Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Improving the Performance of the Hardy Cross Algorithm for Large Ventilation Models"The Hardy Cross algorithm offers a reliable method of solving network systems of fluid flow and has become widely used for solving water and ventilation flow networks. A limitation is that computatio
Jan 1, 2019
-
Phase Composition, Structure and Manufacturability of New Eutectic Alloys Based on the Al-Ca-Zn-Mg SystemBy M. A. Vasina, I. A. Matveeva, E. A. Naumova, V. V. Doroshenko, N. A. Belov
"Using the calculated (Thermo-Calc software) and experimental methods (SEM, TEM, EMPA, DSC, XRD, etc.) the phase composition, structure and hardening of aluminium alloys of the Al-Ca-Zn-Mg system were
Jan 1, 2018
-
The Production of High-Purity Niobium Oxide from Pyrochlore-Perovskite ConcentrateBy F J. Kelly
A chemical process, based on laboratory investigations, is proposed for the production of high-purity niobium oxide from a pyrochlore-perovsk1te flotation concentrate produced from ore obtained at the
Jan 1, 1965
-
An Efficient Recycling Process of Rare Earth Metals Using Ionic LiquidsBy M. Goto, F. Kubota
"In this study, we show the successful separation of rare earth metals, which are indispensable elements for the high-tech industry, from a solution containing a metal mixture by using a liquid-liquid
Jan 1, 2012
-
Extracting Gold from Gravity Concentrates Using Grinding and SievingBy G. Clarkson, M. Hitch, R. Clarkson
"A novel reagent-free method of extracting gold from gravity middling concentrates in the Yukon placer fields is presented in this paper. This method exploits the malleability of gold by submitting co
Jan 1, 2017
-
Elk River CollieryBy W. C. Whittaker
COMPLETED in November, 1943, at a cost of over $1,500,000, Elk River colliery of the Crow's Nest Pass Coal Company, Limited, has been laid out and equipped for an ultimate annual production of 1,
Jan 1, 1944
-
The Turner Valley Oil-FieldBy G. R. Elliott
Foreword The office of the Supervisory Mining Engineer, a branch of the l. Federal Government, is financially interested in no oil company and has no stock to sell. This office, however, is deeply
Jan 1, 1930
-
An Integrated Process for Separation and Purification of Rare Earth Elements in Chloride MediumBy Patrick Wong, Gareth Hatch, M. A. Halim, V. I. Lakshmanan, Darcy Tait
"This paper describes development of an integrated chloride process for separation and purification of REEs. The process includes atmospheric leaching of ore/concentrate with mixed chloride lixiviant
Jan 1, 2016
-
Setting and Genesis of Uranium Mineralization at RexsparBy V. A. Preto
The Rexspar uranium deposit is located approximately 5 kilometres south of Birch Island, B.C. Three separate zones of commercial-grade uranium mineralization mineable by open pit have been outlined.
Jan 1, 1978
-
Recycling of End-of-Life Waste CD/DVD as a Carburizer in Processing of Fe-C AlloysBy R. Khanna, I. Mansuri, S. Devasahayam
"Recycling polymer based end-of-life materials as carbon resources for a partial replacement of coke/coal can make important contributions towards enhancing the environmental sustainability of steelma
Jan 1, 2012
-
Truck Selection and Application at HiltonBy L. Price, R. Hortie
Movement of ore and waste from the Hilton Mines pit is accomplished by truck haulage. With the aim of reducing costs, a study of truck fleet replacement was initiated. The study included on-site short
Jan 1, 1971
-
Mine Engineering at Gaspe CopperBy J. B. Watts
"THE Mine Engineering Department at Gaspe Copper is staffed by a chief engineer, assist-ant engineer, research engineer, chief surveyor, four instrument men, chief bonus clerk, draftsman, and a helper
Jan 1, 1959
-
Government and the Mining IndustryBy Allan F. Lawrence
"I AM SURE you do not expect from me any learned dissertation on the problems and opportunities of the mining industry. Y our program committee must have recognized my limitations when issuing the inv
Jan 1, 1968
-
Changes in the Converter Slag Chemistry Due to the Southern Peru Ilo Smelter ModernizationBy J. Suarez Condezo, E. Herrera Alarcon
The Ilo Smelter Modernization Project will require treating the slag from the Peirce Smith converters in Slag Cleaning Furnaces using pig iron technology. Currently the slags from the converters show
Jan 1, 2007
-
The Use of Qemscan for Ore Characterization"The QEMSCAN system is the third generation of automated mineral analysis systems that began with the QEM*SEM at CSIRO 30 years ago (Butcher et al. 2000). It is now a successful commercial instrument
Jan 1, 2012
-
Reconditioning the Howey ShaftBy R. R. Bassermann
THE property of Howey Gold Mines, Limited is situated at Red Lake, Ontario, one hundred and seventy-five miles east of Winnipeg and eighty miles north of the Canadian National Railway line. The mine h
Jan 1, 1935
-
Risk Identification Expert System for Metro Construction Based on BIMBy Limao Zhang
This paper presents a BIM-based Risk Identification Expert System (B-RIES) for metro construction, composed of three main built-in subsystems: BIM extraction, knowledge base management, and risk ident
Aug 1, 2013
-
Production of Copper Sulphate from Mine-Water PrecipitateBy A. G. Lylie
Introduction At the Britannia Mining and Smelting Company's mill, the equivalent of 2,500 to 2,800 pounds of copper sulphate crystals per day is made from copper which is precipitated from the m
Jan 1, 1951
-
Aunor MineBy B. S. W. Buffam
"The property of Aunor Gold Mines, Limited, is in Deloro township, Ontario, about 3 miles southeast of Timmins. It consists of a group of eleven claims between the Buffalo Ankerite and Delnite mines.I
Jan 1, 1954
-
A New Method for Sampling Diamond-Drill Core: Fillet-CuttingBy E. Bonsall, J. J. Brummer, A. R. Graham
"A method and device are described for sampling diamond-drill core by cutting a continuous fillet of constant cross section from the cylindrical surface of the core throughout appropriate sample lengt
Jan 1, 1968