Improving the Reliability of Machines and Systems Used in the Production Processes, Automation and Control Technologies.British Coal has made a practical progressive approach to improving the reliability of its mining equipment. Reliability must be addressed at the specification stage but does not end there and routine
Jan 1, 1991
-
Improving Blasting Outcomes Using SoftLOAD<sup>«</sup> Low-Density ExplosivesSasol Roche Blasting Services (SRBS) and its former owners have been in the process of developing and utilising low-density explosives over the last ten years. Many blasts have been fired in varying s
Jan 1, 2004
-
Pre-Charge Coke Screening and Weighing at Newcastle No.3 Blast FurnaceBy De Jong HJ
During the forthcoming reline of No.3 Blast Furnace at the Newcastle Steelworks of the Broken Hill Proprietary Co. Ltd., facilities for the screening and weighing o' coke will be installed. T
Jan 1, 1984
-
Engineering for Mining InfrastructureInfrastructure is defined as all those parts of a mining development which are not directly concerned with mining and mineral processing. Infrastructure is of significant and growing importance in
Jan 1, 1974
-
Mineral Exploration ManagementA mineral exploration manager's prime function is to provide a frame- work within which new mine production can be achieved. As part of this framework, the manager should know his employerb fu
Jan 1, 1980
-
Slope Stability Analysis at Granite Quarry With Complex Geological Structure ù Case Study at Granite Quarry, Karimun Island, IndonesiaBy B Sulistianto, D Carrugan a, R K. Wattimena
Geological structure at PT Karimun Granite Quarry, in Karimun Island û Indonesia, has three primary joint sets that cross between them. These primary joint sets are the principal factor influencing th
Jan 1, 2003
-
Fluid-Dynamic Aspects in Blast Furnace with Gas Injection into the StackBy Quintiliani G, Giordano V
A research field of interest and a topical subject with the aim to reduce a considerable amount of coke in ironmaking is the injection into blast furnace stack of hot reducing gas combined with use o
Jan 1, 1975
-
Assessing Ore Loss and Ore Dilution ù Quantifying the Effects of Geological and Technical UncertaintiesBy P A. Dowd
This paper describes an integrated approach to the evaluation of ore loss and ore dilution via geostatistical simulation of in situ geology and grade characteristics, simulation of blasting mechanisms
Jan 1, 2004
-
The Century Zinc-Lead Deposit, Northwest QueenslandBy Andrews S. J
Century is a shale hosted zinc, lead, silver deposit developed within gently folded, Proterozoic Lawn Hill Formation shales and siltstones, approximately 250 kilometres north-northwest of Mount Isa, c
Jan 1, 1993
-
Are Mining Geologists Really Necessary?Alternatively are they a necessary evil'? Exploration geologists are a much higher profile group but then again the higher they are the bigger they Bill. At a mine site they are reluctantly being
Jan 1, 1997
-
Lady Loretta - A New Approach to an Old OpportunityBy C R. Fountain, W R. Cannings
The zinc-lead-silver mineral resource at Lady Loretta ranks amongst the worldÆs richest when measured in terms of in situ metal grades. However, the project remains undeveloped 28 years after its disc
Jan 1, 1998
-
Seismic Studies and Numerical Modelling at the Homestake Mine, Lead, South DakotaBy Filigenzi M. T
Stresses around mine openings at depth can cause the surrounding rock to fail, releasing stored strain energy. When this happens, the rock may literally explode or `burst' into the opening with
Jan 1, 1995
-
The Evaluation of Alternative Comminution and pretreatment Arrangements for the Woodcutters Mine, NTBy Watsford R. M S, Hutton R
Following the delineation of significant extra ore reserves during 1990, the decision was made to expand production from 350,000 tonnes of run of mine ore per year to initially 600,000 tonnes increa
Jan 1, 1991
-
Coal Mine Face Area VentilationOne of the most difficult places to ventil ate in any mine is the working face area of an advancing mine heading. With an ever changing configuration, continual modification and extension to the ve
Jan 1, 1983
-
Water treatment in perpetuity – or not?By R J. Higgins, M Edraki
What is the meaning of the Life of a Mine (LOM) if that mine results in a requirement for water treatment in perpetuity? ‘In perpetuity’ is of course a duration with no relationship to a Life-of-Mine
Jul 25, 2018
-
The Design Of A Sand Pump For Optimum ResultsThe design of a sand pump is similar in principle to that of a water pump but differs in several areas. Results of experiments on sand pump performance have been summarized and values of design par
Jan 1, 1973
-
Seminar Keynote AddressTo reflect on the early history of mining in South Australia requires considerable imagination and rashness. The people who were the chief actors in the scene have long since passed away. Accounts
Jan 1, 1987
-
Western Deep Levels South - A Technical ChallengeBy Lloyd F, Bayley F. J
The new South Mine in the Western Deep Levels complex is destined to become an ultra deep project extending to depths of 4 200 m below surface and where rock temperatures are likely to exceed 65 ¦
Jan 1, 1988
-
Load Transfer Mechanisms in Reinforcing TendonsBy Tarrant GC
Cement and resin encapsulated tendons are widely used in the stabilisation of mine roadways. One of the main factors in controlling the efficiency of the reinforcement is the ability of the tendon
Jan 1, 1992
-
Planning, Investigation and Preliminary Design for the Eastern Distributor Tunnels - SydneyBy Chappel R. A, Fishburn B. R
The Eastern Distributor Tunnels - the first major road tunnel project in Australia - are the preferred solution to traffic congestion problems, when compared with alternatives, in this inner urban
Jan 1, 1987