Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The pendulum swings

    By Robert B. Parsons

    "The pendulum in Ottawa has swung dramatically from fiscal policy to monetary policy over the last several years. International trends indicate that the pendulum has to start its swing the other way,

    Jan 1, 1991

  • CIM
    Dust Reaction Model in Waste Heat Boiler of Copper Smelting

    By So-Yeong Lee, Moosang Lee, Seung Hwan Ahn, Ho-Sang Sohn, Jongshin Chang

    It is necessary to understand the characteristics, phase changes and chemical reactions of flue dusts introduced from a furnace to an off-gas line in order to achieve the stable operation and the impr

    Jan 1, 2019

  • CIM
    Campaign Life Extension and Refractory Management of Copper Making Furnaces

    By T. Gonzales, M. Maleki, M. Caçador, B. Climenhaga, H. Ghorbani

    The campaign life of furnaces in the copper making industry is greatly affected by damage caused by normal operation cycling and abnormal conditions. Proper monitoring and assessment of the existing c

    Jan 1, 2019

  • CIM
    Deak Resources Corporation Overall Milling Strategy

    By R. D. Lindsay

    Originally the focus of Deak Resources Corporation Business Plan was to establish a method for treating small gold and possibly base metal mineral deposits located in the Kirkland Lake - Noranda area

    Jan 1, 1993

  • CIM
    Predictive Modeling of Rare Earth Element Separation by Solvent Extraction Using Metsim

    By Tommee Larochelle, Henry Kasaini

    "Simulation of rare earth element solvent extraction processes for plant design and optimization is complex, requires extensive bench scale and pilot scale testing, and is traditionally performed usin

    Jan 1, 2016

  • CIM
    Maintenance improvements through the introduction of reliability concepts

    By Leslie McHattie, Sadek E. EI-Alfy

    "The Maintenance Engineering Department at Carol Mining and Concentrating is currently in the process of introducing reliability concepts such as failure analysis, rework elimination, predictive maint

    Jan 1, 1992

  • CIM
    Techno-Economic Aspect of Ore Sorting – Is Sorting A Missing Part in Mining Industry? A Case Study at Sandvik’s Mittersill Tungsten Mine

    By F. Gaul, H. R. Manouchehri, A. Mosser

    "Mining is a major energy intensive industry that contributes in consuming about 7% of the total world’s energy in which almost half in comminution. The underlying trait that drives energy consumption

    Jan 1, 2016

  • CIM
    Cold Water Thawing of Frozen Placer Gravel

    By John Lund

    INTRODUCTION GOLD-BEARING placers of Alaska and the Yukon Territories are buried under a layer of permanently frozen alluvial overburden, or 'muck', which varies in depth from twenty to one

    Jan 1, 1951

  • CIM
    Improvements in Zinc Leach Residue Treatment by the Waelz Process at the Annaka Refinery

    By Y. Kusuda

    Since 1981, the Annaka refinery has recovered zinc from zinc leach residues by the Waelz Process. The important considerations of this process are the prevention of the growth of coating accretions in

    Jan 1, 2006

  • CIM
    Inflation in project evaluation (05075753-63cb-41a5-ba9e-814572deac03)

    By L. D. Smith

    "Those who submit competing proposals for projects seek to present senior management with complete and fully supported material that will not fail under questioning. Hopefully, misleading notions and

    Jan 1, 1990

  • CIM
    Electrochemical Studies of the Performance of Different Mesh Anodes during and after Zinc Electrowinning

    By E. Ghali, W. Zhang, M. Robichaud, G. Houlachi

    "The performances of six mesh and one plate dimensionally stable anodes have been investigated in the zinc electrolyte at 38oC and compared to conventional silver-lead alloy anodes. The electrochemica

    Jan 1, 2016

  • CIM
    Gibraltar Mine SAG Mill Expansion Grinding Ciruit Design (5e5517e1-bab6-43d2-8866-c7d882036c0e)

    By R. J. Rotzinger, K. W. Major

    The Gibraltar Mine and Mill facility were commissioned in 1972 by Gibraltar Mines Ltd utilizing a flowsheet consisting of two stages of crushing followed by a rod mill / ball mill grinding circuit. Du

    Jan 1, 2012

  • CIM
    Les Mines Gaspe - Smelter Operations

    By H. Langlois

    "Included in the Mines Gaspe mining complex located at Murdochville, Quebec, is a copper smelter which comprises a reverberator furnace, two Peirce-Smith converters, an anode furance, and a sulphuric

    Jan 1, 1993

  • CIM
    Effect of Pore Pressure on Stress Reorientation and Hydraulic Fracture Deviation

    By S. S. Rahman, A. Gholami, M. A. Aghighi

    "This paper provides a foundation for studying the growth of fractures in presence of other discontinuities and different anisotropies of low permeable hydrocarbon formations and helps to improve the

    Jan 1, 2015

  • CIM
    Grinding simulation in Applesoft Basic

    By R. del Villar, A. R. Laplante

    "This article presents four grinding simulation programs, written in Applesoft BASIC. The firs t two calculate residence time distributions (RT Ds) for open and closed loops mills. The third program c

    Jan 1, 1985

  • CIM
    Making it Work: Canadian Institute of Mines

    Overview of Presentation Why Enter Agreements with First Nations Making it Win-Win ?The Principles The Process Making the Process Work Resource Agmts Defined Resource Agreements are legall

    May 1, 2009

  • CIM
    Coal Processing at Fording Coal Limited

    By Al Gagnon

    Since start-up in 1972, many circuit problems have been encountered, most of which were related to the abundance of fines (-28 mesh), which the circuit had not been designed to treat. The major proble

    Jan 1, 1978

  • CIM
    Mineralochemical Characterization of Calcines and Flue Dusts during Neutral Roasting of Arsenic Copper Concentrates in the Pilot Plant of University of Concepción.

    By I Wilkomirsky, F. Parada, R. Parra, E. Balladares

    "The neutral roasting of As bearing copper concentrates is confirmed well established and promising option for the treatment of this type of complex concentrate. The AS elimination by volatilization a

    Jan 1, 2014

  • CIM
    Turning ore into rock

    By Robert B. Parsons

    "A study recently completed by the Prospectors and Developers Association, assisted by the author and computerized mine models he developed, presents a strong case that present tax rules severely hand

    Jan 1, 1985

  • CIM
    Towards 5.0 million tonnes of pellets per annum

    By Ronald C. Schimmel

    In 2006, the Corus IJmuiden pellet plant produced approximately 4.6 mln tonnes of pellets. Corus IJmuiden is about to increase its pig iron production to 6.4 mln tonne HM per annum. The burden of th

    May 1, 2007