Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Precision Analysis of Iron Ore Sampling, Preparation and Measurement -Overcoming Deficiencies in the Current Standard ISO 3085At Cliffs Natural Resources Ltd (CNR) crushing and shipping sample stations, precisions are estimated for the sampling, preparation and measurement stages of iron ore sampling in accordance with ISO 3
Mar 1, 2010
-
Predicting Iron Ore Fines Shipment MoistureBy J E. Everett, D Linden, P Maney
In response to the implementation of a new schedule for iron ore fines in the International Maritime OrganizationÆs (IMO) International Maritime Solid Bulk Cargoes (IMSBC) Code, improved measures for
Aug 12, 2013
-
Reducing the environmental and economic cost of metal extraction by optimal blast designBy A Tsang, D La Rosa, L Julian, W Hunt, R Pratama
Mineral extraction is facing the twin challenges of finite resources and increasing environmental and economic costs. Society’s growth is matched by an increase in demand for the earth’s resources. It
Sep 1, 2024
-
Kempfield Silver, Barite and Base Metal (Pb-Zn) Deposit, Lachlan Orogen, Eastern AustraliaBy D Timms
The Kempfield deposit is located in the Hill End Trough, one of several intracratonic basins developed during Silurian–Devonian time, in the eastern province of the Lachlan Orogen, Eastern Australia.T
Aug 22, 2011
-
Improving the dewatering efficiency of clay-rich tailings in saline waterBy D Liu, M Edraki, L Berry
The presence of clay minerals slows down the settling rate and mitigates compact consolidation efficiency in tailings dewatering. The increasing use of saline water in many plants, affects the dewater
Jul 23, 2018
-
Gold-Silver Vein Mineralisation at Cononish, ScotlandBy I M. Platten, C J. S Sangster, Y Xie, S C. Dominy
Cononish is a steep, narrow NE-SW trending vein system that was emplaced into late Proterozoic metasediments. It shows brittle style deformation and postdates metamorphism and associated Caledonian fo
Sep 26, 2013
-
Coal Pillar Design Criteria for Surface ProtectionLarge areas of ground are permanently supported on coal pillars, both in extensive old workings and current drivages in active mining operations. Continued growth of civil infrastructure is resulting
Jan 1, 2005
-
Development of a Low-cost Instrument for Barometric Pressure SurveysBy A S. Derrington
High-accuracy, solid-state digital reference barometers have proven to be well suited to conducting underground barometric pressure surveys. The only problem is their expense; at least A$4000 each. Fo
Aug 31, 2015
-
Using an undisturbed landform to calibrate long-term predictions of the evolution of a rehabilitated landformBy G R. Hancock, M J. Saynor, J B. C Lowry, K G. Evans, M Narayan
Tools such as landform evolution models (LEMs) provide a means of predicting how a landform may evolve over extended periods of time. Here, we utilise the CAESAR-Lisflood LEM to assess a proposed reha
Jul 25, 2018
-
Gold Dredging In New ZealandThe history of gold dredging in New Zealand, leading to the develop- ment of the `New Zealand Type' dredge is considered. Much of this infor- mation has come from contemporaneous publications by
Jan 1, 1988
-
The Benefits of Technology Partnerships during Brownfield UpgradesBy S Morgan, L C Pagdalian, S Serdzeff, C Malaloy-on
It is widely accepted that mineral deposits are decreasing in metal grades. To remain profitable and meet market demand, mining companies are expanding their operations by increasing the tonnage treat
Sep 1, 2014
-
Dreams of Futures Past – Curating Post-mining LandscapesBy P A. Kirsch, A Hine
Mining is a major global industry that requires the moving of considerable volumes of earth and rock (overburden) to win the valuable ore prior to mineral extraction and processing. As a result of thi
Jul 16, 2014
-
Water Production Simulation Tool for Coal Seam Gas Operations in Bowen and Surat BasinsBy R Strand, L Reading, G Keir
A major challenge in managing coal seam gas (CSG) water is predicting how much water will be produced as the industry develops. Klohn Crippen Berger Ltd (KCB) was commissioned by the Queensland Depart
Nov 26, 2013
-
Maximise Orebody Value through the Automation of Resource Model Development Using Machine LearningBy S Oliver, D Willingham
"Although a resource model is central to the mineral resource value estimation process (Glacken and Snowden, 2001), creating it is a labour intensive task and in the end it is a limited representation
Jun 15, 2016
-
Towards Tomorrow’s ‘Smart Mine’ – Embedded Sensor Telemetry and Sensor-Based SortingBy B Klein
This paper stems from research and development in sensor and sorting technologies towards future sustainable mining undertaken by the UBC Mine-Mill Integration group in collaboration with MineSense Lt
Nov 22, 2011
-
New Innovations in Field Portable X-Ray Fluorescence for the Iron Ore IndustryBy S Bailey
In-field sampling programs generally take time, equating to money, and unless you have an onsite laboratory, you have the issue of having to wait long periods for your data. Until recently, field port
Jul 11, 2011
-
Realising the Potential of the Boolgeeda Iron Formation – Stratigraphy and Iron Mineralisation at McCamey’s North, Hamersley Province, Western AustraliaBy P J. Howard
Atlas Iron Limited’s McCamey’s North project lies at the eastern end of the Hamersley Basin, approximately 50 km east of Newman, Western Australia, and 3 km northeast of BHP Billiton’s Jimblebar Mine.
Jul 11, 2011
-
Effect of Carbon Type on Adsorption of Cu, Zn, Ag and Au from Mixed Cyanide SolutionBy S Lakemond, L I. Ku, J Vaughan
Conventional processing of poly-metallic gold containing flotation concentrates are challenging for a number of reasons. One reason is that substantial copper and zinc in the cyanide leach solution co
Sep 26, 2013
-
Cable Tunnel VentilationBy P Ridley
EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil
Mar 8, 2011
-
Can robots break the drill and blast bottleneck in underground roadway development in hard rock?By M Berner, N A. Sifferlinger, E Fimbinger
Today, the advance rate of underground roadway development by drill and blast operation is limited by the need to ventilate the toxic blast fumes after each cycle. In deep mines this usually is only p
Sep 1, 2024