    Potential Cadjebut Plant Performance Enhancement by the Air-Sparged Hydrocyclone

    By Willey GJ

    A brief test program was undertaken to assess the viability of air-sparged hydrocyclone beneficiation at the Cadjebut concentrator. Three different process streams were processed (lead rougher feed,

    Jan 1, 1993

  • AUSIMM
    The Selective Flotation of Xenotime from Heavy Minerals (d2ea84ae-bc96-48df-ac17-ece82387c51d)

    By Hutchinson H

    Froth flotation is applied to mineral sand concentrates in order to produce commercially viable xenotime concentrates. Experiments indicate that a xenotime product containing 38% Y203 at 47% recovery

    Jan 1, 1990

  • AUSIMM
    Effect of Confinement on Ground Vibrations Due to Blasting

    By Silitonga M

    Generally, the acceptable parameter for predicting the intensity of ground vibration due to a blast is the amount of explo ive u ed and the distance from the explo ion. A eries of closely controlled t

    Jan 1, 1984

  • AUSIMM
    Commissioning of the Bindura Pressure Leach Plant

    By Channon W, Dube M, Makwana M, Kerfoot D. G

    In early-1995, the Bindura Nickel Corporation commissioned a pressure leach plant at its Smelter and Refinery complex located in Bindura, Zimbabwe. The novel pressure leach process was developed by

    Jan 1, 1996

  • AUSIMM
    Bringing the Croesus Shaft Back into Production

    By Warren R

    Croesus Shaft is one of two operating shafts on North Kalgurli Mines Limited's Fimiston lease.At the cessation of gold mining in 1974, the workings at Croesus were allowed to flood. Large quantit

    Jan 1, 1985

  • AUSIMM
    The Use of Nitrogen Intertisation in the British Isles

    The problem of spontaneous combustion has long exercised the minds of Mining Engineers. The idea of inertising an area with a non combustible gas has seemed to be an attractive way to overcome the

    Jan 1, 1988

  • AUSIMM
    The Role of Paleography in the Location of Marine Placers (141ac868-c005-4474-9d79-fae6789de329)

    With some notable exceptions, marine placers located just below, or just above, present sea level, are responsible for much of today's production of detrital ilmenite, rutile, zircon, and othe

    Jan 1, 1980

  • AUSIMM
    The Design and Construction of Intersection in Situ Tunnel Openings in the Murl Project

    The four major contracts for the construction of Museum Station are: 1) Installation of Soldier Piles, 2) Structural Contract including the temporary support, 3) Architectural Finishes which include

    Jan 1, 1981

  • AUSIMM
    Alimak Vein Mining

    Martin Mining and Tunnelling Pty Ltd is a mining contractor with offices in Kalgoorlie, WA, Australia and Timmins, Ontario, Canada.Martin Mining and Tunnelling Pty Ltd offers services in mine contract

    Jan 1, 1993

  • AUSIMM
    A Positive Effect on Productivity - The Introduction of Breast Mining Techniques to Emperor Gold Mining Company Ltd, Vatukoula, Fiji

    By Harmse C

    Gold mining in Vatukoula had been a low tonnage/high grade operation for much of its 55-year life. During 1991 it became clear that a change in direction was needed if the mine was going to continue t

    Jan 1, 1993

  • AUSIMM
    A Mining Puzzle

    To the south and west of Broken Hill lies the Thackaringa silver-lead district, about 25 miles, and is the locality really of the first silver find in the country long before Broken Hill, the geologic

  • AUSIMM
    The Australian Mineral Exploration Industry ù Dead or Just Resting?

    By D Ryan

    Following a long period of increase, there has been a reduction in exploration expenditure and activity in Australia over the past two years. During the post Second World War period, exploration was l

    Jan 1, 2000

  • AUSIMM
    Why the Mining Industry is Critical to Sustainable Development ù Greenhouse Gas Emissions Policy, a Case Study

    Mining epitomises the challenge of sustainable development, because few sectors have such a direct impact on the natural environment, yet few are more important to the economic and social health of al

    Jan 1, 2006

  • AUSIMM
  • AUSIMM
    Consultants and Financing The Ore Reserve Audit

    Mineral resource and ore reserve estimation is a challenging and demanding field, requiring application of professional knowledge, skill and experience of the highest order. If the many potential ha

    Jan 1, 1990

  • AUSIMM
    Mineralogy of the Benambra Sulphide Deposits

    The Benambra deposits, which are regarded as volcanogenic in origin, may be subdivided into two major bodies, termed the Wilga and the Currawong deposits; these are further subdivided into smaller,

    Jan 1, 1989

  • AUSIMM
    An Investigation of Cobalt Recovery on a Complex Oxidation Mine with High Per Cent of Mud

    An Investigation of Cobalt Recovery on a Complex Oxidation Mine with High Per Cent of Mud

    Sep 13, 2010

  • AUSIMM
    Mine Production Scheduling with Linear Programming - Development of a Practical Tool

    By Griffin P

    The project is the result of a European Commission supported collaboration between Surpac Software International, the Technical University of Berlin, and the industrial partners Exploration and Berg

    Jan 1, 1998

  • AUSIMM
    Formation of Iron Nitride and Manganese Nitride

    A/method of introducing nitrogen into alloy steels using iron and ferromanganese nitrides is considered. Data are I ded on the nitrides produced. The kinetics of the formation of the'nitride prod

    Jan 1, 1970

  • AUSIMM
    Rehabilitation of the Ballarat Goldfields

    Successful restoration of Ballarat region alluvial gold workings to Box-Ironbark forest requires realistic evaluation of techniques. A stocking level threshold of 68 percent is used to rate the succes

    Jan 1, 1992