Search Documents

  • NIOSH
    RI 5326 Analyses Of Brines From Oil-Productive Formations In Oklahoma ? Introduction And Summary

    By Jack Wright

    The analysis of water produced with crude petroleum has interested oil producers since inception of the industry. Records of the first analysis of mineralized water produced from an oil-productive for

    Jan 1, 1957

  • SME
    The Kensico–City Tunnel for New York City Water Supply

    By Robert J. F. Goodfellow, William A. T. Meakin, Kevin Clarke, Eric Cole

    INTRODUCTION New York City Water Supply—Background and History Since the 1840s New York City has been developing the largest, and perhaps, the best urban water supply and distribution system in

    Jan 1, 2005

  • NIOSH
    OFR-115(1)-83 Development Of An Improved Man Transit Vehicle -Volume 1

    By Bruce Pinkston

    This report presents a description of the Prototype Demonstration Vehicle developed under U.S. Bureau of Mines Contract No. JO 366003, "Improving Man Transit Safety". This vehicle was constructed

    Jan 1, 1981

  • SME
    New Developments In Plastics Separation

    By J. I. Schoenherr, G. Schubert, F. Demczenko

    The currently known and used plastics and rubber recycling or sorting processes cannot be applied efficiently and economically due to large amounts of fine bulky materials (<3 mm). These wastes are mo

    Jan 1, 2002

  • AUSIMM
    Alluvial Platinum in the Howard Valley, Nelson Lakes Area û Origin and Comparison with Some Other New Zealand Platinum Occurrences

    By K Palmer

    Alluvial platinum was recovered during gold mining operations in Maud Creek, a tributary of the Howard River. Average electron probe analyses give Pt 88.75, Fe 5.27, Ir 0.70, Os 1.06, Pd 0.34, Ru 0.14

    Jan 1, 1987

  • SAIMM
    Estimation Of Optimum Specific Energy Based On Rock Properties For Assessment Of Roadheader Performance

    By C. Balci

    Specific energy is defined as the amount of work required to break a unit volume of rock and is used to predict the performance of mechanical miners. It is obtained from full-scale rock cutting experi

    Jan 1, 2004

  • NIOSH
    OFR-120-81 Rod Mill Grinding: Analysis Of Size Reduction Kinetics And Material Transport

    By Douglas W. Fuerstenau

    A detailed experimental study of breakage kinetics in a batch rod mill indicates that while the system is inherently nonlinear, the feed disappearance kinetics for the finer sizes and the coarser size

    Jan 1, 1980

  • DFI
    Quality Assurance In Jet Grouting For A Deep Seated Slab In Amsterdam

    By Thomas Passlick

    By means of further developed machines and techniques and with growing experiences in jet grouting, the challenge of this building method becomes more and more complex. To keep the concerning risks as

    Jan 1, 2006

  • AUSIMM
    Stripping of the Southern Exhaust Airway at Mount Lyell

    In the latter half of 1973 a contract was given to Roberts-Holland Joint Venture for the stripping of the southern exhaust airway.The contract was carried out efficiently and relatively cheaply. It wa

    Jan 1, 1974

  • SME
    A Generalized Multiperiod MIP Model For Production Scheduling And Processing Facilities Selection And Location ? Introduction

    By Ralph W. Barbaro

    In the mineral industry, the objective of a mining venture is to extract, process, and market a mineral commodity in such a manner that the profit of the venture is maximized. In a mining venture, a c

    Jan 1, 1983

  • SAIMM
    Equilibrium Interactions Between Freeze Lining And Slag In Ilmenite Smelting

    In ilmenite smelting, the FeO content of the feed material (nominally FeO.TiO2) is decreased by reduction with carbon. In a parallel reaction, a significant amount of the TiO2 is reduced toTi2O3. One

    Jan 1, 2004

  • SME
    Dewatering of Mine Waste Using Geotextile Tubes

    By Gökhan Çevikbilen, Ümit Karadoğan, Sevde Korkut, Berrak Teymur

    This study proposes a methodology for dewatering of mine waste using a multistage process, combining geotextile tubes and anionic polyacrylamide (PAM), which accelerates the recycling process of water

    Sep 29, 2022

  • NIOSH
    OFR-93-78 Dynamic Practice Size Measurement Of Coal Dust

    By Virgil A. Marple

    The primary purpose of this contract was to evaluate methods and techniques by which the size distribution acid concentration of mining-related dusts can be measured. One result has been the developme

    Jan 1, 1977

  • CIM
    Selective Highwall Mining at the Dome Open Pit Mine

    By J. G. Henning

    Following completion of planned mining operations at the Goldcorp Dome Open Pit Mine, a high-grade Shaft Pillar located in the pit highwall was recovered. Mining of this Shaft pillar faced numerous ro

    May 1, 2009

  • SME
    Mine Lanps

    Man’s search beneath the earth for minerals has always required light, and the devices used to provide illumination have been both innovative and unusual —from stone vessels holding fat and a wick of

    Jan 7, 1980

  • SME
    Design and Construction of the DLR Extension to Woolwich Arsenal, London, UK

    By Andy Alder

    The Docklands Light Railway (DLR) Extension to Woolwich Arsenal provides a much-needed public transport link to this area of London. The project includes construction of 5.3mID running tunnels under t

    Jan 1, 2008

  • DFI
    Dynamic Pile Testing In Soils Exhibiting Set-Up - Introduction

    By Juan M. Antorena

    A dynamic testing program was performed to evaluate installation procedures, assess capacity of 610-mm (24-inch) diameter open ended steel pipe to evaluate set-up and provide minimum pile tip elevatio

    Jan 1, 1995

  • AUSIMM
    Avoiding Unnecessary Drilling

    The extra information brought by further drilling may seem necessary to achieve control over block grades if elementary estimation techniques are used. However a geostatistical study of an Australian

    Jan 1, 1975

  • CIM
    The St. Lawrence deposit, Seeley’s Bay, SE Ontario — A major wollastonite skarn in the Frontenac Terrane

    By T. A. Grammatikopoulos, B. Vasily, A. H. Clark

    "The St. Lawrence deposit is a large wollastonite skarn (ca. 9 Mt @ 41.3% wollastonite) adjoining the gabbroic-to-syenitic Leo Lake pluton in the granulite facies Frontenac Terrane of the Grenvillian

    Jan 1, 2003

  • AUSIMM
    Creative Tension: Environmental Issues and Resource Development

    All development proposals have to run the gauntlet of the approvals process. Major resource projects are generally subject to particularly intense scrutiny. The key element in the approvals process

    Jan 1, 1992