An Acoustical Field Comparison Of Hand Drills: Electro-Pneumatic Vs. Pneumatic JacklegBy D. R. Zuchelli
In order for MSHA to require the use of a noise control, the control must be proven ?technologically feasible?. Technologically feasible controls must reduce a miner?s noise overexposure to the permi
Jan 1, 2011
-
Economic Conditions Help Minnesota’s Iron Ore MiningBy William R. Yernberg
What a difference a year makes. One year ago, the iron mining industry and the steelmaking industry in the United States were in trouble. Many companies were in bankruptcy, and talk of plant and mine
Jan 1, 2004
-
Stress control methods help to optimize underground mine designBy Mark Lawshe, Shosie Serata
The conventional method of mining underground, using narrow rooms and wide pillars, has proven to be poorly adapted to the powerful earth forces that act on underground openings. The high costs of roo
Jan 1, 1989
-
Additional Test Results for Comparison of Penetration of Grout Made with Various Ultrafine Cement ProductsBy Shimi Tzobery, Jay Davenport, Raymond Henn, Sam Bandimere
Over the past several decades, the use of cement-based grouts using ultra fine cement as a replacement for portland cement has begun to gain acceptance as an alternative to chemical solution grouts us
Jan 1, 2005
-
Seismic Upgrades of the Claremont TunnelBy Bill Cain, R. John Caulfield, D. Scott Kieffer
The East Bay Municipal Utility District is undertaking seismic upgrades of the Claremont Tunnel in the San Francisco Bay area. The tunnel carries treated water across the active Hayward Fault to suppl
Jan 1, 2001
-
Impact Of Electronic Blasting Detonators On Downstream Operations Of A QuarryBy G. Caron, M. Boisclair
In 2005, CANMET-MMSL used its pool of expertise in ground control, open pit and underground mine engineering, mineral processing, information technology and applied mineralogy to launch a mine-to-mill
Jan 1, 2007
-
Design Principles for Soft Ground CutterheadsBy Werner Burger
The last decade has witnessed a rapid development and application of slurry and EPB type tunnel boring machines. Both soft ground types are able to excavate tunnels in unstable ground conditions below
Jan 1, 2007
-
Stratabound Tungsten Deposits In Metamorphic Terrains: Stratabound Scheelite Deposits Of Northeast BrazilBy J. C. Reid
Pre-cambrian scheelite deposits in Northeastern Brazil are widespread in a high grade metamorphic terrain. Previously these deposits had been interpreted as contact-metasomatic. In this paper, a volca
Jan 1, 1983
-
Annual Review 2001 – The United States 2001By R. F. Balazik
By March 2001, shrinking global markets, reduced consumer spending and declines in domestic manufacturing and industrial output ended the longest economic expansion in US history and pushed the nation
Jan 1, 2002
-
Extensive Concrete and Shotcrete Systems for the World?s Longest Tunnel (Gotthard Base Tunnel?56km)By Jürg Schlumpf
Concrete is one of the decisive construction materials, also for the AlpTransit Gotthard Tunnel. The client has many requirements, and many are the solution possibilities that concrete systems can off
Jan 1, 2008
-
Proactive Approach To Addressing Environmental Concerns For Tunneling Under AustinBy Ray Brainard
The Jollyville Transmission Main will be a 10.5-km- (6.5-mile)-long, 213-cm (84-in.) diameter rock tunnel. The tunnel will pass beneath the Balcones Canyonlands Preserve, which was established to prot
Jan 1, 2012
-
Glenbrook Nickel – Can New Caledonian Ore Save the Only US Nickel Producer?By Kerry Spickelmier
The only nickel smelter and the only active nickel mine in the United States is Glenbrook Nickel Co., a joint venture (50% each) of Cominco Resources International Ltd. and Cominco Ltd. In 1989, with
Jan 1, 1993
-
Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel ProjectBy Stephen M. Smading
Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w
-
Cliffs And Associates Limited Circored® Iron PlantBy E. C. Dowling, S. A. Elmquist, L. A. Kipfstuhl
The Cliffs and Associates Limited (CAL) 500,000 tpy HBI plant located in Trinidad was commissioned after modifications in early 2001. This plant employs the novel Lurgi Circored® process to reduce iro
Jan 1, 2002
-
High Performance Tunnel Boring Machine for Kárahnjúkar Headrace Tunnel, KAR-14—A Design and Case HistoryBy Brian Khalighi, Massimo Franceschi, Giovanni Giacomin, Gianni Porta
Headrace Tunnels and parts of the Access Adit Tunnels of Kárahnjúkar Hydropower project, KAR-14, in Iceland will be excavated using three full-face Robbins Tunnel Boring Machines (TBM). TBM sizes rang
Jan 1, 2005
-
Development Of Experimental Procedures To Analyze Copper Agglomerate StabilityBy K. A. Lewandowski
The efficiency of heap leaching is reduced by poor solution flow characteristics (i.e., channeling and ponding) that result from fines migration. Agglomeration of the ore can immobilize fines, but for
Jan 1, 2008
-
Development And Comparison Of Subsidence Prediction Methods For The Eastern U.S. CoalfieldsBy P. Schilizzi, A. Jarosz, M. Karmis
This paper is concerned with subsidence prediction methods and in particular with two techniques, one based on profile functions and the other on influence functions. Profile function methods provide
Jan 1, 1986
-
Evolving Soft-Ground Tunneling in SeattleBy Leon Maday, Robert Robinson, Judy Cochran, Don Davis
Over the past 20 years, several soft-ground tunnels have been successfully completed in the Seattle area. These tunnels were built using design-bid-build contracting methods, and have benefited from a
Jan 1, 2005
-
Compensation Issues In The Third World: A Ghanaian PerspectiveBy K. W. Grubaugh
Indigenous people are nearly always affected when projects enter their territory. Crop and other asset compensation can help or undermine a project’s progress depending on the approach. When compens
Jan 1, 2002
-
Planning and Fast Track Tunnel Design in Historical Downtown CharlestonBy James McKelvey, Larry Drolet, Jason Swartz
INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved
Jan 1, 2005