Search Documents

  • SME
    Geotechnical Investigations for Tunneling in Glacial Soils

    By David Chapman, Glen Frank

    Due to the transport mechanics of the depositional environment, glacial soils display a very wide range of grain sizes and behavior. Several nonstandard drilling, sampling, and analytical techniques a

    Jan 1, 2001

  • SAIMM
    Towards Sustainability In Ferroalloy Production ? Synopsis

    By L. Holappa

    Ferroalloy production is an energy-intensive industrial sector with significant CO2 emissions. In this paper the current situation in ferroalloy processes is discussed from the standpoint of global en

    Jan 1, 2010

  • NIOSH
    RI 3264 Smelting In The Lead Blast Furnace - Handling Zinciferous Charges. XV. - Slags From The Trail Blast Furnaces ? Acknowledgments

    By G. L. Oldright

    The data presented in this paper were collected at the smelter of the Consolidated Mining & Smelting Co. of Canada, Ltd., Trail (Tadanac), British Columbia. Many thanks are due to S. G. Blaylock, vice

    Jan 1, 1934

  • CIM
    Teck Corona Operating Corporation, David Bell Mine, Concentrator Operating Highlights

    By K. Meyer

    "INTRODUCTIONThe David Bell Mine Concentrator started production in April 1985. A staff of twenty-seven people operate and maintain the concentrator. The crew is grouped into the following main areas.

    Jan 1, 1989

  • AUSIMM
    Commercialisation of Ni Heap Leaching at Murrin Murrin Operations

    Commercialisation of Ni Heap Leaching at Murrin Murrin Operations

    Sep 13, 2010

  • SME
    Site Investigations And Geotechnical Assessment For The Construction Of The Deep Underground Science And Engineering Laboratory At The Former Homestake Mine

    By Z. J. Hladysz

    A Deep Underground Science and Engineering Laboratory (DUSEL) is being planned at the site of the former Homestake Gold Mine in Lead, South Dakota, under the sponsorship of the National Science Founda

    Jan 1, 2011

  • ISEE
    Blast Designs and Instant Diagnostics Using the SVC500 Digital, High-Speed Smart Video Camera System

    By Bruce Vandenberg, Andy Battfay, Don Lake, Steve Conway, Jeff Yorsz

    "High-speed motion pictures are an invaluable resource for blasting analysis. Whether processed by the human eye or a computer, this imagery can provide important insight into a blast and its effects.

    Jan 1, 1994

  • NIOSH
    RI 3590 Temperatures Of Natural-Gas Pipe Lines And Seasonal Variations Of Underground Temperatures ? Introduction

    By W. M. Deaton

    [The formation of gas hydrates in natural-gas pipe lines depends on temperature and pressure conditions in the lines as well as on the presence of condensed water. The operating pressure in a pipe lin

    Jan 1, 1941

  • NIOSH
    OFR-42(1)-74 Protection And Troubleshooting Of Coalmine Electrical Cables - Shuttle Car Reel Test Unit - I. Introduction

    Severe whipping of shuttle car trailing cables occurs when the car stops suddenly or reverses direction. This causes cable damage, and can seriously injure personnel near the cable. FMC has contra

    Jan 1, 1972

  • CIM
    The Removal of Iron-Bearing Silicate Minerals from a Hard Rock Lithium Ore

    By T. Gammatikopoulos, C. Gibson, M. Aghamirian

    Lithium is an alkali metal found in brine deposits in the United States, Chile and Argentina, as well as in hard rock deposits in Australia and North America. In hard rock deposits, spodumene (LiAl(Si

    Jan 1, 2017

  • SME
    Field Application of NTH Fracture Classification at the Second Manapouri Tailrace Tunnel, New Zealand

    By Don F. Macfarlane

    This paper describes the field application of the NTH fracture classification to rock encountered in the construction of the 9.6 km long, 10m diameter, Second Manapouri Tailrace Tunnel. Excavation of

    Jan 1, 2008

  • NIOSH
    IC 8835 Guide To Substation Grounding And Bonding For Mine Power Systems

    By Wils L. Cooley

    Although electric utility companies have been active in grounding and bonding within substations, the mining engineer or mine electrical engineer is not involved to the extent that he can be fully up-

    Jan 1, 1980

  • AUSIMM
    An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling

    Generating short- and long-term mine production schedules in isolation and independently from each other means that only a local optimum can be achieved when each scheduling phase is carried out. The

    Dec 6, 2010

  • SME-ICGCM
    Longwall Recovery At Bailey Mine - Ground Control Challenges And Solutions (963204bd-df7d-40f3-9bd2-496636477d24)

    By Daniel Su

    This paper describes recent ground control challenges encountered at the longwall recovery areas of one of Bailey Mine?s two longwall faces and the proactive measures taken by CONSOL management and en

    Jan 1, 2009

  • SME-ICGCM
    Continuous Improvement In Cuttable Coal Rib Support In Australian Coal Mines

    By Ghassan Skybey

    Australian coal mines uses state of the art technology in coal rib reinforcement. This paper highlights the development over the past 15 years in coal rib support technology, along with the advantages

    Jan 1, 1995

  • NIOSH
    RI 5896 Combustion At Elevated Pressures In A Spherical Vessel ? Introduction And Summary

    By Joseph Grumer

    An instrumented spherical vessel has been used for many years to study laminar combustion waves. Concurrent measurements of flame speed and pressure-rise rates have led to evaluations of burning veloc

    Jan 1, 1961

  • AUSIMM
    Some Calculations Dealing with Mine Timber

    ONE of the phases of mining wide ore-bodies, such as are found in Broken Hill, is the laying-out and design of the sill floor gangway timber, When, in the above operation, a detail has to be repeated

    Jan 1, 1923

  • AUSIMM
    Mine Closure and Aftercare - The Waikato Experience

    This paper reviews rehabilitation, closure, and post-closure management of the Tui, Golden Cross, and Martha Mines, all of which are located in the Waikato Region of New Zealand. There was no requirem

    Jan 1, 2003

  • AIME
    Secondary Recovery and Pressure Maintenance - Waterflood Calculations for Multiple Sets of Producing Wells

    By S. A. Hovanessian

    The method of characteristics which reduces the Buckley-Leverett mnlineur, partial differential equation to two first-order, linear differential equations is applied to the solution of a waterffood re

  • AUSIMM
    Pitfalls in Vezin sampling for finely crushed materials

    By C J. Kruger, E le Roux

    Anglo American Platinum has adopted a strategy of Best Practice Principles (BPP) for sampling, mass measurement, analysis and metal accounting for more than a decade now. When new plants are designed,

    May 9, 2017