Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Update on the Performance of the Tankcell E500 at the Kevitsa Mine"Outotec’s TankCell® e500 flotation cell was commissioned during 2014 at the Kevitsa Mine in northern Finland. The TankCell® e500 is the first cell in this size class (500m3) to be run in an operation
Jan 1, 2016
-
Project Development Process-An OverviewBy David A. Milligan, William Cobb
2.1 INTRODUCTION This chapter provides the reader with a sense of how a heap leach project may make an orderly, and hopefully non-traumatic, transition from discovery or acquisition to project constru
Jan 1, 1988
-
SO2 abatement in a 440-kW pilot-scale combustor - limestone injection testsBy G. H. Lewis, C. L. Krcil, N. S. Harding, D. E. Havekotte
INTRODUCTION Limestone injection work was completed in a 440-kW (1.5-million Btu per hour) pilot-scale combustor in preparation for a 50,000-kg/h (110,000-lb per hour) industrial steam boiler lime
Jan 1, 1987
-
US Iron Ore Industry Facing More Worldwide CompetitionThe 71st Annual Meeting of the Minnesota Section of SME and the 59th Annual University of Minnesota Mining Symposium were held jointly April 14-16, 1998, in Duluth, MN. Registration was estimated at 4
Jan 1, 1998
-
La Granja Copper Mine ProjectBy Jorge Lanza
SUMMARY La Granja copper deposit, in terms of volume, is among the five largest deposits in the world and represents reserves of three thousand million tones. The field consists of a 40 m. thick la
Jan 1, 1998
-
A Case History on the Reduction of Chlorides from Mine WaterBy K. Lagnese, C. Robinson, S. Muddasani
"Mine water generated from underground coal mining operations contains both dissolved and particulate solids. Dissolved solids primarily consist of sodium, calcium, magnesium, potassium, chlorides and
Jan 1, 2015
-
Breaking Through: Shaft Design and Construction Considerations from Miami’s Norris Cut ProjectBy Richard Giffen, Boris CARO VARGAS, Terrence Carroll
"This paper takes an in-depth look at the $72 million design-build Norris Cut project, which includes the replacement of an existing 54-inch waste water sewer main to Fisher Island under the Norris Cu
Jan 1, 2016
-
Better Utilization Of Drilling And Blasting Resources To Increase Mining ProfitabilityBy Paulo Roberto Pereira
This paper is motivated by the belief that increasing drilling and blasting costs will not necessarily bring about better digging or crushing productivity. As a matter of fact it can be counter produc
Jan 1, 2005
-
Montana Tech’s Underground Mine Education CenterBy P. Knudsen, S. Rosenthal
INTRODUCTION In 2010, Montana Tech was gifted 65 acres of land immediately west of the campus. The parcel of land included an old silver mine called the Orphan Boy Mine. The Orphan Boy and its sister
Jan 1, 2019
-
Stabilization And Bioremediation Of Heavy Metal Smelter Wastes And Tailings - 1. IntroductionBy T. Stuczynski
In the past ten years about 3000 wastewater treatment plants have been built in Poland. The result of this development has been a massive increase in overall sludge production. According to data suppl
Jan 1, 2002
-
Use Of Lightweight Flyash Blocks To Construct Fills On Sensitive SoilsBy E. B. Kroeger
One of the problems encountered when constructing a roadway is the planned route often needs to cross soils that are soft and highly compressible. An approach to dealing with soft and compressible so
Jan 1, 2003
-
Dragline Extraction of 1.2 Million Tonnes of a 52-Meter Thick Vertically Dipping Coal SeamBy T. J. Morris
"From November 2014 through September 2016, Westmoreland’s Coal Valley Mine utilized a Marion 7450 electric walking dragline to extract 1.2 million tonnes of a vertically-dipping, 52-meter wide, fault
Jan 1, 2017
-
Efficient Lighting for the Presidio Parkway TunnelsBy Pierre Longtin
"Replacing the aging roadway access to the iconic Golden Gate Bridge, thereby ensuring traffic safety and robustness in case of seismic occurrences, provided an opportunity for major design improvemen
Jan 1, 2016
-
Rehabilitation of Farnworth Tunnels - Modifying Victorian Tunnels for the 21st CenturyBy Eoin Murphy, Stephen Beauchamp, Steven Cowell
"INTRODUCTION Electrification of the heavily trafficked Manchester to Preston route by Network Rail required the rehabilitation of the Victorian era Farnworth Tunnels to accommodate 21st century high
Jan 1, 2016
-
Intelligence Decision-Support System For Mine ManagersBy D. R. Schricker
Mine managers rely on their experience, section foreman's daily reports and occasional time studies to make important production, maintenance and forecasting decisions. This information is often
Jan 1, 1990
-
Processes And Technologies With Low Ecological Impact For Gold And Silver Recovery From Secondary Resources And Refractory Gold-Bearing PyritesBy P. D. Georgescu
Gold, like no other metal, has a fascinating and special place in the world. It is used in a range of every day applications essential to modern life. Gold has long been considered the most precious
Jan 1, 2006
-
Financial Considerations for Negotiating the Gold Sales ContractBy William Mayrsohn
INTRODUCTION The net smelter return (NSR) calculations made on various smelter-refiner alternatives, is usually done by taking the gross metal value less metal deductions, smelter-refiner charges and
Jan 1, 1987
-
Accelerating Tunnel Inspections Using Scanning TechnologyBy Nasri Munfah, Raymond E. Sandiford
"Superstorm Sandy (Sandy) created a storm surge that inundating many of the tunnels that pass beneath the Hudson and East Rivers. The tunnels are vital infrastructure links for the economy of New York
Jan 1, 2016
-
WTC 2016 attracts more than 2,300 professionals from around the worldBy Steve Karl
"The International Tunnelling and Underground Space Association (ITA) held its 42nd General Assembly along with the 2016 World Tunnel Congress (WTC) April 22-28 in San Francisco, CA. The event was co-
Jun 1, 2016
-
Risk Management for Soft Ground Tunnels in New YorkBy Andy Thompson, Frank Perrone
"As part of the Metropolitan Transportation Authority’s $10.5bn East Side Access Project in New York, 3,200 m of tunnel had to be constructed in rock, mix face and soft ground conditions beneath one o
Jan 1, 2016