Search Documents

  • TMS
    Remediation of Chicken Processing Wastewater using Electrochemically Produced Layered Double Hydroxides

    By Jewel A. G. Gomes

    Green rust (GR) are layered Fe(II)-Fe(III) double hydroxides, having a pyroaurite-type structure consisting of positively charged hydroxide layers and hydrated ions in interlayers. This special featur

    Jan 1, 2010

  • AUSIMM
    A Cyclone Furnace for Slag Fuming

    Laboratory scale equipment was developed to recover zinc as oxide fume from granulated lead blast furnace slag. The cyclone furnace process is characterised by high treatment rates combined with conti

    Jan 1, 1964

  • NIOSH
    The Mineral Industry Of Other West African Countries - Benin (e8cbf5f1-567f-42dd-9853-7bc37da6ef95)

    By George A. Morgan

    There was little change in the mineral industry of Benin in 1986, as the economy remained in the grip of a regional recession exacerbated by failing oil prices, which nullified much of the income from

    Jan 1, 1988

  • NIOSH
    IC 6578 Good rock-dusting and ventilation in two Alabama Coal Mines

    By F. E. Cash

    "Explosions in bituminous coal mines are preventable. The combination of adequate ventilation, thorough rock-dusting, and water on the cutter bars of mining machines and of empty and loaded cars will

    Mar 1, 1932

  • DFI
    Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing Results

    By Yogesh Prashar

    Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December

    Jan 1, 2002

  • SME
    Laboratory Baffled-Column Flotation Of Mixed Campbell/Eagle Seam Bituminous Coal – Preprint 97-121

    By S. K. Kawatra, K. J. Shoop, T. C. Rao, T. C. Eisele

    This study investigates the use of a horizontally- baffled column (7.6 cm inside diameter by 344.2 cm high) to reduce the ash content of a high ash bituminous coal. Tests were carried out to determine

    Feb 24, 1997

  • SME
    Pitfalls And Lessons Learned In Pump Station Construction

    By Steven R. Lowe

    Construction of a pump station, consisting of an inlet chamber, wet well and pump chamber, required excavation to a depth of 9.7 m (32 ft) below ground surface and more than 7.6 m (25 ft) below the gr

    Jan 1, 2011

  • AIME
    New York Paper - An Inventory of Results of Accident Prevention

    By C. A. Allen

    For over three years we have been endeavoring to reduce the number of fatalitics and minor accidents in Utah. The physical condition of the FIG: 1.—Number kiLlEd per million short tons of coal prod

    Jan 1, 1923

  • AIME
    New York Paper - An Inventory of Results of Accident Prevention

    By C. A. Allen

    For over three years we have been endeavoring to reduce the number of fatalitics and minor accidents in Utah. The physical condition of the FIG: 1.—Number kiLlEd per million short tons of coal prod

    Jan 1, 1923

  • AUSIMM
    Developing a Training Strategy for Quality, Safe and Productive Extracting Operations

    The extractive industry has been faced with a situation where there has been no systematic and formalised training and education structure available. Previous structures which were available, e.g. the

    Jan 1, 1997

  • AUSIMM
    Grasberg Block Cave Haulage Project – Design and Construction Update

    By B Mead, N D. Pascoe

    The Grasberg block cave rail haulage system will be located in the Grasberg mining district on the island of Papua, Indonesia at an elevation of almost 3000 m above sea level. It will transport 160 00

    May 9, 2016

  • AUSIMM
    The Influence of Arsenic and Bismuth on the Mechanical Properties of Copper-Nickel-Phosphorus Alloys

    This investigation was planned to determine:1. The precipitation-hardening properties of the copper-nickel-phosphorus alloys; and2. The influence of arsenic and bismuth, singly and together, on the me

    Jan 1, 1944

  • CIM
    Status of Repairs on Two Grinding Mills At Holt-McDermott

    By Pierre Beaudoin

    "This paper deals with the repairs made on two damaged mills. It investigates briefly the causes of the damage, explain its nature and the design of the repair. It explains the detrimental effect on o

    Jan 1, 2001

  • DFI
    Uplift Micropile Load Transfer In Unsaturated Missoula Flood Deposits

    By John N. Cunningham

    Despite the wide use of micropiles for rehabilitating and retrofitting existing structures, little is known regarding the load-transfer distribution of grouted micropiles in various soil deposits. Th

    Jan 1, 2011

  • SME
    Regulatory Toxicology And Pharmacology - Session VI: Risk Assessment Of Asbestos And Other Fibrous Mineral Particulates: Rapporteur?s Report

    1. Paper1?Identification and enumeration of asbestos fibers in the mining environment: mission and modification to the federal asbestos standard Arthur M. Langer Asbestos-related disease is increa

    Jan 1, 2008

  • ISEE
    Adapting Quarry Ace for Beginners to Profile Bench Faces and Optimize Front Row Burden Controls

    By Brian Gar Wingfield

    "The introduction of the QuarryMan laser profile system in 1987, along with the development of the corresponding 3-D software, gave a qualified operator pertinent information about dimensions of quarr

    Jan 1, 1992

  • SME
    Extensive Concrete and Shotcrete Systems for the World?s Longest Tunnel (Gotthard Base Tunnel?56km)

    By Jürg Schlumpf

    Concrete is one of the decisive construction materials, also for the AlpTransit Gotthard Tunnel. The client has many requirements, and many are the solution possibilities that concrete systems can off

    Jan 1, 2008

  • AIME
    Professional Divisions (9585aa83-04df-4ba3-9ce6-868b5f673db3)

    [Chairman ZAY JEFFRIES, Vice-chairman S. SKOWRONSKI, Chairman WILLIAM M, CORSE, Secretary Executive Committee J. R. FREEMAN, JR., Local Section G. E. JOHNSON R. S. ARCHER, Non-ferrous Data

    Jan 1, 1928

  • DFI
    Modern Procedures For The Design Of Driven Pile Foundations

    By G. G. Goble

    Significant progress has been made in the past decade in determining the load bearing capacity of pile foundations. Developments in the means of prediction of pile capacity as limited by soil strength

    Jan 1, 1988

  • AUSIMM
    Geological Exploration at North Broken Hill Limited

    This paper summarizes the progress of geological exploration at North Broken Hill Ltd.The North Mine orebodies occur in knots of minor folds on a simple limb structure which is itself highly folded, g

    Jan 1, 1956