FDM Prediction Of A Yield Pillar Performance In Conjunction With A Field TrialBy H. Yavuz
A Numerical modelling study using the two dimensional finite difference code "FLAC" was performed for investigating the ability of numerical modelling to predict the performance of yielding pillars. T
Jan 1, 2001
-
Optimization Of Bench Blast Design With The Aid Of Computer (febe1846-7d11-4969-9dc5-f8d6a8a628b1)By Wei Wu
A new bench blast design method and its realization with the assistance of the computer is introduced. The basic design principle is to define a rhomb cell, called fully-fractured zone, through a seri
Jan 1, 1992
-
Study On The High-Pressure Grouting Of The Overburden For Subsidence ControlBy W. J. Guo
Overburden movement as a result of longwall mining can be classified into, in ascending order, caving zone, fractured zone, and bending zone. Operation experience and laboratory research have demonstr
Jan 1, 1994
-
Directional Rock Bolt Pullout Tests as Index Tests for Estimating Rock Mass QualityBy Michael Alber
Pullout tests on resin grouted rock bolts have been executed in coal mines and surface test sites. The goal of this study was to provide some qualitative information about the rock mass quality from m
Jan 1, 2003
-
Jointing Effects On Pillar StrengthBy Gabriel Esterhuizen
When designing pillars in coal and hard rock mines it is necessary to determine the strength of the rock mass forming the pillars. Empirical strength equations, based on rock mass classification techn
Jan 1, 2000
-
Design Considerations of the Secondary Roof Support for Longwall Tailgate EntriesBy Jinsheng Chen
To maintain the stability of longwall tailgate entries, they have to be supported by not only the primary roof support but also the secondary roof support due to the impact of the longwall mining¬indu
Jan 1, 2003
-
Field Testing of a Real Time Roof Mapping Drilling Display System in a Limestone MineBy Craig Collins
The objective was to develop a Real Time Drilling Display System for Rotary Roof Bolting using Analyzing Software to display mapped holes as they are being drilled in real time. The Analyzing Softw
Jan 1, 2004
-
Localized Horizontal Stress And Its Effect On Ground ControlBy John Stankus
Regional high horizontal stress has long been recognized as an important factor affecting roof stability However, localized high horizontal stress, although causing many ground control problems, has n
Jan 1, 1999
-
RYBAD Empirical Field Model For Prediction Of Maximum Land Subsidence Associated With Longwall Coal MiningBy Thomas Rymer
Mathematical modelling of mine subsidence measured at 21 locations in Pennsylvania and northern West Virginia allows for the refinement of current methods of predicting maximum land subsidence associa
Jan 1, 1988
-
New Tools For Roof Support Evaluation And Design (64c31d00-3878-45a5-a962-d673afed7598)By Steve Signer
Researchers at the National Institute for Occupational Safety and Health (NIOSH) have developed several new tools for evaluating roof support performance. A miniature data acquisition system (MIDAS) w
Jan 1, 2003
-
Determination Of Plate Size Effect On Ultimate Bearing Capacity Of Weak Floor In Underground Coal Mines Using A Boundary Integral ApproachBy Zhanjing Yu
In this paper, an equation is developed to characterize the relationship between the UBC and plate size using a boundary integral approach. The equation was validated by the results from mo& than seve
Jan 1, 1993
-
New Approach to Evaluate the Stability of Yield PillarsBy Khaled Morsy
In this paper a new method to evaluate the stability of yield pillars was introduced. The evaluation of yield pillar stability was conducted in three steps: (1) Estimation of pillar loading - numerica
Jan 1, 2003
-
The Structural Response Of A Steel Lattice Transmission Tower To Mining-Related Ground MovementsBy Robert W. Bruhn
A 125 foot high steel lattice frame tower supporting a 500 kV EHV transmission line and located over the gateroads of a longwall mining operation was subjected to ground movements from the mining of a
Jan 1, 1990
-
International Conference On Ground Control In Mining Design Of Three-Entry System For Super Longwall PanelsBy J. D. Cole
In order to reduce the number of longwall face moves and to increase the rate of gateroad construction, super longwall panels, 1000 feet wide and 12000 to 14000 feet long, are planned for Wolf Creek C
Jan 1, 1990
-
Vertical Stress Redistribution Around A Retreating Longwall Face EndBy D. A. Payne
Large excavations, such as Iongwall panels, result in extensive vertical stress redistribution in the surrounding strata. The large abutment stresses developed may produce damage to pre-existing or pl
Jan 1, 1995
-
Effects Of Surface Topography On The Stability Of Coal Mine OpeningsBy Gregory M. Molinda
An investigation was conducted to determine the nature and frequency of coal mine roof failure beneath valleys. A mechanism for this failure, and suggestions for controlling this problem are presented
Jan 1, 1990
-
Methods Of Controlling Thick And Strong Roof In Longwall MiningBy Deren Zhu
The principle of roof control in longwall mining is to control main roof fractures so as to reduce roof weighting, plus reasonable and effective design of supports to reduce the convergence and premat
Jan 1, 1990
-
Experimental Study of Acoustic Emission Characteristics for Burst-prone Coal/Rock Fracture ProcessBy Liu Changyou
This paper analyzes experimentally the stress-strain relationship and the characteristics and variation trends of acoustic emission signals of the medium- and high-burst-prone coal/rock fracture proce
Jan 1, 2003
-
Recent Developments in the Use of Seismic Tomography in Longwall MinesBy Erik Westman
Tomographic imaging, commonly known as a CAT-scan or CT-scan, is used in the medical field to generate a picture of the interior of a body. Current research is applying this method to bodies of rock s
Jan 1, 2003
-
Analysis of Panel Stability for Post-Mining Slurry InjectionBy Tim Ross
Slurry injection into mined-out panels is an attractive alternative for disposal of coal preparation plant fines. however, in areas where surface subsidence cannot be tolerated, either by law or neces
Jan 1, 1998