Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Combination Blind Or Reaming Drill For Raise ConstructionBy L. "Andy" Anderson, Stephen N. Short, James E. Friant
Since the introduction of "boxhole" drilling in South Africa in 1973, the concept of a blind raise, drilled upward from below, has become an accepted mining practice. A combination machine, capable of
Jan 1, 1985
-
Methods For Removing Arsenic From Aqueous SystemsBy L. R. Moore
Arsenic is among the list of major contaminants in mining aqueous waste streams. Though the elemental form is toxic, the aqueous oxyanions are more so. The most common forms of arsenic released duri
Jan 1, 2012
-
Plant-Site Evaluations Of The OPSA System For On-Line Particle Size Measurement From Moving Belt ConveyorsBy Y. K. Yen, J. D. Miller, C. L. Lin
The image-based On-line Particle Size Analyzer (OPSA)system has been developed at the University of Utah to measure particle size distributions under plant conditions where overlapped and segregated p
Jan 1, 1999
-
Uncertainty Based Push-Back Design Algorithm In Open Pit MiningBy J. Gholamnejad
In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi
Jan 1, 2007
-
Conversion Of Fixed Speed To Variable Speed For Sag Motors At The Barrick Goldstrike MineBy J. Hebert, J. Donnelli, J. Sedey
Installation of a Load Commutated Inverter (LCI) provides an economical method for conversion of a Fixed Speed Semi-Autogenous Grinding Mill into one with variable speed, qualities. Though capital int
Jan 1, 1999
-
Interaction Of Grade And Metallurgy Simulations In Assessing Uncertainty For Ore Routing Determinations In The Gold Quarry DepositBy M. Baumann
Introduction Gold Quarry is one of the largest gold deposits in Nevada, located along the Carlin Trend, approximately seven miles north of Carlin, NV. Owned and operated by Newmont Mining Corporati
Jan 1, 2007
-
Got Wet Or Dry? Get Mist Drilling.By Dan Armour
Bolting solutions traditionally offered only wet drilling or dry drilling options; each with advantages and disadvantages. Joy Mining Machinery has developed a Mist Drilling System that incorporates t
Jan 1, 2005
-
Design Criteria For Multistage Spiral CircuitsBy T. McKeon, G. Luttrell
Spiral separators are commonly used to upgrade sand-sized particles in both the coal and mineral processing industries. Many plants utilize multiple stages of cleaning and/or scavenging spirals to imp
Jan 1, 2007
-
Technology News – Boxhole Borer Has Safety, Operational and Cost AdvantagesA machine that improves safety during the cutting of boxholes (ore-passes) and travelways in underground mining operations has delivered impressive results in trials conducted at a South African plati
Jan 1, 2006
-
The Regulation Opportunity - PreludeBy R. Dillinger
In the environmentally conscious social atmosphere today, reclamation in surface mines has become a main issue to the public and the regulatory committees. In response to this increased attention, ma
Jan 1, 2011
-
Investigation Into Dust Exposures And Mining Practices In Mines In The Southern Appalachian Region - Preprint 09-009By D. E. Pollock
Recent NIOSH published information has shown an increase of rapidly progressive coal workers? pneumoconiosis (CWP) in the southern Appalachian coal region (SAR) of the U.S., despite the fact that comp
Jan 1, 2009
-
Sustainable Mine Water Management at Remediated Uranium Mining Sites of the Former Wismut Mining OperationsBy M. Paul
"INTRODUCTION In 1990, the uranium production of SDAG Wismut in East Germany was stopped. 45 years of inconsiderate destructive exploitation had scarred both landscape and nature. With the “Wismut law
Jan 1, 2016
-
The Regulation of Subsidence and Underground Coal Mining in IllinoisBy Paul J. Ehret
With the passage of the Surface Mining Control and Reclamation Act (SMCRA), and the implementation of state permanent programs, underground coal mining operations are for the first time subject to gov
Jan 1, 1986
-
Design, Construction And Start-Up Of The Ilo Smelter Modernization ProjectBy H. Walqui, C. Noriega
Southern Copper Corporation (SCC) is one of the world’s largest copper companies and is finishing the modernization of the Ilo copper smelter. A single ISASMELTTM furnace will start smelting 1,200,000
Jan 1, 2007
-
Analytic Approach For Sizing Feeders And Gathering Belts In Mines Using Discrete-Vehicle Face HaulageBy J. C. Yingling
[New stochastic process models are developed to calculate the probability of various fill levels in section feeders as a function of vehicle interarrival times, payloads and feeder-discharge rates. Th
Jan 1, 1997
-
A Review Of Rock Support And Falls In Us Coal Mine Intersections - Preprint 09-132The support of the roof in coal mines remains a critical safety issue with 3 fatalities from roof falls in 2007 and 430 injuries from roof falls in 2006. A snapshot survey by the authors of room desig
Jan 1, 2009
-
Meeting the Challenges and Risks for Tunneling Under San Diego State UniversityBy Dave Ragland
The SDSU tunnel and underground station are the first of these type facilities to be constructed by the Metropolitan Transit Development Board. Because there is no previous experience, and because tun
Jan 1, 2001
-
Surface Tension Of Flotation Solution And Its Influence On The Selectivity Of The Separation Between Apatite And Gangue MineralsBy M. Martins
This work presents and discusses the influence of the surface tension (gLV) of methanol/water mixtures on the flotation response of apatite versus gangue minerals conditioned with flotation reagents (
Jan 1, 2009
-
Connections to Old Tunnels - Design GuidelinesBy Jozef F. Zurawski
Increasingly new interceptors or new Combined Sewer Overflow (CSO) projects require connections to existing tunnels. More often than not, the existing facilities are old, in poor or questionable condi
Jan 1, 2008
-
Allegheny River Tunnel Crossing ProjectBy Paul A. Roy
The North Shore Connector Project for the Port Authority of Allegheny County constructs twin Tunnel Boring Machine (TBM) tunnels through cohesive soils and rock beneath the Allegheny River and a narro
Jan 1, 2008