    The Benefits of Early Contractor Involvement

    By Robert Small, Amshu Chappa, Ihab Allam

    The Biosolids Digester Facilities Project (BDFP) is located in southeast San Francisco. The jobsite is bounded by active Caltrain and Union Pacific Railroad tracks on the west side and the existing So

    Jan 1, 2023

  • DFI
    Depth Of Borings, Length Of Piles, Landslides, Erosion, And A Moose Hunt - A Case History Of A Comedy Of Mistakes

    By Bengt H. Fellenius

    An upgrading and straightening of a highway included building a bridge across a small river. A routine site investigation was initiated to determine the conditions for designing the foundation of the

    Jan 1, 1987

  • DFI
    Research On The Interaction Between Pile And Foundation Soil By Boundary Element Method

    By Wang Lushuang

    This thesis is devoted to the research of the interaction between pile and foundation soil by boundary element method (BEM for short). The interaction is simulated by the interaction between two diffe

    Jan 1, 1991

  • DFI
    Rock Socket Friction In Drilled Shafts - Its Greater Than You Think - Summary.

    By Jorj O. Osterberg

    The practice of using side shear resistance in the design of drilled shafts socketed in rock is discussed. In the absence of field test data for the particular rock involved, the designer often neglec

    Jan 1, 1991

  • DFI
    Session 14 "Deep Mixing Method III"

    By Stefan Dahlin

    The laboratory tests indicated low permeability but as I said, as a rule, the permeability in the field has been found to be higher. A high permeability has also been found when doing back calculation

    Feb 10, 2003

  • DFI
    Geotechnical Monitoring Of Deep Shoring Adjacent To Train Infrastructure

    By Jakub Szary

    Excavation and shoring adjacent to the above-grade Gilmore train station and elevated guideway was undertaken in 2019. A perimeter secant pile cut-off wall was constructed to a depth 37 m (121 ft) bel

    Sep 1, 2022

  • DFI
    Installing And Testing Multi-bar High Capacity Rock Tiedowns

    By Andrew Pontecorvo, Steven Lowe, David Sposito

    Buildings with large height-to-width ratios require foundations with significant uplift resistance. This paper presents a case study of the permanent rock tiedowns installed for One Manhattan West, a

  • DFI
    Stabilizing A 100 Ft Rock Slope With Limited Access And Tight Construction Tolerances Using Observational Method And Real-time 3d Modeling

    By Travis A. Shoemaker, Mitchell S. Youmans, Nancy T. Chin, Michael S. Senior

    A geologic assessment and stability analysis of the right abutment of Boundary Hydroelectric Dam in Pend Oreille County, Washington was completed in May 2017. The stability analyses identified a poten

  • DFI
    Tension Tests On Driven Pipe Piles In Sand - Synopsis

    By Alan J. Lutenegger

    A series of tension tests were performed on prototype scale steel pipe piles at two sites to evaluate the influence of scale and pile plugging on the unit skin friction developed in axial tension. The

    Jan 1, 2000

  • DFI
    Vibration Isolation at the Dana-Farber Yawkey Center: OPA Finalist

    By David R. Shields, Michael T. Bracher

    "The $330 million (U.S.) Dana-Farber Cancer Institute’s Yawkey Center for Cancer Care (Yawkey Center) sits in the heart of Boston’s Longwood Medical Area. The Yawkey Center is a cutting-edge cancer ca

    Jan 1, 2012

  • DFI
    R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and Performance

    By Michael Cianchetti, Nadir Ansari, Matthew Janes

    "PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations

    Jan 1, 2007

  • DFI
    Applying Reasonable Quality Control and Verification to Soil Mixing

    By David Miller

    "The biggest concern about using soil mixing is the inability to observe physically the final product, which has led to a lack of confidence about what is in the ground. After all, you can’t see it an

    Jan 1, 2017

  • DFI
    Rock Socket Piles In The Sherwood Sandstone Of Central Birmingham

    By L. J. Whitworth

    Five trial piles were constructed during the trial pile programme for the Birmingham International Convention Centre. In addition, trial piles have been tested on two other sites in central Birmingham

    Jan 1, 1989

  • DFI
    Studies On Pile Driving Cushion Materials ? Synopsis

    By H. R. Shen

    Cushion materials are one of the most important links in an efficient piling system. In the past, little has been done in China on this problem, so engineers are still used to those traditional woods,

    Jan 1, 2010

  • DFI
    Laterally Loaded Model Piles In Jointed Soft Rock Masses

    By B. Francis

    Literature provides only limited information regarding the behaviour of laterally loaded piles socketed into weak rock masses. A laboratory program, comprising a number of tests of scaled models of th

    Jan 1, 2004

  • DFI
    Parametric Analysis Of Piled Rafts Founded On A Tropical Clay Of Brazil

    By Renato P. Cunha

    The paper presents the results of a comparative and parametric analysis in which a numerical program developed exclusively for groups of deep foundations under general loading (vertical, horizontal an

    Jan 1, 2002

  • DFI
    Engineering Practice Of Ground Improvement ? Introduction

    By H. R. Taber

    The extensive subject area "Engineering Practice of Ground Improvement" will be treated within the limitations of space and the writer on the basis of personal practice and experience?largely in North

    Jan 1, 2010

  • DFI
    A Seismic Construction Of Piling Head ? Synopsis

    By K. Oshima

    In Japan, earthquakes are experienced frequently. Many buildings and structures in Japan are supported on pile foundations. For these pile foundations, the joint section between the piles and footing

    Jan 1, 2010

  • DFI
    Cape Wind Offshore Wind Farm – Electrical Service Platform – Substructure Jacket Design

    By S. Chilka, I. Maloney, J. Brady

    "The purpose of this project was to design the Electrical Service Platform (ESP) for the Cape Wind Offshore Wind Farm. The ESP structure comprises two primary parts: the topside platform housing the e

    Jan 1, 2017

  • DFI
    Design Of Drilled Shaft Supported Mat Moscow Towers

    By Issa S. Oweis

    Two Towers are currently under construction in Central Moscow in the Russian Federation. Building A is a 96 story tower and Building B is a 65 story tower. The columns in both structures bear on a t