Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Deepest Ever Large Diameter Pipe Pile Installation Demonstration Project New East Span San Francisco-Oakland Bay Bridge

    By Saba Mohan

    For the three full-scale pile installations, two different high-energy hydraulic hammers were selected for the installation. However, these hammers may not have sufficient energy to drive these large

    Jan 1, 2002

  • DFI
    Silver Star Motors “Tackles” Brownfield Site and Adjacent NYCT Subway

    By Dharmil Patel, Michael J. Chow

    "Construction progress is nearing completion at a Brownfield Site for a 100,000sf mixed-use 10 story building plus cellar for Silver Star Motors including a two-floor pre-owned Mercedes Benz showroom;

    Jan 1, 2016

  • DFI
    The Effect of Helix/Wing Plate Deformation on End Bearing Resistance of Screw Piles

    By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano

    "The use of steel screw piles has greatly increased in recent years because of the advancement in the installation mechanism and its performance under compressive, uplift and lateral loads. In a steel

    Jan 1, 2015

  • DFI
    The Little Lake Harris Bridge Settlement Restoration Project: Lessons Learned

    By Amr Sallam, David Thompson, Moataz Hassan

    "The Little Lake Harris (LLH) Bridge was constructed in 1951 to replace the eastwest County Road 48 Bridge connecting the towns of Howey-in-the-Hills and Astatula in Lake County, Florida, United State

    Jan 1, 2015

  • DFI
    Construction Of Large Drilled Shafts (The 2nd Annual Mike O'Neill Lecture)

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    Jan 1, 2008

  • DFI
    Use of Post-Grouted Drilled Shafts in Coastal Mississippi

    By Jacob A. Jordan, Rachel M. Garrett, W. Robert Thompson III, James C. Pegues

    "Environmental control structures for an existing fossil-fuel power generating plant near Pascagoula, Mississippi faced several design and construction challenges due to space limitations. Conceptual

    Jan 1, 2015

  • DFI
    Slope Stabilization of Mill Creek Landslide Using Steel H-Piles

    By Kessi E. Zicko, Eric A. Hackenberg, Paul J. Lewis

    "Following snow melt and spring rains in 2011, a landslide measuring approximately 600 feet long and 300 feet in slope length occurred within the southbound roadway embankment of a heavily travelled 2

    Jan 1, 2015

  • DFI
    Deep Marine Foundations - An Introduction

    By Ben C. Gerwick

    This publication is intended to document recent innovations and technologies that have the best potential for effectively improving the quality of marine foundations while reducing the cost, time and

    Jan 1, 2013

  • DFI
    Bluestone Dam Safety Assurance Program: An OPA Runner Up

    By Jeff Hopple

    "Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en

    Jan 1, 2014

  • DFI
    Resonance Pile Driving with Zero Ground Vibration

    By Mark Johnson, Mathew Janes

    "The Resonator RD 260 Resonant Pile Driver delivers ground disturbance free, high production pile driving. The Resonator has recently been used on numerous production pile driving sites in the Netherl

    Jan 1, 1900

  • DFI
    Instrumented Pile Load Tests In The Area Of Pearl Harbor, Hawaii

    By John Y. L Chen

    This paper presents full-scale instrumented pile static compressive and tensile load tests to be conducted in the area of Pearl Harbor, Hawaii. Thousands of piles have been installed to support the ex

    Jan 1, 2002

  • DFI
    Pile Driving Dilemma: Reducing Noise, Vibrations

    By Michael D. Justason

    "In January 2009, long-time competitors, Anchor Shoring & Caissons Ltd. of Toronto and Bermingham Foundation Solutions of Hamilton, joined forces to tackle one of the Greater Toronto area’s largest de

    Jan 1, 2012

  • DFI
    High Capacity Drilled Piles in Brooklyn

    By Ahmed Elmekati, Frederick C. Rhyner, Steven R. Lowe

    "The current phase of the Pacific Park development (formerly, Atlantic Yards) in Brooklyn involves constructing buildings on a platform over an existing LIRR rail yard. To preserve the maximum amount

    Jan 1, 2016

  • DFI
    Shoring Up D.C.'s Historical Foundations: Collection 14

    By Alan Quiroga

    Nestled between Meridian Park and Howard University in the heart of Washington, D.C., the historic block between 14th, V and W streets North- west featured several original struc- tures, many of them

    Aug 1, 2023

  • DFI
    Risk Management Techniques to Avoid Litigation

    By Kevin Cunningham

    "Litigation resulting from neighboring structures with settlement and/or lateral movement or improper pile design and faulty soils engineering analysis, are a multi-faceted opportunity for law firms.

    Jan 1, 2015

  • DFI
    Real Time Monitoring Of Utility Vaults during Reconstruction of the Elliot Bay Seawall

    By Pierre Gouvin

    "This paper discusses real time monitoring of utility vaults during the reconstruction of the Elliot Bay Seawall in Seattle. The project, undertaken because deterioration of the old wall posed increas

    Jan 1, 2017

  • DFI
    Measured And Modeled Settlements Of Power Plant On Piled Raft Foundations

    By Gianni O. Chieruzzi

    A 400 MW, gas-fed power plant on floating piles and piled raft foundations was constructed in the Province of Moskovskaya, Russia in 2008. The subsurface is characterized by fill underlain by loose t

  • DFI
    Measured and Modeled Settlements of Power Plant on Piled Raft Foundations (2734870e-dd47-46f3-a815-25575798a774)

    By Alireza Ayoubian, Douglas S. Roy, Gianni O. Chieruzzi

    "A 400 MW, gas-fed power plant on floating piles and piled raft foundations was constructed in the Province of Moskovskaya, Russia in 2008. The subsurface is characterized by fill underlain by loose t

    Jan 1, 2017

  • DFI
    Upgrading of the Equipment on CDM Vessels to Accommodate Water Depth and Environmental Considerations

    By Takashi Enomoto

    "The cement deep mixing (CDM) method has a wide range of applications, both on land and at sea. This paper describes the features of the equipment on CDM vessels engaged in maritime construction in Ja

    Jan 1, 2015

  • DFI
    Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a