Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mine Data Analytics – New Skills Required for Tomorrow’s Mines

    By P Knights

    This paper examines the process and specialised skills required to extract insight from data routinely collected by mine operations, maintenance, engineering and environmental departments. Typical ins

    Nov 22, 2011

  • AUSIMM
    Durability Planning for Underground Infrastructure

    By D Wimpenny

    Underground infrastructure is often a critical component of transportation and utility schemes. It is characterised by long design lives with limited access for inspection and maintenance. The exposur

    Mar 8, 2011

  • AUSIMM
    The Ore-Deposits of Captain's Flat, New South Wales

    The revival of the mining industry at Captain's Flat after a long period of years of inactivity has attracted attention to the importance of the ore-deposits of that field as potential sources of

    Jan 1, 1941

  • AUSIMM
    Unlocking resource confidence in coal through use of conditional simulation

    By B Haase, R Saha

    Conditional simulation (CS) has been extensively used in metal industry to assess uncertainty of geo metallurgical variables to build robust distributions around grade tonnages across different time h

    Mar 22, 2022

  • AUSIMM
    The Impact of Fluidised-bed Flotation for Treating Coarse Sulfides

    By H Thanasekaran, M J. Mankosa, J N. Kohmuench, G H. Luttrell

    "Fluidised-bed flotation has been demonstrated over the last 16 years as an effective method for improving the flotation recovery of coarse particles. This technology has been successfully deployed in

    Oct 10, 2016

  • AUSIMM
    Monitoring Haul Truck Operator Fatigue Using Gyroscope Data

    By L van Latum, A Koh, I Thomas

    Haul truck drivers are at a high risk of developing fatigue due to the monotonous nature of the work and demanding shift rosters. In the mining industry, fatigue is identified as a major contributing

    Sep 26, 2011

  • AUSIMM
    Quantification of Drill Hole Deviation – Century Mine Case Study

    By C D. Pocock

    Maintaining catch berm capacity in open pit mines through controlled blasting prevents production delays associated with managing risks associated with wall instability. A method has been developed to

    Nov 8, 2011

  • AUSIMM
    Thin Spray-on Liner Concepts and Practical Examples of the Non-Reactive System - MEYCO TSL 865

    TSL Concepts and Practical Examples of the Non-Reactive System - Meyco TSL 865 Thin Spray-on Liners (TSLs) have been intensively investigated by mining and chemical industries within the last decade.

    Nov 25, 2010

  • AUSIMM
    Lead Purification by Crystallization and Reflux

    By Walters GW

    A countercurrent method of metal refining using crystallization and reflux is discussed. 4n account is given of the development of this technique for the separation of silver and bismuth from lead

    Jan 1, 1975

  • AUSIMM
    Flotation machine gas characterisation – variation between different types of flotation machines

    By D Felipe, G J. Harbort

    In the past 40 years substantial changes have occurred in flotation machines. This has included increases in mechanical cell size to 630 m3 , significant changes to flotation column aeration design

    Aug 24, 2022

  • AUSIMM
    Flow field investigation of high gravity spirals using experimental and CFD techniques

    By R M. Yanamandra, S K. Tripathy, N Mangadoddy, P Sudikondala, P Ankireddy

    Spiral concentrator is one of the most commonly used gravity concentration devices in mineral processing. The particles are classified based on their specific gravity and size. The present work analys

    Aug 24, 2022

  • AUSIMM
    Ventilation Upgrade at the FrogÆs Leg Mine - Case Study

    By A Llewellyn, M Varvari

    The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.

    Jul 1, 2013

  • AUSIMM
    Using Value at Risk for Integrated Project Risk Evaluation

    By W Stange

    Assessing the risks in a mining project is a key aspect of project evaluation. This is an exacting and demanding task because of the complexity due to the need to deal with uncertainty over long time

    Jan 1, 2009

  • AUSIMM
    Rheological Controls on the Geometry of the Currawong Volcanic-hosted Massive Sulfide Deposit, Lachlan Fold Belt, Victoria, South-east Australia

    By D Macklin, R Hammond, T G. Blenkinsop

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Base metal sulfides at the Currawong volcanic-hosted massive sulfide deposit in the Lachlan

    Mar 18, 2015

  • AUSIMM
    Sustainable production from rehabilitated coal mine pastures in southern Queensland’s Brigalow Region – Acland grazing trial results

    By J Eberhard, C Paton, J Bennett, C Baillie, A Melland, J F. Clewett, T Newsome

    A central aim of rehabilitation is to ensure that disturbed land is returned to a post-mine condition that is safe, stable and self-sustaining. This paper describes initial results from a grazing tria

    Jul 25, 2018

  • AUSIMM
    Harnessing data complexity – how machine learning applies all project data for accurate resource modelling

    By S Sullivan

    A recent review of resource reports lodged to statutory bodies found geological models with oversmoothed or unrealistic lithological boundaries, many of which do not represent geological appearance in

    Mar 22, 2022

  • AUSIMM
    Development of the Argo Mine

    Peko Mines, a Division of Peko-Wallsend Operations Limited (PWOL) has operated several small underground mines in the Tennant Creek district of the Northern Territory supplying ore to a central t

    Jan 1, 1986

  • AUSIMM
    Environmental Auditing as a Driver for Continuous Improvement in Environmental Performance (ede55e7e-c054-4fc6-ae90-dd762e66d692)

    Continuous improvement in environmental management assists in the achievement of sustainability goals for the mining and processing of minerals. The use of regular internal environmental audits (score

    Jan 1, 2004

  • AUSIMM
    Effluent Treatment System at Pasminco Metals - EZ

    By Plamer D. J, Newman O. M G

    The Effluent Treatment System at Pasminco Metals - EZ (PMEZ) was commissioned in December, 1991 and has operated satisfactorily, ensuring that aqueous discharges from PMEZ comply with the Tasmanian

    Jan 1, 1993

  • AUSIMM
    Metal Balance for Olympic Dam Using a Standard Industrial Software Package

    By R Gilbertson, N Freeman

    Metallurgical accounting is key to the control and production planning process of any mining operation. This is even more crucial for complex operations involving mining, concentration, smelting, refi

    Jan 1, 2002