Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Mechanisation and Development of the New South Wales Coal Industry Over the Last 20 Years

    The New South Wales coal industry is a highly mechanised well organised industry which has developed from an annual production of slightly less than 13 million tons in 1950 to over 33 million tons in

    Jan 1, 1971

  • AUSIMM
    Calcining Aluminum Trihydrate in a Circulating Fluid Bed, A new Technique

    Increasing demands on quality of metallurgical grade alumina and for lower production costs led to the development of a new fluid bed calcining process. The process, jointly developed in Germany by Ve

    Jan 1, 1972

  • AUSIMM
    Why the Overall Exponent in Gy's Formula Almost Never Gets Close to 2.5

    Once and for all, the debate on the exponent in Gy's formula is pushed to its limit. It is explained why an exponent of 2.5, obtained when using a square root of nominal size d to adapt the value

    Mar 1, 2010

  • AUSIMM
    The Influence of Mining on Sediment Geochemistry of the Waitekauri Catchment, Waihi, New Zealand

    By J G. Webster-Brown, K L. Brown

    The Waihi Region is host to many low sulphidation epithermal Au-Ag deposits. The Golden Cross mine located at the head of the Waitekauri River, eight kilometres NW of Waihi, was a gold mining operatio

    Jan 1, 2003

  • AUSIMM
    Notes on a Railway Tunnel Carried on Timber

    The timber township of Powelltown, Victoria lies N.E. of Yarra Junction, 60 miles east of Melbourne and in the site of the mill of the Victorian Hardwood Company Proprietary Ltd.A lift gauge railway o

    Jan 1, 1925

  • AUSIMM
    Western Lode Structures and Southward Extensions of the Boulder Mining Belt

    An intensely sheared and mineralized zone occurs in the quartz dolerite greenstone (or younger greenstone) mass on the western limb of the Kalgoorlie syncline. This zone comprises the western part of

    Jan 1, 1964

  • AUSIMM
    Reverberatory Smelting Plant, Mount Morgan

    During the latter part of 1937 consideration was given to the construction of a; local smelting plant for producing blister copper. Previously copper concentrates had been shipped to the United States

    Jan 1, 1939

  • AUSIMM
    Paper No. 170. Fine Grinding Test: Tube Mill And Grinding Pans. Broken Hill South Mine.

    IN December, 1905, a Forwood down-wheeler grinding pan (5 ft dialmter), and similar in design to those in use on the Kalgoorlie goldfields, was installed for experimental work in connection with fine

    Jan 1, 1909

  • AUSIMM
    Defining a Sampling Strategy for a Continuous Flow Supported by Geostatistical Simulations

    By D M. Marques, J F. C L Costa

    The estimation of process plant head grade is not trivial and is a source of constant dispute within the mining industry. Grade estimates informed by the short term mine planning are frequently not re

    Aug 21, 2012

  • AUSIMM
    Geotechnical Factors Affecting Coal Recovery in the Maramarua, Mokau, and Ohinewai Deposits

    By B W. Riddol1s

    The 1983 Energy Plan calls for an increase in North Island coal production from both underground and opencast sources from the 1982/1983 production of 843 000 tpa to approximately 3.4 Mtpa within the

    Jan 1, 1984

  • AUSIMM
    Macraes New Zealand Success Story

    Who Macraes Mining Company Limited is can be summed up by the following statements: +         We have been New Zealand's largest gold producer for seven ye

    Jan 1, 1997

  • AUSIMM
    Tectonic Severance of Links between Placer Gold and its Sources, Southern New Zealand

    By D Craw, P Upton

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Otago Schist belt of southern New Zealand hosts widespread orogenic gold deposits. Eros

    Mar 18, 2015

  • AUSIMM
    Utilisation of Latrobe Valley Brown Coal Fly-Ash

    By Milner A, Brockway D, Hodges S

    The combustion of brown coals in Latrobe Valley power stations produces approximately 500 000 tonnes of solid wastes each year. This material, which includes precipitator ash, char and furnace ash,

    Jan 1, 1992

  • AUSIMM
    Observations on the Zinc-Lead Lode at Rosebery, Tasmania

    The zinc-lead lode at Rosebery, on the West coast of Tasmania, has a total length of over 4000 ft. It consists of five elongated lenses parallel to the foliation planes of the quartz sericite schist,

    Jan 1, 1934

  • AUSIMM
    Copper mineralization in the Patawarta Diapir, northern Flinders Ranges, South Australia

    By Both R. A, Daily B

    The Patawarta Diapir, located in the northern Flinders Ranges (South Australia), has intruded into late Proterozoic Wilpena Group sedimentary rocks. The diapir contains disrupted blocks of a wide vari

    Jan 1, 1986

  • AUSIMM
    Processing Copper-Gold Ore at Ok Tedi

    By Kanau JL, Kilgour I

    This paper describes the metallurgical processes at the 80 000tpd Ok Tedi Mining Limited concentrator, which treats copper- gold ore by single-stage crushing, SAG and ball milling and flotation to

    Jan 1, 1991

  • AUSIMM
    Main Events in the History of Mineral and Energy Resource Development in New Zealand

    By A B. Christie, R L. Brathwaite

    Since the first occupation of New Zealand in 800 - 900 AD, various useful minerals, rocks, and energy resources have been identified and extracted. The Maori prized greenstone for ornaments, tool

    Jan 1, 1993

  • AUSIMM
    Paper No. 169. The Training of a Mining Engineer.

    A GREAT deal of attention has lately been given to the discussion as to the education required for engineers, and especially for mining engineers. The Institute of Civil Engineers has had a committee&

    Jan 1, 1909

  • AUSIMM
    Mobile Crushing and Screening Plant Applications for Small- to Medium-Sized Iron Ore Projects

    By D Connelly

    There is now a new generation of mobile crushing and screening plant systems available which have been developed based on the motivation of reducing truck haulage. Newly designed mobile crushing and s

    Aug 12, 2013

  • AUSIMM
    Digital Simulation of Particulate Processes

    Digital Simulation of Particulate Processes The inherent complexity of mineral particulates (shape, size and mineralogical texture) has challenged conventional simulation model approaches for decades

    Sep 13, 2010