Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Study of Soil Media with Multiple Tunnels or Cavities Using the Boundary Element TechniqueBy Dif A. E N, Abdalla MH
The effect of multiple tunnels /cavities on the stress and deformation field of the soil media was investigated by using a two dimen- sional plane strain boundary element model. The soil was conside
Jan 1, 1987
-
Using technology to support best practice for tailings storage facilities (TSF) management, governance and disclosureBy H Arvidson, A Walker, N Pollock
Following the recent tailings tragedy in Brumadinho, the Investor Mining and Tailings Safety Initiative was formed representing institutional investors in the mining industry. This Initiative, led by
Jul 1, 2021
-
The Status of Mine Water Pollution in South AfricaThis paper presents an overview of the current status of mine water management in South Africa. The regulatory framework within which mine water management operates is set out, based on the principles
Jan 1, 2003
-
New Insights into the Formation, Structural Development and Preservation of Iron Ore Deposits in the Northern Cape Province, South AfricaBy D J. Alchin
Most of South AfricaÆs high-grade iron ore resources are hosted within a fault-controlled structural basin in rocks of the Palaeoproterozoic Transvaal Supergroup in the Northern Cape Province of South
Jan 1, 2007
-
Grade Control Review at Boddington Gold Mine, SW Region, WAThe Boddington Gold Mine orebody is a large tonnage, low grade gold deposit located within the Archaean Saddleback greenstone belt within the south-western region of Western Australia. The orebody con
Jan 1, 1993
-
Application of Different Drive Systems for Horizontal MillsBy M Neurohr, B Wacker, D Mensing, C Murphy, W Kitz
Mining operations have large power requirements. The biggest consumers of energy are the drives for the mills located in the concentrators. Assuming that the decision is made on how many mills are nee
Jul 13, 2015
-
Discovery of the Corunna Downs DepositsBy P J. Howard, P Darvall, J H. Mainwaring
In less than a year, Atlas Iron’s Corunna Downs Project has moved from a new discovery to a substantial resource of high quality in an underexplored greenstone belt. Located approximately 170 km south
Jul 13, 2015
-
Getting it right from the beginning – ESG in mineral explorationBy L H. G McClean
Environmental, social and governance (ESG) factors have always been important to the minerals industry and is now considered one of our most important opportunities (and risks). Getting it right from
Sep 1, 2024
-
The Impact of Pile Loading on Adjacent Metro Tunnels – Barangaroo South, AustraliaBy P K. Wong, D A. F Oliveira, F M. Azad
In situations where foundation piles are located in proximity to existing or future tunnels, it is typical for the tunnel owner to require that sleeving of the piles be carried out to at least the inv
Sep 17, 2014
-
Ventilation of Single Entry Developments at Ellalong CollieryBy Wallman D
Since 1981 two single entry roadways have been driven at Ellalong Colliery for a total distance of 1 030 metres. They were driven at a height of 1.73 metres within the 3.7 metres thick Greta Seam
Jan 1, 1983
-
Tailing Thickener Operability and Control Improvements at ProminentáHillBy J Lombardi, M Weidenbach
"OZ MineralsÆ Prominent Hill copper-gold concentrator is located 650 km north-east of Adelaide, 130 km north-east of BHP BillitonÆs Olympic Dam operation and 130 km south-east of the regional township
Oct 29, 2012
-
Uralite Dolerite Dykes in Relation to the Broken Hill LodeBy Edwards A. B
Re-opening of the old Proprietary mine has provided new exposures of the system of uralite dolerite dykes observed in 19110 by the Geological Sub-Committee of the Scientific Society of Broken Hill. Th
Jan 1, 1956
-
Estimation of Regional Stress State and Young’s Modulus of Ground at Torigatayama Limestone Mine in JapanBy D Fukuda, K Kaneko, R Kudo, J Kodama, Y Fujii, T Sasaki
"Estimation of stress state as well as elastic modulus is important for the prediction of a rock slope deformation in an open pit mine since it can strongly influence the mining-induced deformation of
Nov 5, 2014
-
Design of Medium Recovery and Heavy Medium Management Circuits- A Different ApproachThe paper describes the design of the dilute medium and medium recovery circuits installed at the coal preparation plants at the Cornwall Coal Company's Fingal Mine, and the BP Coal Australia
Jan 1, 1987
-
Outburst Experience at Tower CollieryBy Doyle R
Underground operations commenced at Tower Colliery in late 1978 and the early prevailing mining conditions in the worked seam were considered poor as a result of high stress and geological disturb
Jan 1, 1986
-
Regional Geological Setting of the Woodlawn and Captains Flat Massive Sulphide Deposits, NSW, AustraliaBy Abell RS, Wyborn D, Solomon M, Stuart-Smith PG, Henderson GAM
The two major massive sulphide deposits in the Silurian rocks of southern NSW, Captains Flat and Woodlawn, differ from classical Kuroko deposits in several ways, e.g. they lie on the flanks of fe
Jan 1, 1987
-
Elasto-Plastic Finite Element Structural Stability Analysis of Room and Pillar Mine WorkingsBy Porter I, Singh RN
An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine struc
Jan 1, 1992
-
A Laboratory Study of Gold Recovery from a Low-grade Tailings DumpA sample of tailings from a local, low grade (less than 2g/t) tailings dump was investigated for gold recovery. The tailings were very fine, with 90 per cent passing 30¦m and almost 60 per cent pass
Jan 1, 1991
-
Embedding Geometallurgy into Mine Planning Practices – Practical Examples at Olympic DamBy H Bruyn, K Ehrig, V Liebezeit, A Robertson, M Smith, D Grant
"The Olympic Dam geometallurgy program has generated a large quantity of data that has been used to create a geometallurgically enabled block model. An ongoing challenge is to convert data into usable
Jun 15, 2016
-
Impact testing of raise bore protection meshBy M Doran
The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3
Mar 29, 2023