Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Three-Dimensional Simulations Of The Roof Behavior In Coal Room And Pillar Panels

    By Andre Vervoort

    The roof in coal room and pillar panels is normally stratified and can be thought of as beams or plates supported by the pillar sides in the roadways and by pillar corners in the intersections Undergr

    Jan 1, 2000

  • SME-ICGCM
    Floor Heave in Shallow Room-and-Pillar Mining

    By André Zingano

    This paper analyses possible causes for floor heaving in room-and-pillar coal mining. The coal mines are in the southern part of Brazil, where the Barro Branco Coal Seam varies in depth from 20m to 40

    Jan 1, 2002

  • SME-ICGCM
    Influence Of The Sloping Of Ground Surfaces On Mine Subsidence (165d3ebb-e4c1-4bc8-a5e4-409b4e24155c)

    By D. M. Shu

    A two-dimensional finite element modelling technique is applied to predict the subsidence movements on a sloping ground surface above a completely mined panel. The modelling is carried out for the sur

    Jan 1, 1992

  • SME-ICGCM
    Critical Appraisal Of Pillar Design As Required By Coal Mines Regulations Of India VIS-VIS Latest Rock Mechanics Formulae

    By S. K. Sharma

    The present study attempts to critically review the pillar-design as required by Coal Mines Regulations of India vis-a-vis latest rockmechanics formulae, Equivalent material modelling was the approach

    Jan 1, 1992

  • SME-ICGCM
    A Study of Periodic Weighting of Longwall Supports

    By Archie Richardson

    Periodic weighting of longwall supports occurs during retreat ofthe face under certain geologic conditions. Strong stratain the immediate and main roof tend to cantilever over the gob, weighting the s

    Jan 1, 1998

  • SME-ICGCM
    Development Of A Statistical Technique For Assessing Sandstone Escarpment Stability

    By Hamid Maleki

    During the last decade, a significant amount of research has been conducted by Energy West Mining Company, government agencies, academia, and consulting companies to develop predictive tools for asses

    Jan 1, 2000

  • SME-ICGCM
    Effects of Bolt Spacing, Bolt Length, and Roof Span on Bolt Loading in a Trona Mine

    By Steve P. Signer

    Researchers from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health installed 39 instrumented, fully grouted bolts at six test sites in a trona mine retreat p

    Jan 1, 2001

  • SME-ICGCM
    Statistical Regional Calibration Of Subsidence Prediction Models

    By D. N. Cleaver

    Like other influence function methods, the SWIFT subsidence prediction program, developed within the Mineral Resources Engineering Department at the University of Nottingham, requires calibration to r

    Jan 1, 1995

  • SME-ICGCM
    Roof Bolting for Long-Term Entries in Underground Coal Mines

    By Peter Zhang

    As simpler and easier reserves are exploited to depletion, underground coal mining continues in more complex geologic settings and conditions. Roof bolting for long-term entry stability is always a ch

    Jan 1, 2011

  • SME-ICGCM
    Roof Monitoring In Limestone Mines-Experience With The Roof Monitoring Safety System (RMSS)

    By Thomas E. Marshall

    During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) examined and characterized conditions at a majority of the undergroun

    Jan 1, 2000

  • SME-ICGCM
    Monitoring and Prediction of Ground Movements Above Underground Mines in the Eastern United States

    By M. Karmis

    mining factors and representative ground movement parameters. Based on this analysis, the previously developed prediction methods were modified and tested for their applicability in the Appalachian co

    Jan 1, 1987

  • SME-ICGCM
    Study of Ground Movement Over a Longwall Mine

    By A. W. Khair

    This paper presents an analysis of ground movements recorded from longwall operations in the Northern Appalachian region in West Virginia. The site chosen for the investigation was selected due to var

    Jan 1, 1987

  • SME-ICGCM
    Modelling Of Pillar Stability In Room And Pillar Mines

    By Douglas Morrison

    By applying modern 3D numerical modelling techniques to the analysis of a pillar cascade failure in a room and pillar mine, it has been possible to simulate the collapse and develop an understanding o

    Jan 1, 2003

  • SME-ICGCM
    Monitoring For The Evaluation Of The Stability Of Underground Openings

    By P. K. Kaiser

    The purpose of deformation monitoring for the evaluation of the stability of underground openings is reviewed briefly and some results from laboratory tests of small tunnels are presented. The ground

    Jan 1, 1981

  • SME-ICGCM
    Design, Monitoring And Evaluation Of A Pre-Driven Longwall Recovery Room

    By Tom Wynne

    In order to shorten the time required and improve safety for a longwall face move, a 36-ft wide longwall recovery room was predriven. The room was supported with specialty bolts, trusses and concre

    Jan 1, 1993

  • SME-ICGCM
    Geotechnical Constraints On A 6 M Single Pass Longwall

    By Ross W. Seedsman

    The feasibility of 6 m high single pass longwalling has been studied using Newlands Mine as a case study An intensive geological investigation identified a range of hazards but a mine layout was possi

    Jan 1, 1992

  • SME-ICGCM
    Variation of Horizontal Stresses and Strains in Mines in Bedded Deposits in the Eastern and Midwestern United States (18e10a78-83b8-48d9-ab61-d01619f77fb4)

    By Dennis Dolinar

    In general, the direction of the maximum horizontal stress in the eastern United States is fairly well defined. However, the variation of the magnitudes of the horizontal stresses is not very well und

    Jan 1, 2003

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine (8325db0b-edfd-48b5-8c88-7ef0db101af9)

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    The Technical Progress and Problems to Be Solved of Thick Coal Seam Mining in China

    By Jiacheng Wang

    The current state of thick seam coal mining methods is illustrated in three typical cases of thick seam longwall mining, each pointing out the outstanding achievements in top-coal caving mining and la

    Jan 1, 2011

  • SME-ICGCM
    Management of the Dynamic Phenomena of Rock Pressure in Underground Mines

    By Vladimir I. Klishin

    Complex method of ruling of rock pressure is considered in conditions of rapid roof subsidence. The purpose of this method is elaboration of emergency devices into hydraulic props. Also method of unlo

    Jan 1, 1997