Search Documents

  • AIME
    Crushing In The Pit

    Open pits and quarries are the major sources of all hard rock tonnages mined today. Normally, ore is fractured from the pit bench face by blasting and then truck-hauled to a primary crusher on the pit

    Jan 1, 1978

  • SME
    Crushing In The Pit - Ore Fracture and Transportation

    By S. D. Michaelson

    Open pits and quarries are the major sources of all "hard rock" tonnage mined today. Normally, ore is fractured from the pit face by blasting and then truck-hauled to a primary crusher where processin

    Jan 1, 1968

  • CIM
    Crushing Plant Operation Review and Dust Collection Summary

    By G. P. Holmes

    "Bell Copper is situated (Latitude 55°0''N, Longitude 126°14W) on Newman Peninsula on the east side of Babine Lake at an altitude of 2,450 feet above sea level. The mine site is approximately 170 mile

    Jan 1, 1976

  • AUSIMM
    Crushing Plant Performance-Mount Isa Lead/Zinc Concentrator

    By Russell J

    A sustained drop in the grade of Mount Isa lead-zinc-silver ore occurred in mid 1980. It was decided to increase concentrator throughput from 200 000 to 240 000 tonnes/four week period to maintain

    Jan 1, 1978

  • AUSIMM
    Crushing Plant Process Optimisation

    Crushing Plant Process Optimisation Design of processes in order to find the most efficient solution to a specific task is a difficult problem. Often the number of solutions are large and the optimal

    Sep 13, 2010

  • IMPC
    Crushing Plant Variations, Simulation and Sampling

    By Per Svedensten

    One of the most significant behaviour of a crushing plant is the constant variation in the process. The variation is caused by two major effects. The first and constantly changing is the rock material

    Jan 1, 2014

  • AIME
    Crushing Practice at Ajo

    By David Cole

    THE New Cornelia Copper Co. is mining and treating a 'monzonite " porphyry" copper deposit that is all hard rock. The oxidized surface shell, which constitutes the leachable part of the orebody,

    Jan 1, 1925

  • SME
    Crushing Practice At Reserve Mining Company

    By A. S. Henderson

    Eastern Mesabi taconite is one of the hardest rocks known, but fortunately it shows little tendency to pack in the crushers, when the minus 5/16 inch material is removed. The crushing circuit is essen

    Jan 1, 1959

  • AIME
    Crushing Practice At The Braden Copper Company

    By E. R. Johnson

    THE copper concentrator of the Braden Copper Co. is at Sewell, Chile, on the western flank of the main Cordillera of the Andes, at an air distance of approximately 50 miles southeast of Santiago, the

    Jan 1, 1947

  • AIME
    Crushing Practice in the Southwest

    By David, Cole

    THE years 1914-15-16 were a pioneering period in mining, milling, and copper metallurgy generally. It was uncertain just what path the crushing, grinding, and concentrating processes would take. This

    Jan 1, 1931

  • AIME
    Crushing Practice, New Cornelia Copper Co.

    By W. L. Dumoulin

    A RATHER detailed description of the entire plant and leaching process was given in a paper recently presented to the Institute,1 so this paper will cover briefly only the crushing practice of the New

    Jan 8, 1919

  • AIME
    Crushing Resistance Of Various Ores

    By Luther Lennox

    DURING the last few years, one of the great problems in the milling of all ores has been that of crushing. This subject involves not merely the cost of the operation, but also the selection of the pro

    Jan 8, 1918

  • AIME
    Crushing Tests By Pressure And Impact

    By Fred C. Bond

    COMPRESSION TESTS THE standard method of determining the crushing resistance of rocks consists of crushing prepared shapes under slow compression, and expressing the ultimate crushing resistance at

    Jan 1, 1946

  • CIM
    Crushing, Grinding and Concentrating

    By David Runnels

    The Mount Wright iron are mine and upgrading plant were brought on line in the fall of 1975. The mine is located near the Quebec - Labrador border some six hundred miles northeast of Montreal. This pa

    Jan 1, 1977

  • AIME
    Crushing, Grinding, and Agitation of Tonopah Ores

    By H. A. BURK

    THE ores of the Tonopah, district are hard, compact and' highly siliceous. They contain from .1 to 2, per cent. of sulfide material, of which argentite is the valuable mineral; occasionally pyrar

    Jan 1, 1921

  • IMPC
    Crushing, Pelletizing and Alkaline Leaching of Massive Low Grade Zinc Oxide Ores

    By L. Y. Feng

    The percentage of leached zinc in massive zinc oxide ores (11.7% Zn, >2 mm) is up to 73.3 % in 120 days. Alternatively, crushed to -0.154 mm, mixed with cement 5% (wt), pelletized and solidified. The

    Jan 1, 2014

  • AIME
    Crushing-Machines For Cyanide Plants.

    By MARK H. LAMB

    (Canal Zone Meeting, November, 1910.) THE recent growth of a sentiment among cyanide-plant designers against the use of gravity-stamps for the crushing preliminary to cyanidation may be said to date

    Jul 1, 1910

  • AIME
    Crushing-Tests of the Diamonds Used in Drilling

    By Alexander N. Mitinsky

    UP to a certain limit, the increase of pressure on the diamond-drill increases the rate of progress in drilling. That limit is set by the resistance of the diamonds to compression; and beyond it, the

    Jan 1, 1906

  • AUSIMM
    Crust and Uppermost Structure of the Arc Regions of the West Pacific Islands

    Single station group velocities of fundamental made Rayleigh waves over the period range 15-100 s are carguted for five provincial profiles of the West Pacific. Based on recordings of earthquakes arou

    Jan 1, 1990

  • IMPC
    Cryo-SEM investigation of aggregate structures of clay minerals in flotation pulp and froth

    By Rong Fan, Roger Smart, Ning Xu

    As part of an Australian Research Council project with Newmont and Newcrest mining companies studying the influence of clay minerals on rheology, hydrodynamics and flotation response, the cryo-SEM tec

    Jan 1, 2014