Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Potash Ore Flotation Mechanism: Amine Molecules Adsorption or Amine Particles Attachment?

    By E. Burdukova

    Long-chain primary amines are utilized as collectors in potash ore flotation. Krafft temperature of long-chain amines in brine is about 100 °C, and this makes such amines practically insoluble in brin

    Jan 1, 2009

  • CIM
    Computational fluid dynamics analysis of different channel geometries in PEM fuel cell flow fields

    By A. M. Reyes

    Flow field hydrodynamics of serpentine flow channels was investigated numerically using computational fluid dynamics (CFD). The velocity profile simulated by the CFD model was evaluated with respect t

    Jan 1, 2005

  • CIM
    A selection of pressure loss predictions based on slurry/backfill characterization and flow conditions

    By Ferri P. Hassani, Riadh Bouzaïene

    "Selected methods of pressure loss predictions in horizontal slurry flow in pipelines are presented. For a given combination of flow velocity, solids concentration and particle size, the slurry and it

    Jan 1, 1992

  • CIM
    CFD Modeling of Methane Flame Interaction with a Simulated Longwall Coal Mine Gob

    By G. E. Bogin, C. Strebinger, J. F. Brune

    "Evidence shows that methane gas emanates from the mined-out area or gob of a longwall coal mine and can travel towards the working face, posing an explosion risk. Since the gob consists of varying le

    Jan 1, 2019

  • CIM
    Magmatic and Non Magmatic Ores

    By C. J. Sullivan

    It is of importance, in prospecting, to distinguish ores of magmatic origin from those derived by the meta-morphism and granitization of source rocks and from those accumulated in certain sedimentary

    Jan 1, 1962

  • CIM
    Geology of the Coleville Field, Saskatchewan

    By G. J. Hamilton

    "THE Royalite-Canada Southern Coleville No. 1 gas strike of August 15th, 1951, and the closely following low gravity black-oil strike of August 23rd, were the first of a series of recent oil and gas d

    Jan 1, 1952

  • CIM
    Integrity Monitoring Of Xstrata Copper's Kidd Metallurgical Division Mitsubishi 3-Line Furnaces Using Multivariate Methods

    By P. Nelson

    Extending the campaign life of the Mitsubishi furnaces at Xstrata Copper's Kidd Metallurgical Division Copper Smelter has been a major focus of attention for many years. One aspect of this effort

    Jan 1, 2007

  • CIM
    Binder Matrix Reactivity under CO2 Gasification: A Possible Explanation of the Anode Disintegration in the Eletrolysis Bath in Hall-Heroult Process

    By M. Fafard, F. Chevarin, D. Ziegler, H. Alamdari, M Kavand

    "Carbon anodes, used in the Hall-Heroult process, are consumed by the electrochemical reaction to produce metallic aluminum. It is also consumed by parasitic reactions with air and CO2. The carbon ano

    Jan 1, 2016

  • CIM
    Salt in Ontario

    By G. R. Guillet

    Salt is restricted to five major beds in south western Ontario, totalling as much as 200 m in thickness. These beds are located at depths ranging from 270 m to 750 m below the surface, fringing Lake H

    Jan 1, 1984

  • CIM
    A Transportation Challenge

    By R. E. Lawless

    The transportation challenge began with the need to move millions of tons of coal annually from Western Canada to Ontario. The paper will discuss the options which were available, the final mode selec

    Jan 1, 1979

  • CIM
    Integration of Robotics and Automation in Mine Design, Planning, and Optimization

    By J. Suarez

    The innovation initiatives for world-class mines today and in the future focus on automation and robotics in equipment and machinery. These innovations have benefited from the development of advanced

    Aug 1, 2013

  • CIM
    "Vanadium Recovery from LD Converter Slag by Means of HeterotrophicBacteria"

    By S. M. J. Mirazimi, F. Rashchi

    Recovery of vanadium from LD (Linz-Donawits) converter slag was evaluated by means of microbial leaching. Vanadium leaching was performed in two stages. In the first stage, the bacteria were grown in

    Jan 1, 2011

  • CIM
    Projet Manitou-Goldex

    ? Introduction ? Partenariat MRNF - MAE ? Goldex ? Manitou : - Ré-aménagement du bassin versant - Accès aux zones problématiques - Filtration du ruisseau pour les travaux - Nettoyage près de la

    Feb 1, 2008

  • CIM
    Modest improvements in tax rules

    By Robert B. Parsons

    "Although the April 19, 1983 federal budget appears to put greater emphasis on new or expanded government spending programs in an effort to get Canadians working again, the budget proposals contain a

    Jan 1, 1983

  • CIM
    Improving hoist safety and productivity: An expert system prototype

    By Deni Lessard, Roger Demers, Noël R. Billette

    "The Quebec Mining Association has for many years been supportive of the activities of the Centre de recherches minérales which were initiated to ensure regular production hoist and cable inspections

    Jan 1, 1992

  • CIM
    Inflation in project evaluation (05075753-63cb-41a5-ba9e-814572deac03)

    By L. D. Smith

    "Those who submit competing proposals for projects seek to present senior management with complete and fully supported material that will not fail under questioning. Hopefully, misleading notions and

    Jan 1, 1990

  • CIM
    Transforming the Effectiveness of the HPGR Circuit at Anglo Platinum Mogalakwena (d79eb18d-e357-499d-8b13-66f4047c738c)

    By N. Plint, M. Potgieter

    The Anglo Platinum Mogalakwena North concentrator was one of the first three hard rock mineral processing applications to utilise a HPGR circuit in preference to a SAG milling circuit. This was driven

    Jan 1, 2012

  • CIM
    In-the-hole drilling at Heath Steele Mines Limited

    By Errol Ladner

    The application of large-diameter bore holes in underground operations at Heath Steele was first tried in February, 1975. Since that time, 90,000 feet of 6-l/2-inch holes have been drilled, primarily

    Jan 1, 1979

  • CIM
    On the feasibility of mining peat for power generation in Canada

    By A. Ismail

    "The paper takes its material from three peat mining and power project feasibility studies sponsored by CANMET and conducted by Montreal Engineering Company Ltd. in the years 1976 to 1980. The role wh

    Jan 1, 1980

  • CIM
    Transient Liquid Phase Bonding of a Nickel Base Superalloy: Effects of Process Variables

    By O. A. Ojo, O. A. Idowu, N. P. Wikstrom, M. C. Chaturvedi

    Transient Liquid Phase Bonding (TLP) of a Nickel base superalloy, Inconel 738, was performed to study the influence of holding time, filler gap size, and temperature on the joint microstructure. Insuf

    Jan 1, 2006