Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Review on Separation and Treatment of Thorium Resources

    By Zhigao Xu, Ruan Chi, Zhenyue Zhang, Yaoyang Ruan, Zhengyan He

    Thorium is frequently the main radioactive element in rare earth ores and is a resource that can potentially substitute for uranium. Thorium must be separated from rare earths in order to obtain produ

    Jan 1, 2014

  • CIM
    Application of Shovel Bucket Blast Fragmentation Analysis

    By Edmond Chow

    Shovel bucket blast fragmentation analysis is an alternate way to assess blast performance and its effects on downstream mining processes. A camera is installed on the boom of cable shovels, and the s

    May 1, 2011

  • CIM
    Integration and Analysis of Airborne Geophysics and Remote Sensing Data of Sar Cheshmeh Area, Using Directed Principal Component Analysis

    By M. Honarmand, Z. Moezifar, H. Ranjbar

    Abstract - The Sar Cheshmeh area covers an area of 640 km2, and is located in the southern part of the Iranian Volcanic-Sedimentary Belt. ETM+ images have been used for alteration mapping. The Crosta

    Jan 1, 2002

  • CIM
    Catalytic and Non-Catalytic CO oxidation on Au/TiO2 Catalysts

    By Jorge M. C. Soares

    The CO oxidation reaction has been studied on Au/TiO2 catalysts prepared by incipient wetness (IW) and deposition-precipitation (DP) methods. Additionally the assessment of activity was also conducted

    Oct 1, 2003

  • CIM
    Crushing Plant Operation Review and Dust Collection Summary

    By G. P. Holmes

    "Bell Copper is situated (Latitude 55°0''N, Longitude 126°14W) on Newman Peninsula on the east side of Babine Lake at an altitude of 2,450 feet above sea level. The mine site is approximately 170 mile

    Jan 1, 1976

  • CIM
    Reinforcement of Concrete Brick with Marble Waste

    By Zainelabdin Khalid Zainelabdin Elfaki

    The influence of partially replacing cement with marble waste on the workability and compressive strength of concrete bricks was investigated. Three replacement percentages, 10%, 20% and 30% weight ma

    Jan 1, 2014

  • CIM
    Hot deformation in dispersion strengthened aluminum alloys and composites

    By T. R. Bieler

    "Hot forming and superplasticity in powder metallurgy aluminum alloys and composites is reviewed. The effects of alloy composition, particulate composition, size, and size distribution is summarized.

    Jan 1, 1997

  • CIM
    Riviera Tungsten - A Discovery Case History (5337e412-7cba-44c8-aee6-e1729c806564)

    By P. W. A. Walker

    "The Riviera tungsten occurrence in the Cape Province of South Africa was discovered in October 1979 as a result of stream-sediment panned concentrate sampling. The Cape age granite and late Precambri

    Jan 1, 1994

  • CIM
    Evaluation of a composite soil cover to control acid waste rock pile drainage

    By Mike D. Riley, Alan V. Bell, Ernest K. Yanful

    Acid mine drainage (AMD) research under the MEND program has been ongoing since 1988 at the Heath Steele Mines waste rock piles including sulphide material, outside Newcastle, NB. In 1989 approximatel

    Jan 1, 1995

  • CIM
    A Brief Overview of the Process Modeling/Simulation and Design Capabilities of Metsim

    By Curtis Rempel, John Bartlett, Alex Holtzapple

    METSIM is a powerful program capable of modelling and simulating every known metallurgical and inorganic chemical process. METSIM is used by companies throughout the world to design, simulate and cont

    Jan 1, 2014

  • CIM
    An Integrated Open Pit Optimization with Material Scheduling

    By George Dogbe

    Open pit optimization forms the basis of mine design, production planning and construction of mine facilities. The negative effects of this phase may include substantial reductions in ore recoveries,

    May 1, 2004

  • CIM
    Exploratory Data Analysis: A Precursor to Resource/Reserve Estimation

    By A. J. Sinclair

    Abstract-Exploratory data evaluation is an essential part of every high quality, mineral inventory estimate. Efficient analysis involves a thorough organization of available quantitative data that are

    Jan 1, 1998

  • CIM
    Controls at Quemont

    By M. J. Bennett

    "The Quemont mill is primarily a differential flotation plant in which copper, zinc ·and pyrite concentrates are recovered. Native gold and silver are associated in the form of very small particles wi

    Jan 1, 1964

  • CIM
    Deportment Behaviour of Tin in Copper Smelting

    By Chunlin Chen

    Published data on thermodynamics of tin in liquid copper, matte and slag have been reviewed, assessed and used in development of thermodynamic solution models of melts. The developed model/database wa

    Jan 1, 2019

  • CIM
    Self-assembly of surface-charged latex particles into proton-conductive membranes

    By J. Gao

    We present results from our investigation of the concept and practice of using surface-charged latex nanoparticles as building blocks for conductive membranes. Nanoparticles were synthesized by free-r

    Jan 1, 2005

  • CIM
    Biodiversity Conservation Management in the Mining Sector

    By Paul MacLean

    MAC TSM ?Mining and Biodiversity Conservation 1.Corporate biodiversity conservation policy, accountability and communications 2.Facility-Level biodiversity conservation planning and implementation

    May 1, 2011

  • CIM
    Risk Control in Ultimate Pits Using Conditional Simulations

    By Juan Pablo Vielma

    In this work we study how to incorporate risk control to the generation of ultimate pits when orebodies are modeled through a finite number of conditional simulations. To control risk we consider a ch

    Oct 1, 2009

  • CIM
    Valuing copper-gold projects with flexible Monte Carlo

    By Michael Samis

    NOFLEX valuation results ? CF deviations and net CF risk discount factors ??Cash flow deviations indicate average cash flow variability. ??Net cash flow riskdiscount factors (NCFRDFs) indicate the

    May 1, 2006

  • CIM
    The Effects of High Antimony in Electrolyte

    By Bradford C. Wesstrom

    An overview of the challenges encountered at the Freeport McMoRan El Paso Copper Refinery with higher concentrations of antimony electrolyte will be shared. The observations will cover the detrimental

    Jan 1, 2014

  • CIM
    Effect of Post-Impregnation Treatment on AuCl3/?-Al2O3

    By Chih-Huey Lin

    The Au/?-Al2O3 catalyst prepared by AuCl3 impregnation is subjected to the influence of residual chlorine after an oven drying. A post-impregnation NH4OH treatment was able to eliminate chlorine, and

    Oct 1, 2003