Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Ground control monitoring at the Ruttan Mine

    By P. S. Daly

    "The purpose of this paper is to describe the types of instrumentation used at Sherritt Gordon's Ruttan Mine to monitor the"" effects of mining. The aim of the monitoring program is to establish

    Jan 1, 1981

  • CIM
    Supply and Demand, Technological Development, and Future Prospect of Copper in Asia

    By M. Okada

    Consumption of refined copper in Asia, especially in China and India, has soared, and the copper price is at its historic height. New smelters and refineries have been built in the region with state-o

    Jan 1, 2007

  • CIM
    Underground Booster Fan Placement Strategies

    By Euler De Souza, Kyle Penner

    "Booster fans play an important role in assisting main fans by boosting the air pressure of the ventilation air passing through it. The correct placement of underground booster fans in a mine is a cri

    Jan 1, 2019

  • CIM
    Geotechnical Challenges At The Beal Mountain Mine, MT

    By David Stone

    The Beal Mountain Mine near Anaconda, MT is an interesting case history of a mine that has continued operations despite several large pit wall failures over a period of about 10 years. The largest eve

    May 1, 2001

  • CIM
    Geology of the Sustut Copper Deposit In B.C.

    By G. Harper

    The Sustut Copper deposit, 230 miles northwest of Prince George, B.C., was discovered in August of 1971. Subsequent exploration has included 56,417 feet of surface diamond drilling in 139 holes. The d

    Jan 1, 1977

  • CIM
    Chapter III-Continued - Part 8.- Matachewan-Kirkland Lake-Larder Lake Area Regional Structure of the Kirkland Lake-Larder Lake Area

    By Jas. E. Thomson

    "The Kirkland Lake-Larder Lake gold area is in northeastern Ontario and is a continuation of the ore-bearing belt that extends across northwestern Quebec through the Rouyn, Cadillac, Malartic, and Bou

    Jan 1, 1954

  • CIM
    Tectonic Framework of Palaeozoic Formations in Manitoba

    By H. R. McCabe

    "The study of a detailed series of structure and isopach maps of the Palaeozoic strata of southwestern Manitoba indicates that the principal Palaeozoic tectonic elements -the Williston Basin and Elk P

    Jan 1, 1967

  • CIM
    Rock Mass Instability Associated with the Formation of Regional Geological Structures along the Bushveld Complex as Encountered during the Extraction of the UG2 Chromitite Layer at Lonmin PLC

    By M. du Plessis, G. More O’Ferrall, A. Hartzenberg

    "Lonmin Platinum has experienced several cases of large-scale hangingwall instabilities during the extraction of the Upper Group 2 Chromitite Layer (UG2) at a number of the Marikana operations along t

    Jan 1, 2015

  • CIM
    Intelligent P&IDs, their creation and use in process hazard analysis of refineries and chemical plants

    By T. D. Traubert, J. T. Dietz, D. Catena

    "Canadian process industry experts have often observed the strong trend for U.S. industrial safety and environmental laws to creep across the border. These experts will be interested in new United Sta

    Jan 1, 1993

  • CIM
    Wollastonite in eastern Ontario

    By A. MacKinnon, P. W. Kingston, W. F. Caley

    "Wollastonite (CaSiO3]) is experiencing increased usage in a variety of applications, such as fillers in paints, plastics and resins, as an extender to replace both non-fibrous and fibrous materials (

    Jan 1, 1989

  • CIM
    Nickel Recovery from Metallurgical Slags

    By S. C. Livanou, S. P. Tampouris, E. N. Zevgolis

    In ferronickel (Fe-Ni) production from oxidized nickeliferous ores, mechanical losses of ferronickel in the slag are reduced by magnetic separation. Slag from the electric furnaces (E/Fs) contains 0.1

    Jan 1, 2005

  • CIM
    Recent Developments in Electric Arc Furnace Technology

    By E. R. Landry

    This paper reviews the current state of electric furnace technology, with emphasis on some of the more recent developments. A large section of the paper is devoted to the use of increasingly high powe

    Jan 1, 1967

  • CIM
    Comparison of Low vs High Discharge For Ball-Mills (Transactions, Volume XL, 1937, pp. 325-332)

    By The Hollinger Mill Staff

    MR. E. L. Longmore (l), in presenting this paper at the Annual General Meeting, suggested that it was neither desirable nor necessary to read any but the briefest portion of the paper. He wished to em

    Jan 1, 1937

  • CIM
    The Role of Nuclear Power in Canada

    By W. J. Bennett

    WHEN Dr. Horace Fraser, your President, invited me to speak to you today I advised him in confidence that I was leaving my present positions on April 30th. In the circumstances it seemed to me that th

    Jan 1, 1958

  • CIM
    Concrete Reinforcement Modeling for Efficient Information Sharing

    By S. Aram

    Concrete reinforcing requires coordination among many roles: structural engineer, estimator, detailer, fabricator, installer and others. The methods used to define and represent concrete reinforcement

    Aug 1, 2013

  • CIM
    Geostatistical ore reserve estimation at the Lac Knife graphite deposit, Esmanville Township, Quebec

    By Marc Lavigne

    "The Lac Knife graphite deposit was estimated, as part of a feasibility study, using a geostatistical ore reserve estimation method: ordinary kriging. Based on the geology and its interpretation, the

    Jan 1, 1991

  • CIM
    Creep Response of the AE44 Alloy at 125 and 150°C

    By S. Spigarelli

    The creep response of the AE44 magnesium alloy was studied by means of constant load creep tests carried out at 125 and 150°C, obtaining that at the latter temperature the minimum creep rate observed

    Jan 1, 2006

  • CIM
    Improving Densification of Fine Coal Refuse Slurries to Eliminate Slurry Ponds

    By Frank Baczek, R. Q. Honaker, D. P. Patil, B. K. Parekh

    Fine refuse slurry impoundment is a requirement for the coal industry to dispose the fines. Impoundment maintenance is an on going problem for the coal industry and its breakage creates environmental

    Jan 1, 2004

  • CIM
    Surface Quality of 7075-T6 Aluminum Alloy Machined Using High-Speed Milling Process

    By R. Kamguem

    The surface of a mechanical part plays an important role in determining performance in service. The presence of scratches left by the cutting or tearing of the material on the surface of the workpiece

    Jan 1, 2011

  • CIM
    Metallurgical Research in Canada: A Symposium

    "ALTHOUGH Canadian metallurgists have long been active in research, the scope of the work was somewhat limited until the be-ginning -of World War II. The rapid industrial development of Canada during

    Jan 1, 1952