Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Session 21 "Grouting in Karst"By Jim Henry
I would say mainly the cost. I showed only 3 cases. One of them was the one that Allen just described and there were two other cases. In those cases it was fairly easy to develop a solution using limi
Feb 10, 2003
-
Removal of the Former San Francisco-Oakland Bay Bridge Foundation Caisson E3 by Mechanical Means and ExplosivesBy Michael Gebman, Jack Gerwick
"With the opening of the new San Francisco-Oakland Bay Bridge East Span, the former bridge and its caisson foundations are being demolished. Caisson foundations are in the path of a future shipping ch
Jan 1, 2016
-
Effect of Electrokinetics on Pullout Resistance of Sheet Pile WallsBy Antonio Kodsy, Lutful Khan
A research was carried out to test the possibility of reducing the pullout resistance of metal sheet piles driven in clay soils using Electrokinetic (EK) conditioning. The hypothesis was applying an e
Jan 1, 2019
-
Investigating Reinforcing Effects of Soil-Cement Columns in Liquefiable Sand Using Dynamic Centrifuge TestsBy C. Guney Olgun, Mohammad Khosravi, Daniel W. Wilson, Deepak Rayamajhi, Scott A. Ashford, Shuji Tamura, Ross W. Boulanger
"Dynamic centrifuge tests were performed on unimproved and improved soil with soil-cement column models. The reinforcing effect of isolated soil-cement columns for reducing liquefaction potential and
Jan 1, 2015
-
Consideration on Liquefaction Resistance of Ground Improved by the Sand Compaction Pile MethodBy Kazunori Matsushita, Masaru Sakakibara, Kenji Harada, Naotoshi Shinkawa, Mitsuo Nozu
The Sand Compaction Pile (SCP) method has been widely used as a typical countermeasure against liquefaction in Japan, and its effectiveness has been confirmed in many case histories of damages caused
Jan 1, 2017
-
TTMJ – The New System for Slurry (Diaphragm) Wall JointsBy Maurizio Siepi, Paul van Horn, John Coupland, Julian Crawley
"TTMJ is the acronym for the Slurry (Diaphragm) Wall Tension Track Milled Joint currently in development as part of the European Union's innovative and far-reaching Horizon 2020 initiative (FTI Pilot-
Jan 1, 2017
-
Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, WisconsinBy Edward Jacobsen
The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in
May 11, 2007
-
Novel Methods Of Restraining Embedded Retaining WallsBy Abid Adekunte
Traditionally, designers and contractors provide additional external supports to retaining walls through the use of tie-back anchors or braces. Both approaches are known to have their shortcomings; br
Jan 1, 2010
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KYBy Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Errata - Performance Of A Large Diameter Drilled PierBy A. J. Partos
Table 4, Page 311 Table 4 Experimental Parameters from Straight Line Interpretation of Mohr Failure Envelope [ ]
Jan 1, 1991
-
Piling Framed Tie down Concrete Retaining WallBy Saieb Haddad, Henry Pate
"Building retaining walls in an urban area is becoming more difficult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for ins
Jan 1, 2007
-
Piling Framed Tie Down Concrete Retaining Wall (4e2f4102-889f-44e0-a228-adb5cc7c450f)By Saieb Haddad, Henry Pate
"Building retaining walls in an urban area is becoming more diffi cult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for in
Jan 1, 2007
-
Providing External Confinement to Precast Prestressed Pile Shafts to Improve Ductility - ·Experimental ObservationsBy Andrew Budek
"Analytical and experimental work has shown that achieving the full inelastic lateral capacity of a pile may require the formation of a plastic hinge below ground level, in the pile shaft. The confini
Jan 1, 2005
-
Dynamic Load Testing Of Augered Cast-In-Place PilesBy Garland Likins
High strain PDA testing has become common for verification of capacity of both driven and bored piles. It is equally applicable to Augered-Cast-in-Place (ACIP) Piles. It also evaluates other aspects o
Jan 1, 2000
-
Flood Protection System for Infrastructures: Methodology and Instrumentation TestingBy Gisele R. Passalacqua, Taylor Malangone, Subhash Mahali
New York City is a busy metropolis with 8 million people. New York has the largest public transportation system with 6 million riders a day throughout the subway system. Keeping this infrastructure in
Sep 8, 2021
-
Design Equations For Laterally Loaded Piles Embedded In SandBy T. G. Davies
The paper presents design equations for singly laterally loaded piles embedded in sand. These equations were obtained from a comprehensive nonlinear analysis of free and fixed head piles subjected to
Jan 1, 2010
-
Turning the Valley of Ashes into a Tennis Haven: The Development History of the USTA Site in Queens, NYBy Athena C. Denivo, Pablo V. Lopez, Michael McMaster, Sissy Nikolaou, Alfred H. Brand
"The paper presents the history of development of the United States Tennis Association (USTA) site, focusing on geotechnical, geoseismic, and foundation engineering challenges associated with it. The
Jan 1, 2016
-
Driven Pile Foundation Design and Construction Issues for a Highrise Building in ManhattanBy Satyajit Vaidya, Rudolph Frizzi, Sandy Larimer
"This paper presents a case history in design and construction of a deep foundation system that included high-capacity open-ended driven piles constructed to support a high-rise building in Manhattan,
Jan 1, 2016
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017