Search Documents

  • SME
    Bridgestone opens mining tire plant in South Carolina

    By Ken Goering

    "Bridgestone Americas opened the company’s first U.S.-based giant off-road radial (ORR) tire plant in November. The 139,000-m2 (1.5 -million-sq ft) plant, located on a 222-ha (550- acre) site in Aiken

    Jan 1, 2014

  • SME
    San Vicente Pipeline Tunnel?Reach 4W, 3, And 2: Case History

    By Michael Jatczak

    The San Vicente Tunnel Project is an 11-mile water tunnel constructed for the San Diego County Water Authority. One of the many challenges of the project included tunneling a 22,000-foot single-headin

  • SAIMM
    Recovering Gold From Sand Dumps Using Gravity Concentration

    By Durell Denysschen, Rafael Abela

    The recovery of gold from old mine dumps has been carried out over the last two decades. The gold value and price together with recovery methods, determine whether it is economical to process a dump.

    Jan 1, 2006

  • CIM
    Automated Real-Time Elementary Analysis of Drill Dust using LIBS Technology

    By Karl Nienhaus

    The BGMR has developed a method for an online-analysis during drilling processes in cooperation with Fraunhofer Institute for Laser Technology in Aachen and various industrial partners. This allows fo

    Oct 1, 2009

  • AUSIMM
    Application of Self-Cleaning, Fluidised-Bed Slurry Heat Exchangers: Processing of Laterite Ore Slurries for the Extraction of Nickel and Cobalt in High-Pressure-Acid-Leach (HPAL) Plants

    By B Crossley

    Self-cleaning fluidised bed heat exchangers have demonstrated unparalleled performance internationally for the implementation of indirect heat transfer in severely fouling fluid environments. Recent a

    Jan 1, 2004

  • IMPC
    Scale-Up Methods of Dense Slurry Production by Propeller and Flow Technique Mixers

    By J. Faitli, I. Tarján

    One of the basic processes of process engineering is the production of dense suspensions. The major two equipment of this task are the periodically operating propeller mixer, and the continuously oper

    Jan 1, 2003

  • SAIMM
    A Comparison of Test Procedures for Estimating the Bond Ball Work Index on Zambian/DRC Copper–Cobalt Ores and Evaluation of Suitability for Use in Geometallurgical Studies

    By Elizma Ford, Vincent Sithole

    "Two shortened test procedures for estimating the Bond ball work index are compared for suitability of use on Zambian/DRC-type copper–cobalt ores. The first procedure is based on a batch milling test

    Jan 1, 2015

  • SME
    A study of total dynamic analysis method for deepseabed integrated mining system

    By Hyung-woo Kim, Sup Hong, Sung-Soo Kim, Chang-Ho Lee

    A deep-seabed integrated mining system, which consists of four subsystems such as riser pipe, buffer, flexible riser, and tracked vehicles, is presented in Figure 1. In order to collect more manganese

    Sep 1, 2014

  • SAIMM
    3.2 Lotz - Sampling For Cyanide In Metallurgical Processes

    By Peter W. Lotz

    Contents of: ?Sampling for Cyanide in Metallurgical Processes? ?Sampling at process level of operation ?Sampling at environmental level ?Sample stability and integrity issues ?each citing possi

    Jan 1, 2005

  • SAIMM
    Electrode Erosion In Submerged Arc Furnaces

    By J. A. Bakken, G. Sævarsdóttir, H. Pálsson, M. Þ. Jónsson

    The role of the electric arc in the consumption of electrodes in submerged arc furnaces has long been debated. The hostile environment in the furnace does not make direct measurement feasible, so simu

    Jan 1, 2007

  • NIOSH
    IC 6960 Sampling And Testing Of A Gold-Scheelite Placer Deposit In The Mojave Desert, Kern And San Bernardino Counties, Calif. ? Introduction

    By H. W. C. Prommel

    The increase in the price of gold in 1933 was the cause of starting many activities in gold prospecting and mining; it led to investigations of many of the so-called desert placers in the Southwest, w

    Jan 1, 1937

  • SAIMM
    Integrated Optimization Of Underground Mine Design And Scheduling

    By J. Little

    It is common practice for underground mine plans to be created sequentially, where results from one planning process form the input data for another. While this is practical for manual methods, comput

    Oct 1, 2013

  • DFI
    Compressive Behaviour of Hollow Core Micropiles in Cohesive Soil

    By M. Hesham El Naggar, Osama F. E. Drbe

    "Abstract: The use of micropiles has greatly increased the last twenty years, including applications involving low capacity micropile networks, seismic retrofitting, underpinning of existing foundatio

    Jan 1, 2014

  • SAIMM
    Morphological approach to volume calculation of complex 3D geological objects

    By D. R. Hack, N. M. Sirakov, M. L. Feves, M. Iwanowski

    This paper presents a new approach capable of volume calculation of 3D reconstructed geological objects. The method is based on a well-known concept that states the volume of an object can be computed

    Jan 1, 2003

  • NIOSH
    Using Major Hazard Risk Assessment to Appraise and Manage Escapeway Instability Issues: A Case Study

    By Stephen C. Tadolini, Gabriel S. Esterhuizen, Anthony T. Iannacchione

    A Major Hazard Risk Assessment (MHRA) was developed in Australia after a series of mine disasters in the 1990’s. A MHRA is used to help prevent major hazards, i.e. fire, explosion, wind-blast, outburs

  • SME
    Fires in vehicular tunnels

    By I. J. Duckworth

    Due to improved, stringent safety regulations, many modern road tunnels are statistically safer, per kilometer, than above ground roadways. However, the public perception and reaction in the event of

    Jan 1, 2009

  • DFI
    Ultimate Shaft Friction, Displacement Response and Set-Up for Axially Loaded Piles in Clay

    By Kjell Karlsrud

    "Abstract New semi-empirical design procedures for the determination of ultimate shaft friction and load-displacement response of axially loaded piles in clay are proposed. Hereunder also prediction o

    Jan 1, 2014

  • CIM
    Removal of Organic Carbon with a Jameson Cell at Red Dog Mine

    By Todd Smith, Brigitte Lacouture, Greg Anderson, David Lin

    "The lead and zinc flotation circuits at Red Dog Mine are preceded by a preflotation circuit which recovers naturally-floating organic carbon contained in the ore. Organic carbon is a potential contam

    Jan 1, 2008

  • SAIMM
    Foaminess Of Slag: Cause And Control

    By S. Pal, A. K. Lahiri

    Most of the compounds present in slag are surface active. This gives rise to foaminess of slag. The foam life and foaming index are normally determined by the draining rate of slag through the plateau

    Jan 1, 2004

  • AUSIMM
    Hydrometallurgy into the Next Millennium

    Hydrometallurgy has a history of over 300 years with copper leachingand cementation having been exploited in Spain as far back as 1670.Since then, hydrometallurgy has become an integral, expanding bra

    Jan 1, 2001