures. The mining indust

    Jan 1, 2005

  • NIOSH
    OFR-41(1)-82 Control Of Shale Roof Deterioration With Air Tempering - Volume I - Field And Laboratory Investigations

    By R. A. Cummings

    Certain roof shales in coal mines deteriorate upon exposure to the atmosphere, causing difficulties in the mining operations and adding to the cost. This report presents the results of both field inve

    Jan 1, 1981

  • AUSIMM
    Stripping of Fe (III) from D2EHPA Using Different Reagents

    Stripping of Fe (III) from D2EHPA Using Different Reagents The common way to extract Fe(III) from an organic solvent is by using concentrated acidic solutions. The stripping of Fe(III) from organic s

    Sep 13, 2010

  • NIOSH
    OFR-52-77 Alternate Conveyor Design For Mine Machinery

    By James H. Snyder

    This final report presents results of a program to develop a new conveyor system, adaptable to existing miners or loaders, which reduces the noise level to 90 dBA without reducing machine performance.

    Jan 1, 1976

  • SAIMM
    Mathematical Modelling Of Heat Transfer In Six-In-Line Electric Furnaces For Sulphide Smelting ? Synopsis

    An efficient and portable mathematical model has been developed for simulating heat transfer in six-in-line slag-resistance-heating electric furnaces for smelting sulphide ores to produce base metals

    Jan 1, 2011

  • SME
    Achieving World Class Maintenance Status

    By Paul D. Tomlingson

    World class performance is the ultimate objective of many maintenance organizations. It marks the organization as a leader in its industry and sets it apart as the ultimate achiever. But what is a “

    Jan 1, 2006

  • SAIMM
    Brittleness And Drillability

    By H. G. Denkhaus

    Comment on ?The evaluation of rock brittleness concept on rotary blast hole drills? in the Journal of SAIMM, vol 102. no. 1. pp. 61?66 Comment on ?Correlation of specific energy with rock brittlene

    Jan 1, 2003

  • SME
    Comparing EIA And ESHIA For Evaluating Mining Projects

    By R. E. Mitchell

    Environmental Impact Assessment (EIA) is the accepted method for evaluating proposed mining and other industrial projects to obtain regulatory approval and to help companies plan for responsible devel

    Jan 1, 2012

  • ISEE
    Crater Blasting Techniques and Designs in Compacted Soils

    By Patrick D. McLaughlin

    Crater blasting techniques have had relatively little application in the surface mining industry. This is not surprising, considering the geometry required to efficiently use cratering. The more widel

    Jan 1, 1992

  • NIOSH
    OFR-68-83 Preliminary Predictive Model Of Subsidence Process Over Room And Pillar Workings - Phase I: Definition Of Factors

    By S. K. Mathur

    This report identifies all the possible activities, variables and factors that contribute to the surface subsidence process over room and pillar workings. These factors are responsible for mine instab

    Jan 1, 1982

  • AUSIMM
    Determination of Traces of Tellurium in Rocks by Atomic Absorption Spectroscopy After Volatilization with Synthetic Pyrite

    This method determines tellurium at concentrations down to 0·01 p.p.m., with geochemical accuracy. Tellurium is volatilized from the rock at 800°C in the presence of sulphur from decomposing

    Jan 1, 1969

  • AUSIMM
    Hourly Ownership and Operating Cost Projection - Rubber Tyred Loaders

    Underground equipment owners and users in order to compete and succeed in being viable business propositions must continually balance costs with productivity. By reducing their hourly ownership, ope

    Jan 1, 1990

  • SME
    The As-Built Geotechnical Report: Its Use For Design Of Support For Three Rock Stations Washington, D.C. Metro

    By Carl G. Bock

    INTRODUCTION The Washington Metropolitan Area Transit Authority (WMATA) has let a contract for the excavation of three rock stations, spaced about 3550' (1082m) apart, beneath Connecticut Aven

    Jan 1, 1976

  • AUSIMM
    The Ignition Temperature of a Nickel Concentrate from Kambalda Under Simulated Flash Smelting Conditions

    Particles of a complex nickel sulphide concentrate (containing pyrite, pyrrhotite, pentIandite, and violarite as the major mineralogical constituents) were entrained in a stream of hot gas the tempera

    Jan 1, 1978

  • NIOSH
    OFR-89-80 Geologic And Engineering Data Acquisition For Underground Coal Mine Ground Control

    By David R. Alison

    This study was conducted using field interview methods to determine the data and information requirements of the underground coal mining industry for improving mine ground control procedures in existi

    Jan 1, 1980

  • SAIMM
    Contracting, Complexity And Control: An Overview Of The Changing Nature Of Subcontracting In The South African Mining Industry

    By B. Kenny

    The aim of this paper is to provide an overview of existing forms of subcontracting in the South African mining industry. A descriptive framework is developed to understand different subcontracting ar

    Jan 1, 1999

  • CIM
    Flotation of carbon values from blast furnace flue dust using statistical design

    By P. K. Naik, B. Das

    Flotation studies were carried out to recover carbon values from blast furnace flue dust containing ~30.34% carbon, 4.6% volatile matter (VM), and 65.03% ash. The variables chosen for the experiments

    Jan 1, 2005

  • DFI
    Problems Encountered For Deep Caissons For The Second Bassein Creek Bridge At Mumbai, India

    By Deepak B. Deshpande

    This paper enumerates various difficulties encountered in the design and construction of deep caisson foundations for the Second Bassein Creek Bridge constructed over a creek with very difficult site

    Jan 1, 2002

  • DFI
    The Settlements Of Buildings On Pile Foundations

    By Mait Mets

    In Estonia, the deformations monitoring of 1500 buildings are currently under investigation, buildings on pile foundations make up 10 per cent of these. In the following text we will be considering th

    Jan 1, 2002