Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Size Classification at the Mt. Newman Mining Beneficiation Plant

    By Groves J

    The sizing and classification circuits at the Mt. Newman Beneficiation Plant have performed satisfactorily. Investigations have been aimed at solving minor problems and achieving small' impro

    Jan 1, 1984

  • AUSIMM
    Tunnel Design in an Alliance for Waterview Connection, New Zealand

    By D Maconochie, S Pradhan, M Reed

    The Waterview Connection will provide a high-quality strategic alternative to State Highway One and complete Auckland’s Western Ring Route connecting State Highways 20 and 16. The project includes twi

    Sep 17, 2014

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal using the Parry Process

    A pilot plant has been constructed for the low temperature carboni-zation of Wallarah (N,S,W6) coal at the rate of 300 pounds per hour. The plant was built and tested at Australian Mineral Development

    Jan 1, 1963

  • AUSIMM
    Reaping the First Fruits – Infrared Spectroscopy: the New Standard Tool in BHP Billiton Iron Ore Exploration

    By M Haest, O Dominguez, D Mittrup

    With the current focus in the mining industry on reducing costs, while simultaneously improving ore quality, infrared spectroscopy is a tool that can potentially assist companies to meet both challeng

    Jul 13, 2015

  • AUSIMM
    Liquefaction behaviour of tailings under cyclic simple shear testing

    By A Li, H Jinto, M Laxman

    The behaviour of tailings under cyclic loading has an impact on the stability and deformation of tailings dams and a good understanding of the cyclic behaviour of the tailings under earthquakes is imp

    Jul 23, 2018

  • AUSIMM
    Tunnel Groundwater Inflow Measurement

    By R Witt, M Lowing

    Tanking of tunnels is now often specified when inflows exceed as little as 1 L/s/km with a unit distance of 100 m. To demonstrate inflows over a 100 m segment of a tunnel are less than 0.1 L/s with a

    Jan 1, 2008

  • AUSIMM
    Two Transit Levels in One Tunnel Tube – An Innovation in Barcelona Metro Line 9

    By R Justa Cámara, L M. Pinillos Lorenzana

    Barcelona Metro Line 9 (Line 9) is an essential infrastructure, improving the transversal transport in Barcelona by connecting the greater part of the currently existing radial lines. The purpose of L

    Sep 17, 2014

  • AUSIMM
    The Social Aspects of Environmental Impact Studies in Queensland

    By Morgans DJ

    The aim of this paper is to highlight the social aspects involved in the preparation of environmental impact studies (E.I.S.'s) for mining developments. In particular, the paper will reveal t

    Jan 1, 1987

  • AUSIMM
    Perspectives on Future Global Collaboration for Mining Research and Education

    By M Scoble

    This paper addresses the importance of collaborative approaches to resolving future mining challenges. It attempts to provide some insight into understanding the theory, measurement, mapping and manag

    Nov 22, 2011

  • AUSIMM
    Conversion of a Pelletising Induration Furnace from a Haematite to Magnetite Feed

    By R Jones

    OneSteel Whyalla’s grate-kiln-cooler pelletising plant was commissioned in 1968 processing haematite feed from the local South Middleback Ranges mining area. The existence of a magnetite resource bene

    Jul 11, 2011

  • AUSIMM
    An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine

    By M Kent, D Elder, J Woodward, R Edwards, B Catto

    At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine

    Sep 20, 2017

  • AUSIMM
    Three-Dimensional Geometallurgical Data Integration for Predicting Concentrate Quality and Tailings Composition in a Massive Sulfide Deposit

    By R Knight

    The spatial variability of geometallurgical characteristics in a mineral deposit can have significant impact on financial and mine planning, mineral processing, concentrate quality and tailings compos

    Sep 5, 2011

  • AUSIMM
    Improved sustainability through WHIMS Plant addition at Roy Hill

    By C Jenkins, J Jasper, Y Suryaputradinata, S Lozyk, M J. Hartmann

    The primary objective of mining companies is to function as a profitable business by delivering products that fit customer requirements in a safe and sustainable manner. Optimum resource utilisation i

    Nov 8, 2021

  • AUSIMM
    Iron Ore Washing – Achieve More with Fewer Resources

    By M Zlatev, S Silge

    Producers of primary resources such as iron ore face the challenge of processing crude materials with increasing levels of impurities, which may result in the requirement for wet processing. This resu

    Jul 13, 2015

  • AUSIMM
    New Microscope Laboratory at Mount Isa

    Early in 1950 a new laboratory was set up to deal with problems in mineragraphy, petrology and metallography. This paper describes the equipment, the organisation and association of the laboratory wit

    Jan 1, 1953

  • AUSIMM
    Use of the Logical Framework Approach to Establish a Simple Sustainable Development Framework for Application to a Proposed Mine at Aurukun on Western Cape York

    This paper describes the development of an approach to sustainable development for application at the feasibility study stage for a proposed bauxite mine near the community of Aurukun, south of Weipa

    Jan 1, 2009

  • AUSIMM
    The Contribution of Geological Surveys to Mineral Exploration in Australia

    In this year marking the centennial of the Geological survey of Western Australia, it is appropriate that we should review the value of the contribution of the Survey, and Australian Geological Su

    Jan 1, 1988

  • AUSIMM
    Sustainable Phytostabilisation of MineTailings - A Critical Analysis of System Requirements and Approaches

    By T Baumgartl, M Edraki, L Huang, D R. Mulligan

    "Phytostabilisation with tolerant plant species has been advocated as a cost-effective solution for sustainable cover of tailings from metal mines and bauxite refinery. The development of sustainable

    Jul 10, 2012

  • AUSIMM
    Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based Simulators

    By P Wood, S Leveritt

    This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy

    Sep 18, 2012

  • AUSIMM
    Greater Use of Geoscan On-belt Analysis for Process Control at Sepon Copper Operation

    By T D. Jolly, L A. Balzan, A R. Harris, Z Bauk

    "The availability of real-time data in any process control system is critical for effective management of that system. At MMG LXML Sepon Copper Operation in Lao PDR, controlling the copper grade of th

    Oct 10, 2016