Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    30 Hudson Street Foundation Design and Construction in Variable Rock

    By Joel Moskowitz, George J. Tamaro

    "A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s

    Jan 1, 2004

  • DFI
    Analysis and Performance of Sheet Pile Cofferdam under Demolition Blast Loads

    By John Mould, Gordon Chen, Michael Oakland, William McElwee

    "This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn

    Jan 1, 2017

  • DFI
    Behavior Of Pile Groups Arrangement Adjacent To A Sand Slope Under Lateral Load

    By Mohamed A. Sakr

    An experimental study on the behavior of pile group's arrangement under lateral load was carried out in the level ground and at crest of sand slope 3H: 2V. Tests were conducted on single pile and

    Jan 1, 2010

  • DFI
    A Fully Connected Jobsite is a Must for the Future

    By Christian Hoyme, Jochen Maurer

    Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital

    Jan 1, 2019

  • DFI
    Cooperative Effort Overcomes Problems With Pier And Cofferdam Construction Caused By Rock Slope

    By Herbert F. ?Buck? Darling

    A bridge replacement project in Rochester, NY, encountered difficulties when it was determined that rock below one pier was sloping downward toward the river at an angle of 42 degrees versus anticipat

    Jan 1, 2013

  • DFI
    Micropile Transmission Foundations In Environmentally Sensitive, Challenging Terrain

    By Esam Abraham

    A 13.6 mile portion of the 500 kV Tehachapi Renewable Transmission Project crosses the mountains of the Angeles National Forest. Access and environmental constraints precluded road development for mo

    Jan 1, 2010

  • DFI
    Cumulative Settlement Of Pile Group Under Cyclic High-Speed Train Loading

    By Pratik Goel, Sumanta Haldar

    High-speed rail is an emerging area of interest in India. The Government of India is implementing prestigious bullet train projects in various parts of the country. High-speed rail (HSR) will be opera

    Sep 1, 2022

  • DFI
    Performance Based Excavation Support Design For Challenging Urban Site Geometry In Toronto, Canada

    By Shawna Munn, Carol Dounitch, Erika Acton

    The EQ Bank Tower, a 24-storey office tower with 4 levels of underground parking, is currently under construction at 25 Ontario Street in the downtown core of Toronto, Canada. The tower geometry requi

    Oct 1, 2022

  • DFI
    Analysis And Performance Of Sheet Pile Cofferdam Under Demolition Blast Loads

    By Michael Oakland

    This paper will discuss the design analysis of sheet pile cofferdams for static and dynamic blast loads. Following construction of the new Willis Avenue Bridge across the East River between Brooklyn

  • DFI
    Construction of Large Drilled Shafts the 2nd Annual Mike O'neill Lecture

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    May 11, 2007

  • DFI
    Pile Foundations General - .1 Equipment information

    By Bengt H. Fellenius

    .1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1

    Jan 1, 1991

  • DFI
    Load Testing Methods

    This Section describes four alternative methods for load testing of drilled shafts: high strain dynamic test (HSDT), rapid load test, static load test, and bottom load test. Until recently, static loa

    Jan 1, 2004

  • DFI
    As-Built Analysis - An Integral Part Of Pile Foundation Design

    By Dan Yang

    Pile foundation designs are performed routinely based on geotechnical information available at the time of design, often with due consideration of large uncertainties inherent to soils and site condit

    Jan 1, 2010

  • DFI
    Innovative Soe Solutions For Shaft Construction: Getting To Depth With Diaphragm Walls At Westerly Storage Tunnel

    By Ryan Sullivan, Lisa Smiley, Jewels Stover

    The Westerly Storage Tunnel (WST) Project is part of Project Clean lake, the North East Ohio Regional Sewer Dist years. When completed in 2020, WST will be nearly 2 miles of 25-ft diameter tunnel 200-

  • DFI
    Innovative Integrated Jet Grout And Contiguous Cfa Piled Solution For Complex Deep Shoring Wall In Soft Soils – Retaining Structural Design And Analysis

    By W. L. Chong, Y. Zou

    There are many types of Earth Retention Systems (ERS) available in the market where more than one method can be a feasible solution for a project. This paper examines the design and construct process

    Nov 1, 2022

  • DFI
    Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall

    By James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.

    "The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150

    Jan 1, 2016

  • DFI
    The Secret to Dewatering

    By Gregory M. Landry

    "There is an old joke at Moretrench that defines dewatering as “that element of an underground construction project, which, when disregarded, will generate the low bidder.” Sigmund Freud wrote that al

    Jan 1, 2017

  • DFI
    Geophysical Methods For Site Characterization For Marine Foundations

    By Richard E. Sylwester

    Evaluating surface and subsurface conditions for marine foundations (bridges, causeways, terminals, etc.) is often done with a limited amount of data. Subsurface information for these projects is pri

    Jan 1, 2013

  • DFI
    The Emergence Of The Soil-Cement Mixed Wall Technique And Its Application In 1980's

    By Osamu Taki

    The innovative Soil-Cement Mixed Wall Technique emerged in Japan and obtained recognition in the engineering and construction communities in the 1980's. This technique was introduced to the Unite

    Jan 1, 1990

  • DFI
    Case History – San Francisco 49ers NFL Stadium Pile Foundations Santa Clara, California

    By Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi

    "The stadium development consists of construction of a 68,500-seat, open-air NFL football stadium for the San Francisco 49ers. The main structure will consist of a 7-story above grade steel structure

    Jan 1, 2015