    Sensitivity Analysis for Optimum Open Pit Blasting

    By Kai Nielsen

    A model has been developed for sensitivity analysis of open pit bench blasting. The model simulates the cost effectiveness of various blasting designs in relation to the equipment used for drilling, l

    Jan 1, 1985

  • ISEE
    The Design, Implementation and Optimization of Casting Blasts in Strip Mining

    This paper describes experience in designing and implementing casting blasts over the past fifteen years. Important design parameters such as powder factor, burden and spacing, blast pattern geometry,

    Jan 1, 1995

  • ISEE
    Fish Mortality Study During Underwater Blasting Operations in Lake Erie Off Nanticoke, Ontario

    By A Lance McAnuff, Robert T. Booren

    Construction of a dock facility for the Lake Erie Development Project of Stelco Steel involved underwater blasting in commercial fishing waters near Port Dover, Ontario. The most stringent environment

    Jan 1, 1989

  • ISEE
    Blasting Techniques to Control Roof Failure in an Underground Limestone Mine

    By Mike Koehler

    An underground mine that produces aggregate limestone was in operation for approximately eight years when geological changes resulted in dangerous rock falls. The roof in the mine was not bolted; ther

    Jan 1, 2002

  • ISEE
    Numerical Modeling of the Effect of High Stresses on Blast Induced Damage

    By A. S. Tawadrous

    The stress field around a detonating charge in a borehole was calculated using AUTODYN for a variety of in-situ stress conditions. Calculations were conducted for zero in-situ stress, hydrostatic cond

    Jan 1, 2007

  • ISEE
    The Development and Testing of a New Mechanical Stemming Aid

    By Paul Worsey, Terry Nixon

    The development and testing of a simple mechanical stemming aid (Patents pending) resulting from a Joint venture by Incubator Technologies Inc. and the University of Missouri-Rolla and funded by the U

    Jan 1, 1988

  • ISEE
    Trends in Drilling and Blasting (8aa24a46-8326-4148-8007-63f421ba2d8b)

    By Alan Bauer

    During the past several years, the trend to large-diameter blastholes in both open pits and underground mines along with the continuing developments in slurried explosives and delay systems has kept t

    Jan 1, 1978

  • ISEE
    Borehole Deviation Study in a Long-Hole Stope

    By Paul Miller, Rene Laprade

    Does a 76 mm Ø hole drilled over 45 m deep remain straight? This is the question asked by the Engineering department at Placer Dome's Dome Mine in Timmins, Ontario before they could lay out the initia

    Jan 1, 1998

  • ISEE
    Environmental Effects of Marine Blasting in Canadian Game Rivers

    By A Lance McAnuff, Marcus V. van Bers, Andrew Curic

    During the summers of 1992 and 1993, blasting operations were carried out to effect the crossing of two of Canada's better known game rivers, the Nipigon and Winnipeg, in connection with the completio

    Jan 1, 1994

  • ISEE
    Preparation - The Key to a Good Legal Defense

    By G Alan Foster

    The presence of approximately 600,000 attorneys in the U.S.A. and the determination by the courts that blasting is considered an 'ultra hazardous' activity makes every practical blaster aware that at

    Jan 1, 1982

  • ISEE
    A Blast Design Analysis for Optimizing Productivity at INCO Limited's Thompson Open Pit

    By Nan H. Lee, Christopher J. Hunter, Stephen H. Chung

    Several factors affect the productivity of mining operations. The geological structure of a mineral deposit and the fragment size of blasted material are considered to be most influential. It is well

    Jan 1, 1991

  • ISEE
    Blast Optimization for Improved Dragline Productivity

    By Hike Humphreys, Geoff Baldwin

    A project aimed at blast optimisation for large open pit coal mines is utilising blast monitoring and analysis techniques, advanced dragline monitoring equipment, and blast simulation software, to ass

    Jan 1, 1994

  • ISEE
    Controlled Blasting at the Hanging Lake Tunnels

    By Gordon F. Revey

    Hanging Lake Joint Venture recently excavated two conventional 42 foot diameter highway tunnels in the difficult ground conditions of Glenwood Canyon, Colorado. This paper outlines the type and succes

    Jan 1, 1991

  • ISEE
    Complete Computer Simulation of Crater Blasting Including Fragmentation and Rock Motion (2000 International Society of Explosives Engineers)

    By Dale S. Preece, Lee M. Taylor

    Computer simulation of the physics involved in conventional rock blasting can be split into two phases; transient stress wave propagation and rock motion. Because the two phases involve totally differ

    Jan 1, 1989

  • ISEE
    Blasting with a Light Touch; Florida State Project 12014-3501 Fort Myers, Florida (307cb8ee-5b0c-48e5-806c-57d316a0ab82)

    By Doug Wathen, Philip M. E Thomas

    The City of Fort Myers needed to replace a 40-year old 42-inch storm sewer line in downtown Fort Myers with a new 54-inch line to accommodate population growth. The old line had to be kept operational

    Jan 1, 1996

  • ISEE
    Recent Developments in the Application of Hercudet to Surface Mining, Quarrying, and Coal Stripping

    By Robert B. Hopler

    The Hercudet™ non-electric delay blasting cap system has exhibited outstanding performance and economic results in surface work. The versatility inherent in the system, which allows the combining of t

    Jan 1, 1978

  • ISEE
    Contour Blasting in Tunneling: the Role of Drilling Precision

    By Mauro Fornaro, Marilena Cardu, Renato Mancini, Daniele Castano

    Tunneling by explosive blasting in civil works isn't merely intended to break somehow a way through the rock, rather to drive a permanent, constant cross section, lined way. The current mechanical exc

    Jan 1, 1992

  • ISEE
    Large Diameter Presplitting Improved Through Two Novel Techniques

    By GF Brent, Armstrong L. W

    It is recognised that presplitting is a special case in blasting which requires the reduction of conventional explosive pressures in order to avoid excessive rock damage. Two routes to achieving this

    Jan 1, 1998

  • ISEE
    Multi-Blasthole, Multi-Row, Detonation Delay timing Simulation of Rock Blasting Using DMCBLAST_3D

    By Dale Preece, Stephen Chung

    Development of DMCBLAST-3D is continuing and now includes the capability to simulate the detonation of multiple blastholes in multiple rows that make up a conventional bench blast, either in a rock qu

    Jan 1, 2002

  • ISEE
    Flyrock Range & Fragment Size Prediction

    By Cameron McKenzie

    Flyrock is a complex issue involving interaction between the charging crew, the blast design, and the local geology, and once conditions on the shot meet certain criteria, the probability of a flyrock