Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mass Flow Prediction for Reagent Control at Les Mines Selbaie (eace00b2-88bf-4cb6-8ac7-61dd727f9e04)

    By C. Bazin

    "Discrete transfer functions which use the grinding circuit feed tonnage to predict mass flowrates at reagent addition points in the flotation circuit were calibrated using a dynamic grinding/flotatio

    Jan 1, 1993

  • CIM
    Why Projects Fail – An Overview on Operational Readiness

    By A. Khan, C. Ciriello, W. Oliveira

    "The purpose of this paper is to demonstrate the value of Operational Readiness (OR) in the successful delivery of capital projects. OR can be captured using several technical and practical definition

    Jan 1, 2016

  • CIM
    Mitigation of Plating Residue through Control of Anode Pitting During Nickel Electrodeposition

    By I. J. Burgess, B. C. Barlow

    "The electrodissolution of nickel pellets with different controlled electrical variables was investigated in an effort to mitigate plating residue in Watts bath based electroplating cells. During galv

    Jan 1, 2016

  • CIM
    The Copper Concentrate Market and Contract Terms Derivation

    By W. Andrew Falls

    Although we have yet to reach the midway point in the decade, the copper concentrate market has already witnessed some of the most volatile swings in history, moving from record high treatment and ref

    Jan 1, 1995

  • CIM
    Biodepression of Pyrite in Seawater Flotation

    By Francisca San Martin, Tomas Vargas, Willy Kracht

    "In Cu-Mo deposits it is usual to find considerable amounts of pyrite (FeS2). When processing this kind of ore by flotation, pyrite is rejected using lime to increase the pH to alkaline conditions (pH

    Jan 1, 2016

  • CIM
    Pulp-Lifter Flow Modeling Study in a Pilot Scale Mill and Application to Plant Scale Mills (a5b0bae6-30bd-456f-96a6-c4fcba893c43)

    By Simon Pelletier, Jose Delgadillo, Dave Page, Pramod Kumar, Raj Rajamani, Dilek Alkac, Martin Fillion

    "In general, many past works examine mill load, mill power, shell lifter design etc with a view to improving the mill capacity. On the contrary, only a handful of papers have addressed the transport o

    Jan 1, 2012

  • CIM
    Column flotation of galena at the Polaris Concentrator

    By G. A. Kosick, M. Freberg, L. A. Kuehn

    "Highly variable and higher than forecast lead miff feed grades were problems experienced at the Polaris Concentrator. Limited flotation capacity and poor operating flexibility prevented the plant ope

    Jan 1, 1988

  • CIM
    Evaluation of cable bolt supports at the Homestake Mine

    By F. Duan, J. Pfarr, J. M. Goris

    "The U.S. Bureau of Mines, in cooperation with the Homestake Mining Co. and the University of Utah, is conducting a field demonstration to evaluate the behaviour of rock masses supported with cable bo

    Jan 1, 1991

  • CIM
    Advances in Process Control of Sag Mills at Kennecott Utah Copper Copperton Concentrator (2012)

    By Jessica Hurst, Mark Holdsworth, Jeff McKay

    "In 2002, Kennecott Utah Copper Copperton Concentrator installed an Expert Control system for optimization of their SAG and Ball milling circuits. The advanced process control has been well received a

    Jan 1, 2012

  • CIM
    McIntyre Mine

    By Geo. D. Furse

    "The information that has accumulated regarding the geology of the McIntyre mine is the result of work by several geologists and, as might be anticipated, their conclusions have varied. The writer has

    Jan 1, 1954

  • CIM
    Productivity improvements for dragline operations using controlled blasting in a single- and multiple-seam opencast coal operation at Rietspruit, South Africa

    By W. A. Crosby, W. K. Smith, K. L. McDonald

    "IntroductionThis paper describes how the introduction of two blasting techniques and the resuItant development of new dragline digging methods have increased the productivity of single- and double-se

    Jan 1, 1983

  • CIM
    An Integrated Open Pit Optimization with Material Scheduling

    By George Dogbe

    Open pit optimization forms the basis of mine design, production planning and construction of mine facilities. The negative effects of this phase may include substantial reductions in ore recoveries,

    May 1, 2004

  • CIM
    Thin Spray-On Liners: The Development of a New Mining System

    By Graham Swan

    The case is presented for the development of a spray-on liner for ground support, but only in the context of a new mining system, consistent with the technical and business case advantages of liners c

    May 1, 2003

  • CIM
    Evaluation of the Thermal Induced Damage of Rocks

    By J. G. Kim, B. G. Chae, D. S. Cheon, E. S. Park

    The underground structures such as high-level radioactive waste disposal thermal energy storage should be designed and constructed considering thermal-mechanical characterization because of long term

    Jan 1, 2015

  • CIM
    A Framework for Crane Selection in Large-Scale Industrial Construction Projects

    By SangHyeok Han

    Selecting the best possible cranes and identifying spatial conflict-free locations on sites can result in productivity and safety improvements for large-scale industrial construction projects. In the

    Aug 1, 2013

  • CIM
    Give Your Electrical Mining Machines a Voltage Boost! Technology Update ? Voltage Regulation Systems for Mining Equipment

    By Tim Gartner

    This paper introduces a new application of a proven technology to provide dynamic, voltage regulation in underground mine electrical distribution systems. This technology acts to ?stiffen? the electri

    May 1, 2003

  • CIM
    The Ventilation Challenge ? A Canadian Perspective on Maintaining A Good Working Environment in Deep Mines

    By Stephen G. Hardcastle

    Worldwide, metal mines are going deeper. For example in Canada there are six such mechanized mines planning production at 3000m (10,000?). Working at such depths challenges all aspects of mining inclu

    May 1, 2003

  • CIM
    Chuquicamata: Quality Challenges throughout 100 Years of Copper Electrorefining and Electrowinning

    By J. C. Salas, A. Weishaupt, J. A. Guzman

    The origins of the electrorefining process date back to 1869, when the first ER cathodes were produced at Pembrey, South Wales. By the time that Pembrey was closing, Chuquicamata tank house was under

    Jan 1, 2019

  • CIM
    Analytical and Laboratory Modelling of Shear Behaviour of Regular Rock Joints under Constant Normal Stiffness

    By A. Haque

    "This paper describes an improved formulation of an analytical shear strength model developed by Haque & Kodikara (2012) by incorporating the failure of regular concrete/rock joints subjected to CNS c

    Jan 1, 2015

  • CIM
    Uranium deposits South Limb of the Quirke syncline Elliot Lake, Ontario

    By F. Q. Barnes

    "Uranium, thorium and yttrium have been recovered, since the 1950s, from pyritic quartz-pebble conglomerates occurring in the basal sediments of the Quirke syncline at Elliot Lake. Gold, an element of

    Jan 1, 1986