Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Automation of Drill and Blast - Measurement Techniques to Develop Standard Procedures (a3ef629c-b178-4045-bc88-d04c273fd2c0)

    By Ewan Selers, Gary Cavanough

    Drilling automation technology is well advanced and automated drill rigs are in use at a number of operating mines. This is not the case for the other drill and blast processes due to significant tech

    Jan 1, 2016

  • ISEE
    ApplicationofArcGISProinBlast-InducedGroundVibrationAnalysisinanOpenPit CopperMine

    By Yong Pan, Purushotham Tukkaraja

    It has been well understood that blasting is the cost-effective method for breaking rocks as compared with the mechanical systems. However, vibrations induced by blasting in open-pit mines could pose

    Jan 1, 2019

  • ISEE
    Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power Plant

    By Thierry Bernard, Philippe Dozohne

    May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate

    Jan 1, 2001

  • ISEE
    Risk Assessment Software Applied To Large Bomb Detonations Near Structures

    By Joshua Hoffman, Rob Farnfield, Catherine Johnson, Braden Lusk, Morgan Lane

    IMESAFR (IME Safety Analysis for Risk) is a quantitative risk assessment software tool developed by the Institute of Makers of Explosives (IME) and A-P-T Research, Inc. It is used for managing risk in

    Jan 1, 2014

  • ISEE
    Novel Non-Detonable Pumpable Mechanical Sensitizer and System for Emulsion Explosives for Improved Security

    By Piet Halliday, Ellina Kharatyan

    Conventionally, emulsion matrices (unsensitized) need to be sensitized to become detonable explosives. This is done either chemically or mechanically. Both methods have their advantages and disadvanta

    Jan 1, 2015

  • ISEE
    Comparison of Structure Response to Hard and Soft Rock Blasting

    By C. T. Aimone-Martin, V. L. Rosenhaim

    The response of two structures to blast-induced ground vibrations were evaluated and compared in order to quantify the impact of different blasting operations, hard rock and soft rock blasting, upon t

    Jan 1, 2015

  • ISEE
    Towards Deterministic Fragmentation Models for Surface Mines

    By Galetakis M., Deligiorgis B., Xiroudakis G.

    Fragmentation prediction is important in surface mining to optimize downstream processes such as loading, hauling, comminution, and beneficiation processes. Traditional approaches, such as the Kuz-Ram

    Jan 26, 2026

  • ISEE
    Optimizing Rotary Drill Performance

    By George P. Jr Schivley

    Data is presented showing Penetration Rate (PR) versus Force-on-the Bit (FB) and Bit Angular Speed (N). Using this data, it is shown how FB and N each uniquely contribute to the PR for any particular

    Jan 1, 1995

  • ISEE
    Case Study: Mining Blast Information Management.

    By J Silva Castro, Braden Lusk

    Information management is important in all disciplines. In mining; collection and analysis of information before, during and even after mining is a keystone to performance. During mining, information

    Jan 1, 2012

  • ISEE
    Development of a new contour blasting system using bulk emulsions

    By Peter Moser, Mark Ganster, Radoslava Ivanova, Florian Bauer

    Blasting accurately in underground drifts and creating a smooth contour requires proper drilling, knowledge about the apparent geology, a well designed blast pattern and ideally a smooth blasting prod

    Jan 1, 2012

  • ISEE
    Journal: 100 Years / DRIVING HEADINGS IN ROCK TUNNELS Transactions of the American Institute of Mining Engineers New York 1910

    By W. L. Saunders

    RBH Note: In the early days of drill & blast tunneling the jobs utilized large crews of drillers and muckers. Advance per round was limited (typically around four feet) but two rounds per 8-hour shift

    Jan 1, 2011

  • ISEE
    A "Holistic" Approach of Blast Vibration Modeling and Prediction

    By Thierry Bernard

    Considering rock fragmentation by explosive as the ultimate goal in mines and quarries, vibrations are definitely one of the main drawbacks faced by the Industry. If we can accurately predict vibratio

    Jan 1, 2009

  • ISEE
    Excavation of a Tunnel to Reach a Large Underground Cavern Roof Fall

    By H. S. Venkatesh R. Balachander, G. C. Naveen

    During the construction of a 1020 MW underground hydroelectric project in Bhutan a huge rock fall took place in the Downstream Surge Chamber (DSC) during March 2016. The total quantity of rock in the

    Jan 1, 2019

  • ISEE
    Demolition of Churchill House in Belfast, Ireland

    By Dick Green

    During the recent troubles in Northern Ireland due to terrorist activities, there have been many buildings demolished or damaged by improvised explosives. This article explains about the Demolition of

    Jan 1, 2006

  • ISEE
    Exclusion Zone Optimization: Application of New Digital Technologies Allowing Ore Production

    By Jair Alarcón, Lucas Steffen, Leopoldo Muñoz

    Flyrock is one of the most significant hazards associated with blasting in open pit mining, especially for blasting operations near communities. Flyrock can lead to severe injuries, fatalities, and pr

    Jan 21, 2025

  • ISEE
    Underground Longhole Blasting near Large-diameter Booster Fans

    By Norm Disley, Kingsley Hortin, Gertjan Bekkers

    As part of the expansion of the Kidd Creek Mine to 2,682 meters (8800 feet) below surface, two largediameter 3000kW (4000HP) booster fans were installed at the 6000 level. Shortly after commissioning

    Jan 1, 2008

  • ISEE
    Evaluation of Emergent Electronic Detonators and Modern Non-Electric Shocktube Detonators Accuracy

    By J Silva Castro, W C. Wedding, B T. Lusk, J Calnan, E G. Morris

    The emergence of electronic detonators for use in production mine blasting has enabled mining professionals to rethink the traditional blast design methodologies that pertain to timing. In many ways,

    Jan 1, 2012

  • ISEE
    Using Photogrammetry and UAVs for Pattern Optimization, Quantification, and Mapping

    By Tony Rorke, Tamara Wiseman

    Due to the advancements in technology it becomes easier to obtain accurate measurements for mining, quarry, and construction operations even in the most remote places. The use of off-the-shelf photogr

    Jan 1, 2015

  • ISEE
    Journal: Vibration Control Through Better Predictions

    By Keith Best

    It has been said that when a person does something right no one remembers but when they do something wrong no one forgets. This statement, when applied to the explosives industry, has never been truer

    Jan 1, 2008

  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne