    What Project Managers must Demand from an Economic Evaluation!

    By P Card

    Some project managers accept unsatisfactory economic evaluation modelling because they are unaware of what constitutes good practice. They tend to leave it to the evaluation specialist or others to de

    May 24, 2012

  • AUSIMM
    Problems and Changes Under Queensland Mining Legislation

    By North R. A

    The Queensland Mining Act 1968-1972 has now been in force for almost two years. The Act was completely re-written and has made for easier working, e.g., there is no distinction now between Gold Min

    Jan 1, 1974

  • AUSIMM
    Examples of Groundwater Sustainability Issues in Mining

    For Australian mining projects, sustainable groundwater use is typically defined as a groundwater extraction regime, measured over a specified planning time frame, which allows acceptable levels of st

    Jan 1, 2006

  • AUSIMM
    Assessing the volume change behaviour of red mud through laboratory and field testing

    By D J. Williams, A Shokouhi, A Naderian

    Extracting alumina from bauxite involves the production of fine-grained waste known as red mud. The highly alkaline red mud is usually neutralised by applying sea water, thickened to between 25% and 3

    Jul 23, 2018

  • AUSIMM
    Problem roadways in an underground decline solved through the application of Roller Compacted Concrete (RCC)

    By D Bruce, D Cox

    The main access decline at Carrapateena mine was excavated through two different underground aquifers. In these areas of decline, pressurised water finds the path of least resistance through the rock

    Mar 15, 2021

  • AUSIMM
    Water Management at BHP Billiton Olympic Dam

    BHP Billiton Olympic Dam produces copper cathode, uranium oxide concentrate and refined gold and silver. The operation is comprised of an underground Mine and Processing Plant and is located 560 km no

    Jan 1, 2006

  • AUSIMM
    Accurately defining failure geometries and their variability

    By E J. Hancock, K H. B Chu

    Failures within hard rock underground excavations have historically been defined by a depth of failure, estimated in the field or through individual measurements, with a simplified failure geometry; s

    Nov 29, 2022

  • AUSIMM
    The 250 million ton per annum spatial digital twin

    By M Pomery

    BHP’s Western Australian Iron Ore Operations (WAIO) move approximately 250 million tons of ore per annum. The magnitude of the constant changes to the terrain models along with the diverse output and

    Sep 18, 2023

  • AUSIMM
    Assessment of ground support requirements in coal burst-prone mines

    By J Watson, C Zhang, I Canbulat, C Wei

    Coal burst is defined as a dynamic release of energy within the rock or coal mass in underground coalmines that causes violent rock or coal ejection in the vicinity of mine excavations. It poses one o

    Nov 29, 2022

  • AUSIMM
    A System of Diluting Methane to Safe Levels

    By R Hughes

    "Spring Creek Mine uses high pressure water to extract the thick Main seam in the Upper Rewanuicoal measures. The extraction method results in the creation of large voids which collapsespontaneously.

    Jun 1, 2012

  • AUSIMM
    Blast Design Using Measurement While Drilling Parameters

    By M Higgins

    Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collectio

    Jan 1, 2001

  • AUSIMM
    Managing the Diamond Drilling Interactions in Commissioning the Ankata Underground Mine

    By L Sandery, S Light

    Within 22 months of commencing decline development, the Prominent Hill Ankata Underground Project achieved its full production rate of 1.2 Mt/a.In 2010 construction of the Ankata Underground Project w

    Mar 24, 2014

  • AUSIMM
    Optimising Mobile Equipment Resources in Massive Mining

    Mobile mining equipment presents only a small portion (ten per cent mining project costs but the selected technology will determine to a large extent the mining performance and mine profitability. The

    Jan 1, 2000

  • AUSIMM
    Case Study – Application of RISKGATE to Managing Strata Failure in an Australian Coalmine

    By J Harris, J Turner, P Kirsch

    Coal mining is recognised globally as a hazardous activity, and as a result operates under high levels of regulatory and public scrutiny while managing a workforce operating in a high-risk environment

    Nov 5, 2014

  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014

  • AUSIMM
    Structuring Meaningful Mentoring

    By J Coombes

    Within the mining industry there is a growing trend of placing inexperienced technical people into positions of responsibility beyond their readiness. Their responsibilities often include providing th

    Nov 20, 2012

  • AUSIMM
    Interacting with the Daily Operations and the Need to Plan for Future Rehabilitation

    Mine site rehabilitation is the repair of the disturbance caused by mining on the immediate mining area and also on the surrounding environment. The long-term objectives of rehabilitation can vary fro

    Jan 1, 2007

  • AUSIMM
    Deriving maximum value from mineral waste streams

    By D Osborne

    Current mineral extraction and valorisation activities still have a strong focus on the ‘delivered product(s)’ which might be a bulk commodity such as metallurgical coal, hematite, bauxite, etc., and

    Sep 1, 2024

  • AUSIMM
    Goafstream Sampling and the Barometer

    By M Brady

    "It has long been recognised that the barometer infl uences areas of underground coal mines that havebeen sealed off from the current, or active, mine workings but it appears litt le formal research h

    Jun 1, 2012

  • AUSIMM
    Quantification of Drill Hole Deviation – Century Mine Case Study

    By C D. Pocock

    Maintaining catch berm capacity in open pit mines through controlled blasting prevents production delays associated with managing risks associated with wall instability. A method has been developed to

    Nov 8, 2011