Search Documents

  • ABM
    Influência Das Matérias-primas Ferrosas Na Operação Dos Altos Fornos Da Tkcsa

    By André Wulff Hirano

    A operação estável de um Alto Forno com alta produtividade e baixo consumo de combustíveis, dependente significantemente das matérias-primas ferrosas utilizadas. Diante do cenário cada vez mais desafi

    Aug 17, 2017

  • RMCMI
    Sessions on Safety

    PRESIDENT HERRES: Our ses¬sions this afternoon will be on safety. They will be under the direction of Mr. Dan Harrington, who has come here from Washington, D. C., particularly to preside at these mee

    Jan 1, 1929

  • SME
    Environmental Mediation: Resolution Of A Site-Specific Dispute With Area-Wide Policy Implications

    By Verne Huser

    The intensity of environmental conflict, the delays and legal battles that have marked the 1970's suggest the need for additional processes to resolve environmental disputes. Our present means fr

    Jan 1, 1979

  • ISEE
    Plug Blast for a Powerhouse Intake Using an Unusual Technique

    By Terry Matts, Bruce Ripley, Clark Fletcher, Paul Rapp, Stan Holtby, Jim Dent

    The Stave Falls Project of BC Hydro, situated 65km east of Vancouver, BC, Canada, involved the construction of a new two-unit 9OMW hydro-electric facility to replace an existing powerhouse. The final

    Jan 1, 2000

  • CIM
    Advanced Thermodynamic Modeling in the Pyrometallurgy – Refractory Corrosion Simulations

    By C. Pichler, S. Luidold, C. Wagner, C. Sagadin, D. Kreuzer

    Engineers and scientists have been combating the attack upon refractory materials of molten metals/matte and slags for hundreds of years. The details in many cases are still questionable or at least d

    Jan 1, 2019

  • AUSIMM
    The Preparation and Consolidation of Tantalum Powder

    Following the preparation of tantalum oxide and carbide (1) an investigation of the details relating to the production of tantalum metal powder was planned. From the literature (2) it was evident that

    Jan 1, 1946

  • AIME
    Drainage In The Red Iron Ore Mines Of The Birmingham District; Alabama

    By W. R. Crane

    DRAINAGE in these mines has been discussed in papers, on mining practice,1 but the fact that water, varying from 0.16 to 3.46 and averaging 1.43 times the amount of ore mined, has to be pumped from th

    Jan 1, 1927

  • AIME
    Permeability As A Function Of The Size Parameters Of Unconsolidated Sand

    By G. D. Monk, W. C. Krumbein

    THE relation between permeability and the size parameters of unconsolidated sand is approached by considering sands as logarithmic frequency distributions having the basic parameters mean size and sta

    Jan 1, 1942

  • AIME
    Metallurgy of Copper

    By Archer E., Wheeler

    Producing copper companies were active during 1941 owing to the national defense program the United States and the requirements of the friendly belligerent nation. This activity extended to the Americ

    Jan 1, 1942

  • SME
    Computer Simulations for Optimal Gold Process Design

    By John T. Bartlett

    During the last decade, the increasing price of gold has renewed interest in the various metallurgical techniques for recovering precious metals. Much of the recent technology advance has been aimed a

    Jan 1, 1987

  • AIME
    The Forrester Cell Installation At The Nevada Consolidated Copper Co.'s McGill Concentrator

    By E. H. Mohr

    AT the McGill concentrator of the Nevada Consolidated Copper Co., all flotation operations have been carried out in Forrester cells since November, 1926. In respect to cost of operation, the new cell

    Jan 1, 1928

  • CIM
    MacIsaac's Mining and Milling Project at Inco Limited's Shebandowan Mine

    By E. J. Marcotte

    "INCO LIMITED'S Shebandowan Mine and Mill is located in a scenic tourist and cottage area near the western tip of Lower Shebandowan Lake, approximately 90 Km west of Thunder Bay, Ontario. This nicely

    Jan 1, 1992

  • CIM
    Design and selection of equipment for deep underground mine pumping systems

    By M. J. Davie, D. S. Ross

    "The successful design of a new mine water pumping system is in part dependent upon the accuracy with which the operating conditions can be forecast. This paper outlines the data which should be obtai

    Jan 1, 1980

  • SME
    The Cost Advantages Of Electric Sorting Of Native Copper Ores

    By Clifford W. Schultz

    Four native copper ores, two conglomerate and two amygdaloidal, were tested to determine their amenability to sorting. One of them, a conglomerate ore from the Kingston mine, showed a high sortability

    Jan 1, 1975

  • TMS
    Recovery of Nickel-Cobalt Alloy from Superalloy Scrap

    By J. L. Holman

    The Bureau of Mines is investigating recovery of Ni, Co, Cr, and other metals from mixed contaminated supera110y scrap. The scrap is melt-refined and cast into anodes for electrodeposition of recyclab

    Jan 1, 1987

  • AUSIMM
    Physical Aspects of Fine Particle Flotation

    In the flotation of fine particles, problems arise which do not occur with coarse-ground pulps. For example, the presence of colloidal or near-colloid- al gangue particles gives rise to ex- cessive

    Jan 1, 1984

  • TMS
    An Electrochemical Study of the Oxidation of Arsenopyrite in Acidic Media

    By Z. M. Zheng

    Cyclic voltammetry, potential step, and ac impedance techniques were applied to study the electrochemical reaction of arsenopyrite in chloride solutions. The relationship between anodic current densit

    Jan 1, 1995

  • SME
    Recent Technological Breakthroughs In Phosphate Processing

    By P. Zhang

    This paper gives a review of promising technologies for phosphate processing, and covers flotation, analysis and process control, as well as tailings treatment and utilization. Air bubbles of less tha

    Feb 1, 2012

  • TMS
    Semi-Stochastic Multi-Objective Optimization Of Chemical Composition Of High Temperature Austenitic Steels For Desired Mechanical Properties (60bafe83-7df1-4e2c-bb02-34599cf20e7d)

    By George S. Dulikravich

    An advanced semi-stochastic algorithm for constrained multi-objective optimization has been adapted and combined with experimental testing and verification to determine optimum concentrations of aJ10y

    Jan 1, 2003

  • SME
    Self-Scrubbing Coal: An Integrated Approach To Clean Air

    By R. L. Godfrey

    The Custom Coals advanced coal cleaning plant will be designed with a unique blending of existing and new processes to produce two types of compliance coals: Carefree Coal? and Self-Scrubbing Coal?. C

    Jan 1, 1995