Search Documents

  • DFI
    An Unusual Permanent Shoring Job

    By Gordon Demetrick

    3900 Yonge St. was not a typical site on which to build a condominium apartment. A steep hill covered the majority of the site. In order to use as much of this site as possible, the rear of the buildi

    Jan 1, 1987

  • SME
    Engineering Geology Of The Mica Underground Powerplant

    By Douglas D. Campbell, Alan S. Imrie

    INTRODUCTION Mica Dam is located on the Columbia River just downstream of the "big bend" of the Columbia, where it leaves the Rocky Mountain Trench and begins to flow southwards, approximately 85 m

    Jan 1, 1976

  • SME
    A New Computer Program For The Design Of Ventilation Emergency Plans ? Introduction

    By Rudolf E. Greuer

    It is undisputed that an interaction between mine fires and mine ventilation systems exists. The ventilation carries the poisonous and sometimes explosive combustion products, which constitute the gre

    Jan 1, 1980

  • NIOSH
    OFR-55-82 Design And Testing Of Joining Sleeves For Trailing Cable Ground And Pilot Wires

    By Walter Frank

    The purpose of the work covered by this contract is to develop a ground and pilot conductor connector which will significantly improve mine trailing cable splice performance. This work compliments the

    Jan 1, 1979

  • SME
    Technical Note - Mine modifications for economic survival —a case study

    By R. L. Grayson, G. Mishra

    Introduction Many old underground mines have been developed extensively into reserves requiring large numbers of workers to maintain and rehabilitate lengthy track haulages and/or belt conveyor sys

    Jan 3, 1987

  • NIOSH
    A Computer Software Program That Estimates Air Quantity Requirements In Large Opening Stone Mines

    By R. H. Grau, S. B. Robertson, J. Dolgos, T. P. Mucho

    The National Institute for Occupational Safety and Health (NIOSH) has developed a computer program called the Air Quantity Estimator (AQE). The purpose of the program is to provide a starting point fo

  • TMS
    New Casting Moulds For Anode Copper

    By Torben Edens

    Norddeutsche Affinerie?s (NA?s) primary smelter continually increased production in the past decade. The smelter?s concentrate capacity was expanded from 500,000 in 1993 to 1,000,000 t/a dry concentra

    Jan 1, 2005

  • AUSIMM
    The Effects of Environment on Bacterial Leaching Rates

    Further evidence is presented as to the widespread occurrence of Thiobacillus ferrooxidans in nature in association with sulphide minerals. Leaching rates are discussed in terms of the effect of envir

    Jan 1, 1968

  • SME
    Using Optimizing Control System At CVRD’s Pelletizing Plants

    By Magno Rodrigues Ribeiro, Alexandre Cabral Stelzer, Cacio José da Silva, Leonardo Nogueira Ferri, Marcelo Ciminelli Mendes, Christophe Bouché, Marco Aurélio Soares Martins, Evenilson Soprani Lopes, José Xavier da Silva Filho, Sérgio Luiz Dalvi

    Since 2001, CVRD is carrying out a modernization project in it’s pelletizing plant’s automation systems, that comprehends instrumentation, control and information systems. In addition, the project in

    Jan 1, 2005

  • SME-ICGCM
    Detailed Stress Analysis of Longwall Panels

    By Khaled Morsy

    In the past two decades, high horizontal stress has been attributed to many ground control failures. Most believe that entries parallel to the high horizontal stress is most stable and least stable wh

    Jan 1, 2006

  • AIME
    Endowment Funds (6843629e-f733-45af-884f-0648055957a6)

    The income of the Institute is derived mainly from dues, advertising in MINING AND METALLURGY and sale of publications. These sources are fortunately supplemented by the interest from invested funds n

    Jan 1, 1939

  • NIOSH
    IC 9371 Aluminum Availability And Supply - A Minerals Availability Appraisal

    By David R. Wilburn

    The U.S. Bureau of Mines investigated the resources, costs, capacities, market relationships, and short-and long-term supply of bauxite, alumina, and aluminum. The 45 evaluated mines and deposits in 1

    Jan 1, 1993

  • SME
    The Green Precipitate Process For Remediation Of Acid Mine Drainage

    By C. Restarick, R. G. Robins, R. M. Taylor, I. Ennis

    Lime addition to acid mine drainage waters (AMD), possibly accompanied by aeration, has been the basis for their remediation by precipitation of predominantly metal hydroxides. An efficient novel alt

    Jan 1, 2000

  • NIOSH
    IC 9183 Mine Drainage And Surface Mine Reclamation - Proceedings Of A Conference Sponsored By The American Society For Surface Mining And Reclamation, The Bureau Of Mines, And The Office of Surface Mining Reclamation And Enforcement.

    Mine waste and mine reclamation are topics of major interest to the mining industry, the government and the general public. This publication and its companion volume are the proceedings of a conferenc

    Jan 1, 1988

  • SAIMM
    Risk Assessment: An Opportunity To Change Health And Safety Performance

    By P. J. Foster

    A common theme running through recently introduced mining health and safety legislation in many parts of the world is risk assessment. Most recently, risk assessment legislation has been introduced ac

    Jan 1, 1998

  • SME-ICGCM
    An Overview Of The National Roof Evaluation Accident Prevention (REAP) Program

    By J. M. Krese

    This paper gives an overview of the National REAP program emphasizing the program's current status and future plans. A brief historical review of the program will be given containing roof-fall ac

    Jan 1, 1988

  • NIOSH
    MLA 25-81 - Mineral Resources Of The Fisher Gulch Rare II Area (No. A5299), Trinity County, California ? Summary

    By Eric E. Cather

    A mineral survey of the Fisher Gulch RARE II area (A5299), Trinity County, California was conducted by the U.S. Bureau of Mines and U.S. Geological Survey. The Bureau of Mines was responsible for deta

    Jan 1, 1981

  • SME
    Project and Mining Geology

    By Donald A. Ranta

    Every mineral project or mine is based on a geologic entity-an ore (mineral) deposit. A well-defined mineral deposit and its associated geologic characteristics are the only aspects of a project that

    Jan 1, 2008

  • DFI
    Underpinning Of Buildings During Tunneling Los Angeles Metro Rail System - Synopsis

    By John A. Dal Pino

    This paper describes two independent building underpinning projects during the construction of the Los Angeles Metro Rail System. The first project involves pinpile underpinning of a building along th

    Jan 1, 1996

  • CIM
    Deep Bed Thickener Operation at the EKATITM Diamond Mine

    By T. G. Paradis, C. A. Mohns

    "This paper summarizes the Wren CAT (Clarifier and Accelerated Thickener) deep bed thickener operation at the EKATITM Diamond Mine in Canada’s Northwest Territories. EKATITMs’ thickener project is pre

    Jan 1, 2000