RI 3480 Progress Reports - Metallurgical Division - 34. Annual Report Of The Metallurgical Division, Fiscal Year 1939 ? IntroductionBy R. S. Dean
[During the past fiscal year the Metallurgical Division has made important contributions along the lines dictated by the Bureau policy of conservation of domestic mineral resources through Its inve
Jan 1, 1940
-
Shaft Excavation Using the Borehole Rising MethodThis paper describes the excavation of No. 1 Power Station Lift Shaft at the Kiewa Hydro-Electric Project. The advantages and limitations of the borehole method are outlined, and general principles of
Jan 1, 1959
-
Small scale laboratory experiments of boulders bouncing on granular slopesBy V. Labiouse, B. Heidenreich
The rebound phenomenon, which occurs during rockfalls when a rock block impacts with a slope surface, is influenced by several parameters related not only to the slope material but also to the block a
Jan 1, 2003
-
IC 6400 Work of the Safety Division of the US Bureau of Mines Fiscal Year 1930By D. Harrington
"One of the underlying reasons for the establishment of the United States Bureau of Mines was the desire to promote greater safety in the mining and allied industries. Safety continues to be an import
Nov 1, 1930
-
Effect of Refractive Index on the Determination of Layer Thickness of 4H-SiC Homo-Epitaxial FilmsBy Zhiyun Li
Room temperature infrared reflection spectra of 2 n-type homo-epitaxial epifilms have been measured in the work. The effect of the refractive index on the determination of layer thickness using tradit
Jan 1, 2010
-
Preliminary Proposal for Mining of the Rapahoe Block û Greymouth CoalfieldThe Greymouth Coal field is situated on the West Coast of New Zealand's South Island and has been mined for coal for more than 120 years. The area covered in this paper is within the Rapahoe Sect
Jan 1, 1989
-
Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case HistoryBy Gregory A. Stephan
A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is
Jan 1, 2003
-
Versatility Of Roadheaders In Tunnel Construction (ebc2de43-3655-45e1-b3ea-308db1d22132)By D. Kwietnewski
With all of the unknowns associated with tunnel construction, how does a contractor choose a roadheader? This paper presents a review of several models of roadheaders being used in today?s tunnel pro
Jan 1, 2011
-
Deformability analysis of infinite jointed rock mass by the RCODBy K. Sugawara, Y. Hirakawa, A. Sato
The rock mass properties such as deformability and permeability are highly dependent on the existence of cracks. The Ratio of Crack Opening Dependency (RCOD) was proposed as a new index to evaluate th
Jan 1, 2003
-
Numerical Analyses Of Stability Of Three-Way And Four-Way Coal Mine Intersections In IllinoisRoof falls in coal mines typically occur in or around intersections and this has not changed in the last two decades. This research develops an improved scientific understanding of stress distribution
Feb 27, 2013
-
RI 2669 Status of Research in Ore DressingBy Ernest A. Hersam
"INTRODUCTION.Luring the year 1923 a complete survey was made of the condition of research in the reduction (milling) and concentration of ores and nonmetallic minerals - that is, up to the stage wher
Mar 1, 1925
-
New Design Of High Quality Cast Iron Tubbings For Tunnels And ShaftsBy Joachim Klein, Frank Reimann
Nodular-graphite cast iron (GGG) is a material similar to steel, and one which exhibits excellent properties, in particular for components exposed to pressure. GGG cast iron has been used in many case
Jan 1, 1987
-
Pit Water Management in a Mine Planning Cycle, Olympic Dam Case StudyBy D Barclay, S Mercer, S Wright
Mine water management is often an afterthought in mine planning processes and can introduce significant risks to projects when studied as a stand alone component at a later stage in the mine design. I
Jan 1, 2009
-
Practices And Design For Extending The Hearth Life In The Mittal Steel Company Blast FurnacesBy W. Carter, P. Chaubal, K. Spaleck, M. Schoeman, J. Bobek, W. Seegers
Keywords: Pyrometallurgy, steel, hearth, blast furnace The Mittal Steel Company operates about 36 blast furnaces on four continents. Furnaces range from 1100 m3 to 4800 m3 inner volume. The focu
Jan 1, 2006
-
The Influence Of Geology On A Simulated RockburstBy N. Reddy
The influence of local geology and rock mass characteristics on deformations during a rockburst caused by a controlled blast was studied. This was done by means of visual examination, mapping and phot
Jan 1, 2001
-
Deep Excavation Retaining Systems In Unsaturated SoilsBy Tariq B. Hamid
Deep excavation is commonly associated with construction of different deep below-grade structural elements (e.g., basement walls and slabs, tunnels, retaining walls, tanks, utilities, etc.) Deep Excav
Jan 1, 2006
-
Coal Mine Bumps: Case Histories of Analysis and AvoidanceBy David Newman
In Eastern Kentucky, the Darby seam has had an extensive history of coal bumps and pillar bursts. The combination of high overburden, strong rock and coal, subjacent and superjacent mines, and retrea
Jan 1, 2008
-
Inflows into longwall mines from inundated overlying workingsBy S Winter, G Klenowski
During longwall mining in the Bowen Basin, open tension cracks formed by overburden subsidence occur to a height of about 175 m above the mining horizon. Within this zone, water in aquifers or inundat
Oct 16, 2017
-
Running a Drill Program that Supports the Mission of BlastingBy William D. Hissem
While much technology has been developed and brought to bear in the area of blasting applications, the foundation work required for success in the muck pile begins with the drilling program.
Jan 1, 1997
-
Mining the Retreat Zone Between Two Converging Pyramids at Noranda?s Bell-Allard MineBy Véronique Falmagne
The mining sequence at Noranda?s Bell-Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modeling
May 1, 2003