Search Documents

  • SAIMM
    Towards A Mineral Property Valuation Code: Considerations For South Africa

    By F. T. Cawood

    One of the consequences of globalizing mine finance is a necessity to apply uniform accountancy and valuation standards that are clearly understood and consistently applied by the global investment co

    Jan 1, 2004

  • AUSIMM
    Computers - Overcoming the Phobia: Understanding Resources - Effective Mine Planning - Increased Profit

    By M Bourke

    Modern computers and software provide powerful tools for the geologist to construct reliable models of geological resources, and the mining engineer to produce accurate and workable mine plans. Over t

    Jan 1, 1999

  • SME-ICGCM
    Classification Of Large Seismic Events At The Lucky Friday Mine

    By J. K. Whyatt

    The paper presents an approach to design a multi level room and pillar layout in a 40m thick seam overlain by a major aquifer. The design was required to maximise extraction with due consideration of

    Jan 1, 1996

  • CIM
    Dynamic Testing of Friction Rock Stabilisers

    A rough simulated borehole has been developed for the installation and dynamic testing of rock bolts a the WASM Dynamic Test Facility. The rough simulated borehole is used for rock bolts that are sens

    May 1, 2009

  • ISEE
    Common Test Methods Used to Measure Properties of Commercial Explosives

    By Gary Eck, Kevin Tallent

    Over the past decades, the science of energetic materials has advanced dramatically in both the fields of military munitions, as well as industrial explosives. Out of necessity, test methods to measur

    Jan 1, 1998

  • DFI
    The Waterloo Barrier - A Sealable Joint Steel Sheet Piling For Groundwater Control And Remediation - Presented At The Deep Foundations Institute Annual Meeting & Conference Toronto, Ontario, October 15-17, 1997 - Summary

    By Murray Gamble

    A new type of groundwater cutoff wall has been developed at the University of Waterloo. The Waterloo Barrier? is a steel sheet piling system that incorporates a sealable cavity at each interlocking jo

    Jan 1, 1997

  • SAIMM
    Impala Platinum Smelter, Rustenburg - An Integrated Smelter Off-Gas Treatment Solution

    By G. Westcott

    Impala Platinum, the second largest platinum producer in the world, is embarking on a major expansion strategy to increase its platinum output from 1.95 moz to 2.8 moz by the year 2008. The smelter co

    Jan 1, 2007

  • NIOSH
    IC 9358 A Microcomputer Network For Control Of A Continuous Mining Machine

    By William H. Schiffbauer

    This report details a microcomputer-based control and monitoring network that was developed in-house by the U.S. Bureau of Mines and installed on a continuous mining machine. The network consists of m

    Jan 1, 1993

  • AUSIMM
    PeckÆs Centrifugal Elevator

    The centrifugal elevator invented and patented by the writer is designed for the purpose of conveying the tailings of a gold dredge to such a distance that it shall not impede the dredging opperations

    Jan 1, 1904

  • SAIMM
    Sidewall Design For Improved Lining Life In A PGM Smelting Furnace

    By I. McDougall

    The matte/slag tidal zone in a nickel-copper-iron-sulphide matte smelting furnace is subject to severe process conditions that can lead to premature failure of the lining. The MgO-FeO-SiO2 slag is agg

    Aug 1, 2013

  • SAIMM
    Common-Sense Improvements To Electric Smelting At Impala Platinum

    By V. Coetzee

    Keywords: Pyrometallurgy, furnace, PGM, platinum, nickel, copper, electric smelting, six-in-line, Peirce-Smith, Impala Platinum In 1992, a paper was compiled highlighting a common-sense approach t

    Jan 1, 2006

  • AIME
    Reservoir Engineering - General - A Correlation of the Viscosity of Hydrocarbon Systems With Pressure, Temperature and Composition

    By H. T. Kennedy, J. E. Little

    An empirical equation for the prediction of the viscosity of several pure paraffin hydrocarbons and nitrogen is presented. It involves temperature, pressure and six constants of the material, and it a

    Jan 1, 1969

  • CIM
    Benefication of Low Grade Ore at the Detour Lake Mine

    "The Detour Lake Mine is located in northeastern, Ontario, approximately 300 kilometres northest of Timmins and 185 kilometres by road northeast of Cochrane. The mill processes a free milling gold or

    Jan 1, 2016

  • SAIMM
    The Balancing Act Of Size Vs. Cost Vs. Practicality

    By Org de Wet

    This paper summarises the strategy for selection between a two module coal plant incorporating large, but less equipment, and a three module coal plant with more but smaller equipment. The two options

    Jan 1, 2006

  • AUSIMM
    Mount Morgan Limited Gold Clean-up Practice at Oxide Mill

    At the present time this plant is treating by direct cyanidation 1,000 tons of ore from Open Cut mining and dumps, and 1,200 tons of current flotation tailing obtained from the Sulphide Mill, per day.

    Jan 1, 1939

  • AUSIMM
    Some Notes on "The Davis Calyx Drill".

    All previous attempts to cut rock in boring by means of revolving steel cutters have failed, chiefly in consequence of the mis-shapen teeth grinding the rock and themselves simultaneously, until, afte

  • CIM
    A pilot-scale evaluation of the effect of grind size on the recovery of a UG2 platinum ore

    By Trevor Harris, Martin Harris

    "This paper evaluates the effect of grind size on the flotation performance of a platinum ore from the UG2 reef of the Bushveld Igneous Complex, in South Africa. The study was conducted on the Mintek

    Jan 1, 2002

  • NIOSH
    OFR-182-82 Burial Of Potentially Toxic Surface Mine Spoil

    By L. B. Phelps

    A method is presented for the burial of potentially toxic spoil in high density zones or packages within spoil piles. Such burial could reduce the outflow of pollutants and thus minimize contamination

    Jan 1, 1981

  • SME-ICGCM
    Design Of Longwall Extractions Under Flooded Abandoned Workings In The Sydney Coalfield

    By Peter Cain

    Longwall extraction in the Phalen Scam in the Sydney Coalfield of Nova Scotia is carried out under flooded abandoned workings in the Harbour Seam 140 m above, and at depth of up to 700 m beneath the A

    Jan 1, 1996

  • SAIMM
    New systems for geological modelling-black box or best practice?

    By C. Birch

    "A ‘geologically constrained’ orebody model has long been hailed as vital for a Mineral Resource statement that is compliant with the South African Code for Reporting of Exploration Results, Mineral R

    Jan 1, 2014