Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Innovative Concept In Tailgate Entry Support: Elimination Of Crib Blocks Through Utilization Of New High Capacity Roof Truss Systems (3aab4965-6f53-4caa-9e67-bf9dbe5d5a16)

    By John C. Stankus

    In this paper, an innovative concept in longwall tailgate support is discussed. This new concept utilizes a new high capacity roof truss system in lieu of conventional wooden crib block. The first fie

    Jan 1, 1994

  • SME-ICGCM
    Highwall Stability Implications from Longwall Mining at Broadmeadow Mine

    By Bob Coutts, Matt Martin, Dan Lynch, Dan Payne

    "The Broadmeadow punch longwall coal mine in Central Queensland Australia has experienced significant highwall movement associated with the effect of longwall subsidence when the longwalls approach th

    Jan 1, 2018

  • SME-ICGCM
    An Integrated Approach to the Monitoring and Modeling of Ground Movements

    By A. Chrzanowski

    The integrated approach to monitoring surveys is based on a simultaneous utilization of geodetic, photogrammetric and geotechnical measurements of displacements, tilts, strains and any other geometric

    Jan 1, 1984

  • SME-ICGCM
    How to Mitigate Coal Mine Bumps Through Understanding of the Violent Failure of Coal Specimens

    By Gamal Rashed

    This research is divided into two parts: the first part of this research focuses on understanding coal mine bump mechanisms, and the second part focuses on mitigating the violent failure associated wi

    Jan 1, 2013

  • SME-ICGCM
    Ground Control Practice at Leeville Underground Mine

    By Changshou Sun

    The geotechnical properties of mining zones at Leeville Underground mine (or simply called Leeville mine through this paper) are different from one zone to another. The typical ground condition is poo

    Jan 1, 2013

  • SME-ICGCM
    Application of Regional Subspace Detection to Identify Mining Related Seismicity

    By Keith D. Koper, Kris L. Pankow, Derrick J. A. Chambers, Michael K. McCarter

    "In a mining environment, high quality seismic event catalogs are often useful in interpreting local stress states and identifying areas with elevated ground control risk. Installation, operation, and

    Jan 1, 2015

  • SME-ICGCM
    An Alternative for More Productive Rib Bolting in Underground Mining Applications

    By Joe E. Bryan, John P. McDonnell

    "Underground mine rib stability is an ongoing safety issue in all mining applications. Rib-related accidents present at least as many problems as roof-related ground control. Underground coal mine rib

    Jan 1, 2015

  • SME-ICGCM
    Volumetric Measurement of Rock Movement Using Photogrammetry

    By Stephen R. Iverson, Jeffrey C. Johnson, Donovan J. Benton, Michael J. Raffaldi, Lewis A. Martin

    "The NIOSH ground control safety research program at Spokane, Washington, is exploring applications of photogrammetry to rock mass and support monitoring. This paper describes two ways photogrammetric

    Jan 1, 2015

  • SME-ICGCM
    Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple Seams

    By Peter Zhang

    "Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa

    Jan 1, 2017

  • SME-ICGCM
    Development And Demonstration Of An Alternate Mining Geometry For Improved Ground Control In An Illinois Coal Mine

    By Y. P. Chugh

    About 60-70% of the underground mined coal in Illinois is extracted using a room-and-pillar mining method that permits extraction of about 50% of the coal. The remaining coal is left behind in the for

    Jan 1, 2004

  • SME-ICGCM
    Chinese And North American High-Extraction Underground Coal Mining Strata Behavior And Water Protection Experience And Guidelines

    By Mao Bai

    Mining in situations where there exists a potential hazard from inundation has always existed in coal mining, and often reserves were left unmined in favor of reserves with no such hazard. However, in

    Jan 1, 1995

  • SME-ICGCM
    Elasto-Plastic Finite Element Structural Stability Analysis Of Room And Pillar Mine Workings (1726bb0c-5e63-4f04-a636-538432c37ec9)

    By S. Bensehamdi

    An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine structur

    Jan 1, 1992

  • SME-ICGCM
    Study of Ground Movement Over a Longwall Mine

    By A. W. Khair

    This paper presents an analysis of ground movements recorded from longwall operations in the Northern Appalachian region in West Virginia. The site chosen for the investigation was selected due to var

    Jan 1, 1987

  • SME-ICGCM
    Estimation Of In-Situ Stress At Ikeshima Colliery Using AE And DRA Method

    By Hideki Shimada

    A low cost methodology that allows the determination of in- situ stress using oriented core specimens has been investigated. The technique can be used to determine the stresses during the early stages

    Jan 1, 2001

  • SME-ICGCM
    Chemical Consolidation For Roadway Surrounding Rock - It's Theory And Applications

    By Jinhua Wang

    Based on engineering examples and theoretical analysis, the mechanism of chemical consolidation for fractured roadway surrounding rock was discussed. The chemical consolidating materials and three con

    Jan 1, 1996

  • SME-ICGCM
    An Assessment of Coal Pillar System Stability Criteria Based on a Mechanistic Evaluation of the Interaction between Coal Pillars and the Overburden

    By Guy Reed, Russell Frith, Kent Mctyer

    "Coal pillar design has historically been based on assigning a design factor of safety (FoS) or stability factor (SF) to coal pillars according to their estimated strength and the assumed overburden l

    Jan 1, 2016

  • SME-ICGCM
    Highwall Mining of Thick, Steeply Dipping Coal: A Case Study in Geotechnical Design and Recovery Optimization

    By David P. Conover, Jake Bain, Christopher M. Ross

    "Highwall mining of thick (up to 100 ft) steeply dipping (20° or more) coal seams provides many challenges, both geotechnically and operationally because seam dips near or in excess of highwall mining

    Jan 1, 2017

  • SME-ICGCM
    Development of Road Header Roof Bolting Module

    By Sean C. Farrell

    In underground mining and tunneling, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Australian companies WDS Limited and Cram Fluid P

    Jan 1, 2014

  • SME-ICGCM
    An Alternative To A Manual Torque Check On Roof Bolts

    By Joseph A. Cybulski

    In response to the mining of reserves with increasingly adverse round conditions and the roof support recommendations of current rock mechanics theories, roof support systems have continued to improve

    Jan 1, 1990

  • SME-ICGCM
    Time Dependent Mining Induced Subsidence Measured by Differential Interferometric Synthetic Aperture Radar

    By Jessica M. Wempen

    Differential Interferometric Synthetic Aperture Radar (DInSAR), a satellite-based remote sensing technique, has been demonstrated as a potentially practical method for measuring mining induced surface

    Jan 1, 2014