    An Investigation Into The Use Of Pyrrhotite As A Cementing Agent For Backfill

    Pyrrhotite is pyrophoric when in a finely divided form. The problems of disposing of large quantities of finely divided pyrrhotite separated out by metallurgical processing from ore are formidable

    Jan 1, 1973

  • AUSIMM
    The selection, commissioning, and evaluation of a large diameter, variable speed ball mill at Bougainville Copper Limited

    By Clark G

    The latest addition to the grinding circuit at Bougainville Copper Limited is another 5.5m by 7.3m primary mill (No.13). The mill can operate in a primary or secondary mode. Its distinguishing fea

    Jan 1, 1986

  • AUSIMM
    The Use of a Range of Compact Diesels for Original and Re-Engining Applications

    This paper reviews the use of MTU diesel engines in uses such as Off-Highway Vehicles, Rail traction, Generating Sets, Marine Propulsion and Defence Applications, and focuses on a central theme of

    Jan 1, 1986

  • AUSIMM
    The Causes of Heavy Mineral Loss From Mineral Sands Wet Concentrators

    By Alford R. A

    The causes of the loss of heavy mineral from mineral sands wet concentrators were identified through detailed surveys of two such concentrators. It was found that tray and spiral sluices preferentiall

    Jan 1, 1991

  • AUSIMM
    Computer Program for Planning of Mine-Ventilation Systems

    Today the application of computer programs for planning of mine-ventilation and for safety- analysis of ventilation systems is widespread practice in German mining. The computer program for network c

    Jan 1, 1983

  • AUSIMM
    Geometallurgy - Tricks, Traps andáTreasures

    By G Harbort, C Sola

    The rapid development of geometallurgy in the mining industry has occurred in relatively recent times. Its importance as an independent discipline in the mineral processing world has been emphasised a

    Oct 29, 2012

  • AUSIMM
    Technical note-a laboratory scale rotary kiln simulator

    By Field R. V, Graieg O, George T. J

    The design, construction and operation ofa laboratory scale rotary pot kiln are outlined. Charges ofup to 3 kg can be heated to temperatures up to 1200°C in a controlled atmosphere. Some examples

    Jan 1, 1986

  • AUSIMM
    Overall Concepts in Drilling for Roof Bolting

    By Tonegato S, Wood M

    The lack of objective data on roof bolting machines, bits, rods and overall system has created the need for an objective assessment of roof bolting. This work outlines a test rig for such objectiv

    Jan 1, 1986

  • AUSIMM
    Combustion of Chalcopyrite Pyrite, Galena and Sphalerite Under Simulated Suspension Smelting Conditions

    A laminar-flow furnace was used to study the combustion of four flotation concentrates (chalcopyrite, pyrite, galena, and sphalerite) in air at temperatures up to 1400¦C. A special- Iv developed tw

    Jan 1, 1980

  • AUSIMM
    The Perseverance Gold Deposit ù The Next Step at Peak

    By R Berthelsen

    The Peak Gold Mines Pty Ltd (PGM) operations are located approximately 9 km south of Cobar, NSW. PGM currently mines and treats ore from three separate orebodies within 5 km of the original plant. Pro

    Jan 1, 2004

  • AUSIMM
    Selective Mining at Ok Tedi - Past, Present and Future

    Selective open pit mining for gold has been in progress at Harbour Lights since the onset of mining in March 1985. Selective mining techniques used are similar to those in other recently opened gold m

    Jan 1, 1986

  • AUSIMM
    A Study on Application of Comprehesive Rock Mechanical Properties and Geological Characteristics in Coal Mines

    By Yongjin S

    Datong coal Mine suffers from delays and sudden caving of its massive competent conglomerate roof. Detailed geological studies of the nature of pebbles and matrix of the conglomerate and its sparse

    Jan 1, 1992

  • AUSIMM
    Underground Infrastructure Requirements for Underground Cave Mining Operations

    By A G. L Pratt, G F. Dunstan, A Leonforte

    The selection of the material sizing and mine dewatering systems are important elements in the development of a large-scale, high tonnage (greater than 4 Mt/a) underground hard rock mine. The sizing s

    Jan 1, 2008

  • AUSIMM
    Rapid Sealing with Parachute Stoppings

    By Buizen M, Eagleton A. C

    The results of calibration trials conducted on parachute stoppings both overseas and in Australia under a recently completed NERD&DC grant, are presented. Applications of parachute stoppings, for

    Jan 1, 1988

  • AUSIMM
    HellyerÆs Exploration Development

    By Viney K. G, Molinia A. B

    The Hellyer Pb-Zn-Ag orebody in western Tasmania was discovered in 1983, and mine production at a rate of 250 000 tonnes/yr commenced in 1987. Expansion to 1 million/yr will be completed by early

    Jan 1, 1988

  • AUSIMM
    Development of Lancefield Panel Stoping

    A combination of highly structured, fissile stope hangingwalls and high ground stresses have caused difficult mining conditions in the Main Lode Deeps at Lancefield Gold Mine. Cyclic reviews of grou

    Jan 1, 1995

  • AUSIMM
    Geochemical Ore Guides and Techniques in Exploration for Tin

    Geochemical data on Australian granites and pegmatites9 and the.,mineral.components of these rocks, is presented and compared with that obtained in similar studies in.the U.S.òS.R and:.elsewhere.The p

    Jan 1, 1963

  • AUSIMM
    Plant Trial of an Under-belt Capacitance and Gamma-Ray Backscatter Gauge for on-Belt Determination of Moisture in Coal

    A non-contacting under-belt capacitance and gamma-ray backscatter technique has been developed for the on-line measurement of moisture in coal. In this technique, moisture was correlated with radio fr

    Jan 1, 1989

  • AUSIMM
    Evaluation of Techniques of Pillar Extraction in Thick Coal Seams and Possible Developments in India

    Traditional techniques for extracting pillars in thick underground coal seams in India are reviewed. Problems encountered are principally control of roof strata and low recovery. Recently develope

    Jan 1, 1986

  • AUSIMM
    Electrification and use of Electric Hydraulic Equipment at Mount Lyell

    In 1972, with the West Lyell Open Pit winding down, mining operations transferred underground. All development tunnelling until the end of the decade was carried out by a fleet of ten pneumatic Jumbos

    Jan 1, 1985