Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The North American Iron Ore Industry A Decade into the 21st Century

    By J. D. Jorgenson

    ?? U.S. domestic production peaked at 120 Mt during years of the Korean Conflict120 Conflict ?? Pellet production increased, as highPellet high-grade ores decreasedores decreased ?? Until 1982 reces

    May 1, 2011

  • CIM
    Operating Experience and Developments of G-Rex and Aurix100 Resin Exchange Technology

    By Peter Richards, Alexander Lewis-Gray, Mark Davies, Nicholas Katsikaros

    "Gekko Systems developed the Gekko Resin Exchange Column (G-REX) in order to optimise the recovery of gold in complex leach-to-electrowinning processes, as an intermediate step using a highly gold-sel

    Jan 1, 2016

  • CIM
    Evaluation of Ventilation On Demand (VOD) in Sudbury Mines

    By G. Lyle

    Since its inception CEMI (Centre for Excellence in Mining Innovation) has focused on facilitating innovative solutions to the mining industry in six strategic research areas; GeoRisk, ConstructMine, V

    Oct 1, 2010

  • CIM
    Sill pillar recovery at the Louvicourt mine

    By D. Fleury

    "This paper describes the challenges of mining a sill pillar under various types of paste backfill quality. From 1994 to 2002, Louvicourt mine produced approximately 12,600,000 t grading 3.5% Cu, 1.5%

    Jan 1, 2005

  • CIM
    Economic Evaluation of Activated Carbon for Gold Milling Circuits

    By M. Drozd, M. Somppi, Z. Yamak

    "Granular activated carbon is widely used in the gold mining industry for gold extraction from aurocyanide-containing slurry. The extraction process can employ carbon as part of the gold recovery oper

    Jan 1, 2017

  • CIM
    Observation of Ore Pass System Performance at Brunswick Mine

    Brunswick Mine employs an ore and waste pass system for material transfer. This paper reviews the evolution and performance ore pass systems at the mine. It presents the range of selected configuratio

    Feb 1, 2008

  • CIM
    Significant Improvements are Possible from Process Optimization

    By Jon R. Maki

    "EVTAC, an iron ore mine in Minnesota, had trouble meeting the customer’s pellet silica requirements. In addition, the mine plan was moving towards a lower grade ore and funding was not available for

    Jan 1, 2014

  • CIM
    Electrical and environmental protection of high- and low-voltage mine cables

    By R. W. Mei, R. A. Strombom, D. J. Moore

    "Heat-shrinkable cable accessories are solving problems in the mining industry. This paper describes a range of products used by the industry, including low-voltage splices, high-voltage splices to 8.

    Jan 1, 1980

  • CIM
    Geochemical and geophysical gold exploration in the Timmins area, Ontario: a case history

    By A. Philipp, A. S. Middleton, G. A. Harron, A. B. Durham

    "Basal till sampling techniques were used to search for gold mineralization in the Timmins, Ontario area. During 1978 and 1979, approximately 90 overburden sampling drill holes were completed in Murph

    Jan 1, 1987

  • CIM
    The Performance of Mesh, Shotcrete and Membranes for Surface Ground Support

    By E. C. Morton

    The Western Australian School of Mines (WASM) has developed a facility for the static testing of large scale ground support elements. The samples are loaded using a mechanical screw feed jack. Instrum

    May 1, 2009

  • CIM
    Comparision of Two Sizes of FSFs in the Glogów Copper Smelter

    By L. Garycki, P. Poks, R. Urbaniak, T. Gabka

    In 2016 at Głogów Copper Smelter KGHM Polska Miedź S.A., after shutting down the shaft furnaces new FSF was launched. Currently, it is the only smelter with two direct to blister flash smelting furnac

    Jan 1, 2019

  • CIM
    New bearing application for pinion gear drives on mine hoists

    By R. A. McIvor, R. Levac

    "The Stobie No. 7 shaft, 14 ft diameter, double- drum skip hoist, was installed at the INCO Limited Frood Stobie Complex in 1942. Figure 1 shows the hoist layout. The hoist was originally equipped wit

    Jan 1, 2001

  • CIM
    Obtaining metallurgical data from drill core samples using a mini pilot plant

    By Nilce Alves Santos, Vânia Lúcia de Lima Andrade, Keila Lane Carvalho Gonçalves, Harold Wyslouzi1

    "When confronted with the difficult decisions on advancing an exploration project to the feasibility and construction stages, it is important to know how various regions of the ore body will react in

    Jan 1, 2002

  • CIM
    Fuel cell risk assessment, regulatory compliance, and implementation of the world’s first fuel cell-powered mining equipment at the Campbell Mine (2f329a25-0d4f-40d5-a572-5230f6f201ab)

    By T. MacKinnon, M. C. Bétournay, D. Eastick, F. C. Delabbio, C. Graves

    "The successful implementation of a new technology in an underground production mine requires many challenges to be overcome. These challenges include mine hardening of new technology, mitigation of s

    Jan 1, 2005

  • CIM
    The Horne Mine: Geology, History, Influence on Genetic Models, and a Comparison to the Kidd Creek Mine

    By Sergio Cattalani, David J. Kerr, Harold L. Gibson

    Abstract - The Horne mine was truly a world class Cu and Au deposit. Between 1927 and 1989, it produced some 260 t of Au and 1.13 Mt of Cu from 53.7 Mt of ore that averaged 2.22% Cu, 6.1 g/t Au and 13

    Jan 1, 2000

  • CIM
    The Dragon of Mining

    By Jonas Olsson

    "The picture of China as an antiquated continent is changing rapidly and fast-forwarding progress is a fact in most infrastructural fields. Mining is not an exception. China is today the largest produ

    Jan 1, 2006

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis, B. Sambirsky, J. Werner

    A mine’s inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. The inh

    Jan 1, 2004

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis

    A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th

    Jan 1, 2004

  • CIM
    Iron in Arsenic Removal - From Traditonal Arsenic Precipitation to Novel Electrochemical Processes

    By M. Arvola, A. Mäkinen, N. Isomäki

    Arsenic is a compound that has no significant market value. However, it needs to be removed from ores, concentrates and other process streams because of environmental or technical processing concerns.

    Jan 1, 2016

  • CIM
    Low PH Trial in the Ernest Henry Mining Copper Rougher Flotation Circuit (db4a4353-e70f-4fb2-9b3d-7daf6f017863)

    "The Ernest Henry Mining (EHM) ore body is an iron oxide copper gold deposit with an average grade of 1.1 percent copper, 0.5 g/tonne gold and 22 percent magnetite. At the end of 2009, EHM converted t

    Jan 1, 2014