Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Case History: Controlled Demolition of a Reinforced Concrete Structure in San Sepolcro, Italy

    By Roberto Folchi

    This note deals about the controlled demolition work for the dismantling of an industrial structure in San Seplocro, Italy. The structure to be demolished, the FLOWERS SILOS, consisted in a multilevel

    Jan 1, 1994

  • ISEE
    Design of New On-Site Emulsion Explosives Manufacturing Plants

    By Thomas E. Brown

    Commercd explosives have evolved through this century f?om dynamite through ANFO to the current lines of Water Gels and Emulsions. Water Gels and Emulsions evolved to counter the lack of water resista

    Jan 1, 1998

  • ISEE
    Vibrations from Seismic Exploration Blast

    By David Siskind

    The authors studied small seismic exploration blasts for vibration characteristics and effects on structures in Mexico. Obtained were 267 three-component recordings of ground vibrations and structure

    Jan 1, 2002

  • ISEE
    Journal: Musings of a Safety Philosopher Relating to Blasting Safety

    By Ralph Dawson

    The following additions to SLP-4 “ALWAYS AND NEVERS” have been approved by the Board of Governors since the last printing 6/97 and will be included in the next printing soon. They are also included in

    Jan 1, 2001

  • ISEE
    Blasting and Groundwater Contamination – Case Study

    By James Tarr, Matthew Eichler, Brent Tardif

    ANFO was being used as one of the blasting agents on a construction site in New England. Groundwater was encountered in numerous blast holes. The blasting contractor was employing typical explosives l

    Jan 1, 2003

  • ISEE
    Design and Testing of Bubble Curtain at Whirl Bay, BC

    By Alastair Grogan

    In October of 2002, the author was retained by Public Works and Government Services Canada, on behalf of the Department of National Defense, to design, construct and test the effectiveness of a bubble

    Jan 1, 2005

  • ISEE
    Ground Motions from and House Response to Underground Aggregate Mining

    By Professor of Civil and Environmental Engineering Northwestern University, Mike Wladron, Gordon Revey

    A unique judicial opportunity allowed measurement of the response of three cracks in residential structure to blasting for underground aggregate mining. Instrumented cracks were located in the interio

    Jan 1, 2007

  • ISEE
    High-wall Control at Anglo Gold Ashanti, Navachab Mine

    By Charles Pretorius, Henk Ludik

    Navachab Mine experiences difficulties with pit wall stability in certain areas of the mine. The main reason for the instability is the fact that the geology comprises many joints and faults. Blasting

    Jan 1, 2006

  • ISEE
    Subdrill – The Underutilised Blasting Parameter

    By Stephen Mansfield

    In metalliferous mining operations, subdrill is that portion of the blast hole that is drilled below the target grade elevation, and in most cases loaded with explosives. Its primary aim is to enable

  • ISEE
    The Actual Cost of Hole Deviation to the Mining Industry - A case Study at Nkana Division of the Former Zambia Consolidated Copper Mines Limited

    By Sam Kangwa, Thomson Sinkala

    In the mining industry, drilling accuracy has a significant effect on the economy of operations. In this paper, results from the Nkana Division of the former Zambia Consolidated Copper Mines are prese

    Jan 1, 2004

  • ISEE
    Protection Against Litigation with Good Pre-Blast Surveys, Damage Inspections and Record Keeping

    By Randall Wheeler, R. Frank Chiappetta

    2000 HIGH-TECH SEMINAR Blasting Technology, Instrumentation. and Explosives Applications - Orlando, Florida, USA July 24 - 27,200O 2000 BAI - PROTECTION AGAINST LITIGATION WITH GOOD PRE-BLAST SURVEYS,

    Jan 1, 2000

  • ISEE
    "Journal: GPS Signal Accuracy Improves"

    By Larry Schneider

    Are you one of the thousands of hunters, fisherman, or hikers who purchased handheld GPS systems over the past several years and then been disappointed in their accuracy and performance. Or maybe you

    Jan 1, 2001

  • ISEE
    Mining to Reduce Future Environmental Liabilities

    By Mark A. Williams

    "This paper was originally intended to be a presentation of a case study of two surface bituminouscoal mines in the southern Appalachian coal fields located within five miles of each other. These mine

    Jan 1, 1994

  • ISEE
    The Effects of the Topographic Bench on Ground Motion from Mining Explosions

    By Jessie L. Bonner, W. Stephen Blomberg, Mark Leidig, Heather Hooper

    Understanding the effects of the bench on ground motion can improve the design of cast blasts and achieve improved blast efficiency while remaining below vibration requirements. A new dataset recorded

    Jan 1, 2005

  • ISEE
    Effects of Electronic Detonators in Underground Tunneling Applications

    By Charles Zdazinsky

    Over-break is undesirable in underground civil construction because it excessively damages rock along the perimeter of the tunnel, which directly influences the cycle times of advancement. A quicker c

    Jan 1, 2015

  • ISEE
    Algorithms for Adaptive Solutions: Essential Tools for Operational Blast Optimization

    By Sushil Bhandari, Amit Bhandari

    Blast optimization in open-pit operations is a task that often remains at a theoretical stage. Indeed, when it comes to operational blast design and onsite implementation, time restrictions and field

    Jan 1, 2019

  • ISEE
    Hole Deviations in Mining Operations: Types, Sources and Effects

    By Sam Kangwa, Thomson Sinkala

    Th e re are three basic types of hole deviations in long hole d ri l l i n g , n a m e l y collar i n g , alignment and tr a j e c t o r y dev i a t i o n s . In mining, the accur a cy in drilling has

    Jan 1, 2004

  • ISEE
    Small Scale Testing of the Effect of Powder Factor, Timing and Charge Distribution on the Impact Breakage of Rocks

    By A Tawadrous, P D. Katsabanis, S Kim

    A series of small scale tests, have been performed to establish the effect of powder factor and initiation timing on the grindability of rocks. The blasts were performed in high quality granite blocks

    Jan 1, 2009

  • ISEE
    Investigations of Shock Tunnel Dynamics and Energy Realization (a197a97d-a574-4dd6-b892-bc2dba4e791b)

    By Joshua Hoffman, Braden Lusk, Kyle Perry

    This study explores how different geometries affect the shock tunnel’s performance and is broken down into three phases. Phase 1: Open arena testing in which theoretical energies produced by the deton

    Jan 1, 2009

  • ISEE
    Platform Loading from Explosions in Saturated Sand using a Visco-Plastic Model

    By W G. Szymczak, Leslie C. Taylor

    The University of Maryland (UMD) has conducted a series of small-scale tests using explosive charges buried in saturated sand. Twelve different combinations of depth of burial of the charge and height

    Jan 1, 2007