Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
XXL Pipe Jacking: Technological Aspects of Large-Diameter and Long-Distance Drives - NAT2024By Peter Schmäh
Pipe-jacked tunnels are considered for a large variety of applications from water and sewage, cable ducts to challenging pipeline crossings or landfall construction. In most cases, Slurry MTBMs are us
Jun 23, 2024
-
7. Prefeasibility Study of a Complex Uranium Deposit - A Case History ? IntroductionBy Richard A. Bideaux
During 1977 and 1978, a comprehensive study was made of the drill-hole data obtained by Urangesellschaft, USA, from their Juniper Ridge, WY, uranium deposits. This included uranium grade data acquisit
Jan 1, 1979
-
Startup and operation of the Kidd Creek zinc sulfide pressure leaching plantBy B. H. Johnston, B. N. Doyle
Introduction In 1983-84 Kidd Creek Mines Ltd. in Timmins, Ontario, started up the second commercial zinc pressure leaching plant based on the Sherritt Gordon Mines Ltd. direct pressure leach proces
Jan 1, 1987
-
The Retention of Arsenate in an Oxisol Soil Under Different Electrolyte SystemsBy Clarice L. Amaral, Ricardo Melamed
Clay-coating has been used as an environmental technology tool for the immobilization of toxic elements. The mechanisms of arsenate retention in clays suggest that not only the system pH is of fundame
Jan 1, 1998
-
Continuous Monitoring Of Natural Ventilation Pressure At The Waste Isolation Pilot PlantBy Ian M. Loomis, Keith G. Wallace
The Waste Isolation Pilot Plant (WIPP) is a U.S. Department of Energy research and development facility designed to demonstrate the permanent, safe disposal of U.S. defense-generated transuranic waste
Jan 1, 1993
-
Stochastic Approaches To The Characterization Of Rock Mass PropertiesBy K. Kim, H. Gao
A site-characterization strategy formulated for the probabilistic assessment of rock mass properties is presented. The strategy, which takes into account the variability of rock properties and the sto
Jan 1, 1997
-
Effect Of Ball Size Distribution On Rock Phosphate Grinding In Industrial Ball MillBy Saurabh Rastogi, Vikram Shishodia, B. Pitchumani
Comminution is a unit operation which consumes major part of energy in mineral processing industries such as fertilizer production. Ball mills are widely used for size reduction of a given ore to the
Jan 1, 1993
-
Benefits and Challenges of Progressive Design-Build Procurement— Atlanta Plane Train Project - NAT2022By John Murray, Daniel Ebin, Robert Gould
The Atlanta Plane Train project at Hartsfield-Jackson Atlanta International Airport employed the progressive design-build approach. This provided opportunities for collaboration between the design-bui
Dec 1, 2022
-
Development of the ITA “BIM in Tunneling—Guideline for Bored Tunnels” - NAT2022By Jurij Karlovšek, Wolfgang Angerer, Vojtech Ernst Gall, Jacob Grasmick
The International Tunneling Association (ITA) Working Group (WG) 22 “Information Modelling in Tunneling” has developed a guideline for the implementation of Building Information Modeling (BIM) concept
Dec 1, 2022
-
Removal of molybdenum and heavy metals from effluents by flotationBy J. P. Hanten, G. Ramadorai
This paper presents laboratory and pilot plant data on the removal of heavy metals and molybdenum from mining-milling waste water. Molybdenum is removed as an Fe-Mo precipitate by proper addition of f
Jan 1, 1987
-
Disposal and Use of Coal Combustion Products in Mined EnvironmentsBy Paul F. Ph. D. Ziemkiewicz, Courtney D. Black
According to the American Coal Ash Association, 105 million tons of coal combustion products (CCP) were produced by the power generating utilities in 1997. Of that total, 1.68 million tons were used i
Jan 1, 2000
-
Batch Coal Flotation Model Based On Water Recovery ConceptBy B. Govindarajan, T. C. Rao, M. Vanangamudi
The results obtained from hatch, flotation experiments on two coals were used to develop relationships between the recoveries of water and solids into the concentrate. When the recovery of non-ash mat
Jan 1, 1992
-
A Solution To The Optimal Setting Of Air Flow-Control Devices In A Ventilation NetworkBy Eddy J. Jacques
When the automatic control of a ventilation process is considered, and supervising expert systems need to be designed, an important problem to address is: what will be the optimal set points of the r
Jan 1, 1991
-
The Fundamentals For An Expert System, Designed To Assist The Layout Planning Of Face Operations For An Underground Coal MineBy F. L. Wilke
The prototype of an expert system, designed to assist layout planning of face operations, is presented. By specific combination of knowledge-based and conventional EDP techniques it has been possible
Jan 1, 1989
-
CO2 as an Exhaust Emissions Surrogate in Small Dieselized MinesBy M. K. Gangal, E. D. Dainty, G. Kunchur
This paper presents a validation of C02 as a single surrogate measurement for other diesel-emitted pollutants in multi-diesel-machine operations typical of small underground mines. This means that the
Jan 1, 1991
-
Fly Ash Paste Utilization for Placement as Mine and Landfill Backfill at Great River Energy's Coal Creek StationBy D. Randall Crooke, Ron R. Jorgenson
Many coal combustion products (CCPs) have historically been unsuitable for placement as mine backfill because of their physical and geochemical properties and/or regulatory status. However, innovation
Jan 1, 2001
-
Interactions Between Anionic Collector And Alizarin Modifier In Dolomite/Francolite Flotation SystemBy L. Xiao
Using K-oleate as a collector and alizarin red S (ARS) as a modifying agent, selective depression of dolomite from francolite was achieved in alkaline medium (pH> 9.0). Interestingly. ARS was also fou
Jan 1, 1988
-
Method For Determining The Contribution Of Diesel Particulate To The Respirable Dust Levels In Underground Coal MinesBy R. Stanevich
Studies by the National Institute for Occupational Safety and Health (NIOSH) and the Bureau of Mines (BOM) have demonstrated that: (1) 90% of diesel particulate is less than one (1) micrometer in aero
Jan 1, 1988
-
Implementing BIM Underground on Progressive Design-Build Atlanta Plane Train West Extension Project - NAT2022By Jeff Fontana, Daniel Ebin, Eric Westergren, William Currier
The PMott MacDonaldlane Train Tunnel West Extension (PTTWE) Project at HartsfieldJackson Atlanta International Airport includes the extension of the existing automated people mover system and terminal
Dec 1, 2022
-
The Next Generation of TBMs and Conveyor Systems for Mining ApplicationsBy Greg Watson, Dennis Ofiara
"TBMs have been used in mining in decades past, but their use has been limited and sporadic, due to both perceived and actual application difficulties. With new technology and mounting success stories
Jan 1, 2016